UPDATES ON JCRB ACTIVITIES. DEC Meeting 11-12 June 2007 2 45 Member States 20 Associates of the CGPM (representing 30 over countries) 2 international.

Slides:



Advertisements
Similar presentations
Agency reviews: purpose and stages of the review process Achim Hopbach.
Advertisements

JCTLM REFERENCE LABORATORY SERVICES Report of WG2 November 14, 2005 _________________________________________.
CMCs and the BIPM Key Comparison Database Raul Fernando Solís Betancur 2012.
Current issues and trends in bibliographic control Overview of the Division’s interests and activities Bibliography Section Bohdana Stoklasova, Chair Talbott.
International Laboratory Accreditation Cooperation (ILAC) & International Accreditation Forum (IAF) 13 th International Legal Metrology Conference Sydney,
The Role of an NMI Related to the Implementation of Technical Directives Republic of Slovenia Ministry of Education, Science and Sport Metrology.
SOFTWARE QUALITY ASSURANCE Maltepe University Faculty of Engineering SE 410.
1 Developments in Metrology Ed W.B. de Leer NMi Van Swinden Laboratorium The Netherlands UNECE WP.6 Presentation 24 november 2004.
CMCs and the BIPM Key Comparison Database Raul Fernando Solís Betancur 2015.
1 CES IASSIST 2002, June 2002 University of Connecticut MetaNet: Standardising Statistical Metadata Methodology Karen Brannen University of Edinburgh,
Traceability to the SI: What does it mean in practice? Ms. Sally Bruce and Ms. Dana Leaman National Voluntary Laboratory Accreditation Program NIST.
ISO 9001:2015 Revision overview - General users
An introduction to the National Voluntary Laboratory Accreditation Program Sally Bruce, Chief for the National Voluntary Laboratory Accreditation Program.
Quality Assurance in the Bologna Process Fiona Crozier QAA
ISO 9001:2015 Revision overview - General users
Puppy Rearing Best Practice The Puppy Walking Development Project David Grice Operations Project Manager.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
1 Community-Based Care Readiness Assessment and Peer Review Team Procedures Overview Guide Department of Children and Families And Florida Mental Health.
Dr. Ilya Kuselman The National Physical Laboratory of Israel (INPL) Givat Ram, Jerusalem,
Academic Research Enhancement Award (AREA) Program Erica Brown, PhD Director, NIH AREA Program National Institutes of Health 1.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
TECO2005WRC/PMOD Quality Management1 The World Radiometric Reference and its Quality System ISO/IEC Wolfgang Finsterle, Isabelle Rüedi, and Silvio.
P1516.4: VV&A Overlay to the FEDEP 20 September 2007 Briefing for the VV&A Summit Simone Youngblood Simone Youngblood M&S CO VV&A Proponency Leader
TEMPUS INFORMATION DAYS Tajikistan, 18 November 2011 Alba-Chiara Tiberi, Project Officer EACEA TEMPUS IV- FIFTH CALL FOR.
On Site Review Process Office of Field Services Last Revised 8/15/2011.
IRES: an update on the revision process Vladimir Markhonko United Nations Statistics Division The 4 th meeting of the Oslo Group on energy statistics Ottawa,
Ulster.ac.uk A Revalidation Unit Co-ordinator’s Perspective Dr V. Naughton School of Biomedical Sciences, Faculty of Life & Health Sciences (October 2015)
1 The GCC Metrology Group GULFMET Mohammad Al Mulla GSO - Building for Integration
PROGRESS REPORT ABOUT COOMET ACTIVITIES (2007 – 2008) Dr. Goryslav Sydorenko COOMET President for OIML meeting October 27 – 31, 2008.
Regional Seminar on Promotion and Utilization of Census Results and on the Revision on the United Nations Principles and Recommendations for Population.
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
Overview of Grant Agreements - Agreement Process - Roadmap to the Agreement Document - Agreement Requirements/ Compliance Issues - Timelines for Reporting.
Application procedure From theory to practice Dieter H. Henzler, Steinbeis-Transfercenter Cultural Resources Management, Berlin.
SADCMET Presented by: Mr Donald Masuku SADCMET RC.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
1 Organisation Internationale de Métrologie Légale International Organization of Legal Metrology OIML 18/11/2004 UN-ECE WP.6 meeting 22 – 24 November 2004.
Presented by Sally Bruce, Quality Manager December 2015 Overview of the NIST Quality Management System.
1 Accreditor’s View of the Value of MRAs: the APLAC View Helen Liddy APLAC Secretary.
Deputy Head of Federal Accreditation Service Sergey V. Migin Approximation of accreditation systems of European Union and Russia.
1 Discussion APMP on: „Regional Cooperation in the Area of Metrology in Asia“/ November 23rd.
© A2LA Understanding the Accreditation Hierarchy - Who’s Who and What’s What ? NCSL International Conference Orlando, FL August 7, 2008 by Roxanne.
2006 NCSL International Workshop and Symposium August 07 Management of the AC-DC voltage transfer difference comparison in the SIM region Sara Campos CENAM.
1 THE PARTICIPATION IN THE CIPM MRA OF VMI Country Report of Vietnam at 14th meeting of APMP developing economies committee (DEC) Xi'an-China. 10th June.
Training for organisations participating in Peer Review of Paediatric Diabetes.
1 SUPPORT IN DEVELOPING BASIC METROLOGICAL INFRASTRUCTURES IN COOMET MEMBER COUNTRIES Dr. Pavel Neyezhmakov, Head of COOMET Secretariat National Scientific.
The Role of Metrology in Quality Infrastructure and PTB’s Technical Cooperation Programme in Eastern Europe ISO Regional Workshop on Conformity Assessment.
CCM Working Group on CMCs 1 Report on 11 May 2011 meeting of CCM-WGCMC & on Related Issues Chris Sutton, Chair Measurement Standards Laboratory of New.
1 Report on the BIPM/CIPM/CGPM Robert Kaarls Secretary CIPM October 2008.
APMP/TCFF meeting December 5 - 6, 2011 Kobe, Japan.
Theodore Papazoglou ERC/European Commission RTD, Directorate S Fax ERC Funding Actions/Grant Agreement Modalities.
INTERNATIONAL ELECTROTECHNICAL COMMISSION «Harmonization of the national accreditation system of Eurasian countries» 23 December 2013 Moscow World Trade.
1Johannesburg South Africa SMA May International Organization for Standardization.
National Institute of Metrology (Thailand) 1 TCQS Report in 17 th Meeting of APMP Developing Economies Committee Ajchara Charoensook APMP TCQS Chair.
Asia-Pacific Metrology Programme
Preparation of the Self-Study and Documentation
The revised Periodic Reporting Questionnaires: general features Alessandra Borchi Policy and Statutory Meetings Section UNESCO World Heritage Centre.
TCTF General Assembly Meeting Chair’s Report
Product Presentation Calibration Services.
8th CCAUV RMO WG meeting feed to CCAUV
CensusInfo in the Context of the 2010 World Population and Housing Census Programme By Margaret Mbogoni, Ph.D. United Nations Statistics Division.
CMC Submission and Reviewing Process
WORKING PRINCIPLES ECONOMIC COOPERATION ORGANIZATION REGIONAL COORDINATION CENTRE FOR IMPLEMENTATION OF THE ECO/FAO REGIONAL PROGRAMME FOR FOOD SECURITY.
the Republic of Kazakhstan
Overview of the FEPAC Accreditation Process
JCRB Report to the CCL Meeting
CMC submission from A to Z
How did we do it? Case examples from AIC
Status report of “Hybrid Comparisons as CMC Evidence”
Summary report of EC meeting I
HKAS Accreditation Service for Certification of Management System of RCHE Service Providers Mr WONG Wang-wah Assistant Commissioner for Innovation and.
Presentation transcript:

UPDATES ON JCRB ACTIVITIES

DEC Meeting June Member States 20 Associates of the CGPM (representing 30 over countries) 2 international organizations (184 NMIs + DIs) 45 Member States 20 Associates of the CGPM (representing 30 over countries) 2 international organizations (184 NMIs + DIs) THE CIPM MRA

DEC Meeting June OUTLINE Highlights of the 18 th Meeting Guide to the implementation of the CIPM MRA, CIPM MRA Logo, Seminars on the practical aspects of participation in the CIPM MRA

DEC Meeting June HIGHLIGHTS OF THE 18 TH MEETING Held in Muldersdrift, South Africa on 3-4 May It was attended by Twenty-six representatives from five Regional Metrology Organizations. The BIPM hopes to have its quality management system (QS) presented by an international panel of quality experts in Presentation to be conducted using guidelines provided by the document, Review of CMCs and the Monitoring and Reporting of the Operation of Quality Systems by International Intergovernmental Organizations, CIPM , first used in October 2006 to evaluate the IAEA. New calibration and measurement capability (CMC) definition. currently defined in JCRB 8/18 analogously, ILAC defined best measurement capability (BMC) ILAC and the CIPM agreed that these terms are identical the use of the two terms has created confusion in the metrology and accreditation communities alike. ILAC and CIPM have been working to develop a new common definition. new definition expected by November 2007 for approval by CIPM and ILAC GA.

DEC Meeting June PROPOSED NEW CMC DEFINITION In the context of the CIPM MRA and ILAC Arrangement, and in relation to the CIPM-ILAC Common Statement, the following shared definition is agreed upon: a CMC is a calibration and measurement capability available to customers under normal conditions, (a) as published in the BIPM key comparison database (KCDB) of the CIPM MRA or (b) as described in the laboratory’s scope of accreditation granted by a signatory to the ILAC Arrangement. A number of explanatory notes follow.

DEC Meeting June HIGHLIGHTS OF THE 18 TH MEETING Finished work on the document Recommendations for on-site visits by peers and selection criteria for on-site visit peer reviewers. document will help the RMOs with the task of mounting peer evaluations of NMI programs. document has now been recommended to the CIPM for approval in November RMOs are to develop processes to monitor changes to published CMCs from their NMIs after the results of comparisons become available. lack of such a processes is creating confusion among the RMO and CC WGs. RMO processes will be presented to the JCRB for comments by other RMOs. after JCRB consensus, the new processes will help reduce confusion. RMOs were encouraged only to use the “get published” CMC Excel tables at the JCRB web site before requesting changes to published CMCs. username: tcguest, password: tcontact Using these official versions of the published CMC tables greatly speeds the modification process and reduces sources of error in the KCDB.

DEC Meeting June HIGHLIGHTS OF THE 18 TH MEETING RMOs were asked to encourage their NMI Directors to provide designation information to the Director of the BIPM via the form available at the BIPM website (see RMOs were encouraged to inform the Executive Secretaries of the CCs, in advance, of all comparison using the form available in the JCRB web site (see Consult your RMO representative to the JCRB for more information on these and other topics considered by the JCRB during its last meeting. Full list of JCRB representatives is available at the JCRB web site (see You can monitor the review of your CMCs at the JCRB restricted web site (see hyperlink) using the username tcguest and password tcontact. Next meeting: Ottawa, Canada, September 27-28, 2007

DEC Meeting June UNDER DEVELOPMENT: GUIDE TO THE OPERATION OF THE CIPM MRA The guidelines for the implementation of the CIPM MRA are contained in a number of JCRB and CIPM documents. The everyday use of this material is becoming difficult for even everyday users. With the help of PTB’s Technical Cooperation Department, we are developing a short new document that describes the practical implementation of the CIPM MRA for the NMI laboratory staff. The document makes use of hyperlinks to all current documents as a means to provide the reader with more detail information on any subject. The Guide should be available for CIPM approval on November An electronic version will be available at the BIPM website.

DEC Meeting June NOW AVAILABLE: CIPM MRA LOGO A logo for the CIPM MRA is now available for voluntary inclusion in the calibration certificates of NMIs and DIs participating in the CIPM MRA. The purpose of the Logo is to draw the attention of the customers of NMIs and DIs participating in the CIPM MRA, and other interested parties, to the recognition by all other signatories of the CIPM MRA of the validity of the calibration certificates bearing it. A new CIPM document (CIPM ) describing the guidelines for the use of the logo is available at the CIPM MRA section of the BIPM website. Only the Directors of the NMIs or DIs interested in using the CIPM MRA Logo can request the use of the Logo from the Director of the BIPM. The NMIs and DIs duly authorized to use the CIPM MRA Logo are listed in the CIPM MRA section of the BIPM website. (authorized: 55 laboratories)

DEC Meeting June SEMINAR ON PARTICIPATION IN THE CIPM MRA Many NMI staff are not fully aware of how to make use of the CIPM MRA. This is specially true in NMIs who are yet to participate in the CIPM MRA. Their participation would increase the importance of the CIPM MRA and could help those NMIs reduce TBTs. A series of worldwide seminars is being considered to aid new NMIs with their first steps in their participation in the CIPM MRA. The seminar will bring together NMI decision makers with RMO representatives to develop strategies to craft CMCs tables and get them approved by the inter-RMO review process.

DEC Meeting June ST SEMINAR: SOUTH AFRICA Where: Muldersdrift (ZA). When: May 2-3, Participants: LACOMET (CR), SIM DZM (HR), EUROMET NIS (EG), associate member of SADCMET & APMP JCRB Representatives KazInMetr (KZ), COOMET KEBS (KE), associate member of SADCMET VMI (VN), APMP

DEC Meeting June ST SEMINAR: SOUTH AFRICA Where: Muldersdrift (ZA). When: May 2-3, Presentations: NMI overviews – p rovided by all 6 laboratories. Each presentation covered the following topics description of the metrology infrastructure in the country and how the NMI fits into it. description of the NMI – organizational chart, staff distribution (i.e., administration, technicians, scientist, etc.), budget, facilities, major proposed changes (if any). description of the NMI’s current affiliations with any of the RMOs. brief history of the NMI’s participation in the CIPM MRA – signing date, any Key Comparison activities, any CMC review activities. description of the metrology area where the NMI plans to make your first CMC submission, including the proposed schedule for such submission. description of the major roadblocks that the NMI anticipates to the submission of CMCs.

DEC Meeting June ST SEMINAR: SOUTH AFRICA Presentations: CIPM-MRA fundamentals CMCs and how to smoothly navigate their review process. Pedro Espina, Executive Secretary of the JCRB The KCDB and strategies for participating in comparisons. Claudine Thomas, KCDB Manager Quality Management Systems and how to secure international recognition. Bob Kaarls, Secretary of the CIPM The first CMC submission: lessons learned. Hernando J. Flórez R., Director CENAMEP Development of workplans for implementation of the CIPM MRA in each NMI. That evening, each NMI worked with JCRB experts in developing a CIPM MRA implementation strategy aimed at having published CMCs in at least one technical area by November Final presentations: each of the 6 laboratories presented their plans for their first CMC submissions and the audience provided feedback to them.

DEC Meeting June ST SEMINAR: SOUTH AFRICA Follow-up: NMIs are to continue to implement their strategies with the help of their RMOs The BIPM will follow up every 90 days to check on progress and provide advice There will be a follow-up meeting in PTB, Braunschweig (DE) in February 2008.

DEC Meeting June RESTRICTED JCRB WEBSITE ACCESS Username: tcguest Password: tcontact

DEC Meeting June THANK YOU FOR YOUR ATTENTION