General Information Total Installed Capacity 2015 =3180 Demand– 2015 =11793GWH Maximum demand = 2600 MW Number of Customers2014. =2, Energy Access up to now = 45 % Average Annual Growth = 14 % 2
Moderate2,6713,3173,5633,7683,9644,1724,3854,589 Base3,0103,6873,9924,2734,5354,7995,0535,302 High3,3564,1364,5374,8925,1905,4725,7355, ,7915,0345,2775,5165,7616,0086,2576,510 5,5375,7976,0616,3296,5976,8687,1457,427 6,2286,5156,8087,1067,4117,7228,0398,361
The main objective of these projects is to supply Sudan National Grid with clean, sustainable, eco- friendly energy with low operating cost. 5
6
Location: Tokar south of Port Sudan, Red Sea State. Generation Capacity: 180MW Status: wind measurement ongoing. Feasibility study : ongoing. Funding : Needed. Red Sea wind farm 7
Location: Dongla North State. Generation Capacity: 200MW Status: wind speed 7.2 m/sec 60 m above ground level. Feasibility study : Available. Funding : Needed. Dongla wind farm 8
Location: Nyala. Capacity: 20MW. It will be implemented in two phases, 10 MW each. Annual average wind speed: 7.9 m/s. Feasibility study: available Land: Available.Fund : Needed 9
Average wind speed 4.2 – 8.1 meter/second at 80 meters above ground level (agl) Areas with highest wind speed: o Red Sea o Northern Sudan (Dongola) o Jabel Marra Mountains in western Sudan 10
11
Capacity: 10 MW Location: Khartoum Feasibility Study available & Techincal specs avaible. Funding : Needed 12
Capacity: 5 MW Location: Nyala Feasibility Study : available. Land available. Funding : Needed 13
Capacity: 3 MW Location: Al Fashir Feasibility Study : available Funding : Needed 14
Capacity: 2 MW Location: Al Geniena Feasibility Study : available Funding : Needed 15
From Capacity 50 w- 100 w- 200w For areas which will not be covered from grid till 2031 Number of houses planned to be covered
Average daily solar irradiation: 5.8 – 7.2 kWh/m 2 The solar radiation increases in northern and west-northern areas and decreases towards the south 17
The idea is to use the channels of agricultural projects to build small hydro units. Channels of Aljazeera Scheme an Alrahad were selected The potential is 63 MW Feasibility study: Needed Fund: Needed. 18
There is potential for generation of electricity from waste Initial information show that 50 MW can be generated at Khartoum area and 3 MW can be generated at six towns Feasibility Study: Needed Fund: needed 19