David Foster, CERN LHC T0-T1 Meeting, Cambridge, January 2007 LHCOPN Meeting January 2007 Many thanks to DANTE for hosting the meeting!! Thanks to everyone.

Slides:



Advertisements
Similar presentations
T1-NREN Luca dell’Agnello CCR, 21-Ottobre The problem Computing for LHC experiments –Multi tier model (MONARC) –LHC computing based on grid –Experiment.
Advertisements

FNAL Site Perspective on LHCOPN & LHCONE Future Directions Phil DeMar (FNAL) February 10, 2014.
Trial of the Infinera PXM Guy Roberts, Mian Usman.
LHC high-level network architecture Erik-Jan Bos Director of Network Services SURFnet, The Netherlands T0/T1 network meeting NIKHEF/SARA, Amsterdam, The.
Questionaire answers D. Petravick P. Demar FNAL. 7/14/05 DLP -- GDB2 FNAL/T1 issues In interpreting the T0/T1 document how do the T1s foresee to connect.
Connect. Communicate. Collaborate Place your organisation logo in this area End-to-End Coordination Unit Toby Rodwell, Network Engineer, DANTE TNLC, 28.
1 ESnet Network Measurements ESCC Feb Joe Metzger
NORDUnet NORDUnet The Fibre Generation Lars Fischer CTO NORDUnet.
SC4 Workshop Outline (Strong overlap with POW!) 1.Get data rates at all Tier1s up to MoU Values Recent re-run shows the way! (More on next slides…) 2.Re-deploy.
Connect. Communicate. Collaborate GGF 16 - Athens, Greece, February 14, 2006 Optical Private Network (OPN) support of Grid e-Science Projects: A GÉANT2/NREN.
HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald Steven McDonald TRIUMF Network & Computing Services Canada’s National Laboratory.
WLCG Service Report ~~~ WLCG Management Board, 24 th November
Using E2E technology for LHC Apr 3, 2006 HEPiX Spring Meeting 2006
Connect communicate collaborate LHCONE L3VPN Status Update Mian Usman LHCONE Meeting Rome 28 th – 29 th Aprils 2014.
InterDomain Dynamic Circuit Network Demo Joint Techs - Hawaii Jan 2008 John Vollbrecht, Internet2
1 Measuring Circuit Based Networks Joint Techs Feb Joe Metzger
Thoughts on Future LHCOPN Some ideas Artur Barczyk, Vancouver, 31/08/09.
Bas Kreukniet, Sr Network Specialist at SURF SARA NL-T1 Expectations, findings, and innovation Geneva Workshop 10 Februari 2014.
LHC Open Network Environment LHCONE David Foster CERN IT LCG OB 30th September
1 LHC-OPN 2008, Madrid, th March. Bruno Hoeft, Aurelie Reymund GridKa – DE-KIT procedurs Bruno Hoeft LHC-OPN Meeting 10. –
TRIUMF a TIER 1 Center for ATLAS Canada Steven McDonald TRIUMF Network & Computing Services iGrid 2005 – San Diego Sept 26 th.
Connect. Communicate. Collaborate Seite 1 Cross Border Fibre for LHC Network Klaus Ullmann, Martin Wilhelm DFN-Verein.
INFN TIER1 (IT-INFN-CNAF) “Concerns from sites” Session LHC OPN/ONE “Networking for WLCG” Workshop CERN, Stefano Zani
Connect. Communicate. Collaborate perfSONAR MDM Service for LHC OPN Loukik Kudarimoti DANTE.
Nikhef/(SARA) tier-1 data center infrastructure
From the Transatlantic Networking Workshop to the DAM Jamboree to the LHCOPN Meeting (Geneva-Amsterdam-Barcelona) David Foster CERN-IT.
NORDUnet Nordic Infrastructure for Research & Education Workshop Introduction - Finding the Match Lars Fischer LHCONE Workshop CERN, December 2012.
ATLAS Bulk Pre-stageing Tests Graeme Stewart University of Glasgow.
Connect. Communicate. Collaborate Using PerfSONAR tools in a production environment Marian Garcia, Operations Manager, DANTE Joint Tech Workshop, 16 th.
LCG Report from GDB John Gordon, STFC-RAL MB meeting February24 th, 2009.
Connect communicate collaborate LHCONE Diagnostic & Monitoring Infrastructure Richard Hughes-Jones DANTE Delivery of Advanced Network Technology to Europe.
Plans for Service Challenge 3 Ian Bird LHCC Referees Meeting 27 th June 2005.
9 th November 2005David Foster CERN IT-CS 1 LHCC Review WAN Status David Foster Networks and Communications Systems Group Leader.
SL5 Site Status GDB, September 2009 John Gordon. LCG SL5 Site Status ASGC T1 - will be finished before mid September. Actually the OS migration process.
Distributed Analysis Tutorial Dietrich Liko. Overview  Three grid flavors in ATLAS EGEE OSG Nordugrid  Distributed Analysis Activities GANGA/LCG PANDA/OSG.
Connect communicate collaborate LHCONE European design & implementation Roberto Sabatino, DANTE LHCONE Meeting, Washington, June
GDB, 07/06/06 CMS Centre Roles à CMS data hierarchy: n RAW (1.5/2MB) -> RECO (0.2/0.4MB) -> AOD (50kB)-> TAG à Tier-0 role: n First-pass.
Connect. Communicate. Collaborate LHCOPN lambda and fibre routing – Episode 3 Michael Enrico Network Engineering & Planning Manager DANTE LHC Meeting,
1 LHCOPN Monitoring Directions January 2007 Joe Metzger
David Foster, CERN GDB Meeting April 2008 GDB Meeting April 2008 LHCOPN Status and Plans A lot more detail at:
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN Operational model: Roles and functions.
David Foster, CERN LHC T0-T1 Meeting, Seattle, November November Meeting David Foster SEATTLE.
IT-INFN-CNAF Status Update LHC-OPN Meeting INFN CNAF, December 2009 Stefano Zani 10/11/2009Stefano Zani INFN CNAF (TIER1 Staff)1.
Summary of SC4 Disk-Disk Transfers LCG MB, April Jamie Shiers, CERN.
LHC-OPN operations Roberto Sabatino LHC T0/T1 networking meeting Amsterdam, 31 January 2006.
LHCOPN operational model Guillaume Cessieux (CNRS/FR-CCIN2P3, EGEE SA2) On behalf of the LHCOPN Ops WG GDB CERN – November 12 th, 2008.
100GE Upgrades at FNAL Phil DeMar; Andrey Bobyshev CHEP 2015 April 14, 2015.
LHC high-level network architecture Erik-Jan Bos Director of Network Services SURFnet, The Netherlands T0/T1 network meeting CERN, Geneva, Switzerland;
Connect. Communicate. Collaborate Place your organisation logo in this area End-to-End Coordination Unit Marian Garcia, Operations Manager, DANTE LHC Meeting,
17 September 2004David Foster CERN IT-CS 1 Network Planning September 2004 David Foster Networks and Communications Systems Group Leader
ATLAS Computing Model Ghita Rahal CC-IN2P3 Tutorial Atlas CC, Lyon
1 Network Measurement Challenges LHC E2E Network Research Meeting October 25 th 2006 Joe Metzger Version 1.1.
LHCOPN / LHCONE Status Update John Shade /CERN IT-CS Summary of the LHCOPN/LHCONE meeting in Amsterdam Grid Deployment Board, October 2011.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ENOC status LHC-OPN meeting – ,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operating an Optical Private Network: the.
T0-T1 Networking Meeting 16th June Meeting
LHCOPN lambda and fibre routing Episode 4 (the path to resilience…)
LHC[OPN/ONE]  IPv6  status
LHC T0/T1 networking meeting
LHCOPN/LHCONE status report pre-GDB on Networking CERN, Switzerland 10th January 2017
“A Data Movement Service for the LHC”
LHCONE status and future
LHCOPN update Brookhaven, 4th of April 2017
InterDomain Dynamic Circuit Network Demo
Summary from last MB “The MB agreed that a detailed deployment plan and a realistic time scale are required for deploying glexec with setuid mode at WLCG.
Thanks to everyone for attending!!
ESnet Network Measurements ESCC Feb Joe Metzger
MB Maarten Litmaath CERN v1.0
IPv6 update Duncan Rand Imperial College London
Aries Hung ASGC OPS, ASGCNet
Presentation transcript:

David Foster, CERN LHC T0-T1 Meeting, Cambridge, January 2007 LHCOPN Meeting January 2007 Many thanks to DANTE for hosting the meeting!! Thanks to everyone for attending!!

David Foster, CERN LHC T0-T1 Meeting, Cambridge, January 2007 Logistics GEANT-2 Shared WEP Access 834CA9972E Need to finish at 3.30 (so people can get 18:00-19:00 flights ….) –Need to shorten lunch …..

David Foster, CERN LHC T0-T1 Meeting, Cambridge, January 2007 Objectives Last meeting we identified some issues –Routing issues with some sites –How to turn the OPN into a network (backup paths)? –How to evolve monitoring? –Are sites taking the security issues seriously? –E2ECU and ENOC evolution. –What can this group do to help T2 connectivity? Some actions –Evolve the working groups New monitoring activity has been started under Joe Metzger Evolve the routing working group to a long term technical operations group – not done yet, still some issues. This meeting will give updates on progress on the Issues. We need to move towards an increased “production” mode of operation now.

David Foster, CERN LHC T0-T1 Meeting, Cambridge, January 2007 Conclusions Clarity on OPN –Does it carry T2-* traffic – NO –Does it carry T1-T1 traffic – YES T0-T1 traffic is well below 10G level. T1’s can exchange between themselves at less than best effort (T0-T1 flows have priority) If they need to. This is a decision of the T1’s themselves. –Does it include CBF links – YES –A lightpath is part of the OPN (circuit governed by OPN policies). This may be less than a physical lambda which carries other types of traffic. This should be documented however. Backup Paths –Can we understand the dynamics? Are we sure that we understand how (over)loading will work. (Edoardo) –What is missing for a complete(!) plan? (Edoardo) –Test Plan – test automation and functioning also at the application level. (Don+Kors+Bruno) –Critical due to expected support hours (limited in many cases to extended working hours) T1-T1 traffic to be announced. (Edoardo) RAL needs to move to a public AS number (Robin) Security/Operations Policy – are sites taking it seriously? Is there any need for an “operations” officer and what tools would he have? –Long term tech ops working group - evolution of the routing working group –ENOC could do the surveillance given the right tools. –Active monitoring tools? How should we organise this? (DF to organise) E2e service quality – active tools Traffic sampling and analysis Applicable also for t2-t1 circuits? How to advise on T2 connectivity? –Instrumentation at T2’s, distributed by LCG. US-Atlas will deploy NDT in the US. Has a kernel requirement. –Remote T2’s connectivity. Global extension of the E2ECU beyond Europe. (Roberto) PR Tool – weathermap, globe, links, (Roberto) Need work plan for the ENOC beyond transition. (Mathieu) Next Meeting When? (12t h Jan) Where: Cambridge (Florida Intl Uni. Miami - Spring)

David Foster, CERN LHC T0-T1 Meeting, Cambridge, January 2007 OPN Status Summary September 2006 LinkStatusNominal E2e Capacity Provider ChangesExpected BNLOPN Production10GColt->Colt1/11/06 FNALOPN Production10GGC->Qwest1/1/07? TRIUMFOPN Production2G (limited CERN- AMS) GN2 Lambda CERN-AMS Q4/06 (Need OME 6500 at CERN) ASGCOPN Production2G (2.5G to AMS)GN2 Lambda CERN-AMS Q4/06 (Need OME 6500 at CERN) NDGFGN2 IPGN2 lambdaQ1/07 SARAOPN Production10GSurfNet->GN2Q4/06 RALOPN TEST10GOct 1 st 2006 FZKOPN TEST/GN2 IP10GOct 15 th 2006 CNAFOPN Production10G IN2P3OPN Production10G PICGN2 IPGN2 lambdaBarcalona-CERN Mid Oct. PIC- >Rediris a problem

David Foster, CERN LHC T0-T1 Meeting, Cambridge, January 2007 OPN Status Summary January 2007 LinkStatusNominal E2e CapacityProvider ChangesExpected BNLOPN Production10GColt->ColtDone FNALOPN Production10GGC->Qwest1/1/07? TRIUMFOPN Production2G (limited CERN- AMS) GN2 Lambda CERN-AMS ASGCOPN Production2G (2.5G to AMS)GN2 Lambda CERN-AMS NDGFGN2 IP/OPN Production 10G (Copenhagen)GN2 LambdaRouting Issues. GN2 IP used for now SARAGN2 IP/OPN Production 10GGN2 LambdaRouting Issues. GN2 IP used for now RALOPN Production10GWaiting for public AS number FZKOPN Production10G CNAFOPN Production10G IN2P3OPN Production10G PICGN2 IPGN2 lambdaQ1/07

David Foster, CERN LHC T0-T1 Meeting, Cambridge, January 2007 CBF Status Summary September 2006 LinkStatusNominal E2e Capacity Provider Changes Expected SARA - NDGF10GQ1/07 SARA - FZKIn Test10GQ1/07 FZK - CNAFIn Place10G FZK - CERN10GDFN/SwitchTo be Decided BNL - FNALIn Place (from GC) 10GTo ESnetTo be Decided FZK – IN2P3In Place10GQ1/07 Other Links Summary LinkStatusNominal E2e Capacity Provider Changes Expected ManLan - Netherlight Ordered10GGC1/1/07 Netherlight - CERN Surfnet to make request to GN2 Exec 10GGN21/1/07

David Foster, CERN LHC T0-T1 Meeting, Cambridge, January 2007 CBF Status Summary January 2007 LinkStatusNominal E2e Capacity Provider ChangesExpected SARA - NDGF10GQ1/07 SARA - FZKIn Place. Unused10G FZK - CNAFIn Place. Unused10G FZK - CERN10GDFN/SwitchTo be Decided BNL - FNALIn Place (from GC)10GTo ESnetTo be Decided FZK – IN2P3In Place10GQ1/07 Other Links Summary LinkStatusNominal E2e Capacity Provider Changes Expected ManLan - Netherlight Ordered10GGC1/1/07 Netherlight - CERN Surfnet to make request to GN2 Exec 10GGN21/1/07

David Foster, CERN LHC T0-T1 Meeting, Cambridge, January 2007 Words of Caution The LCG “Megatable” activity aims to provide a “bottom up” view of the network requirements. Some figures appear to be peak (T0/T1/T1) and some average (T1/T2). All figures probably have been generated from simple models of data movement for the “standard” data movement cases. The numbers are changing all the time. Conclusion: Whilst it gives minimalist “order of magnitude” requirements for the most basic network needs, network provisioning (which takes a long time) needs to work to a model based more on future predicted behaviour, capability and availability.

David Foster, CERN LHC T0-T1 Meeting, Cambridge, January 2007 Megatable OPN Rates T0-T1 (MB/sec)T1-T1 In (MB/sec)Total In Gb/secT1-T1 Out (MB/sec)Total Out Gb/sec ASGC BNL CERN CNAF FNAL FZK IN2P NDGF NIKHEF PIC RAL TRIUMF ALICE US T

David Foster, CERN LHC T0-T1 Meeting, Cambridge, January 2007 Megatable GP IP Rates T2-T1 In (MB/sec)Total In Gb/secT1-T2 Out (MB/sec)Total Out Gb/sec ASGC BNL CERN CNAF FNAL FZK IN2P NDGF NIKHEF PIC RAL TRIUMF ALICE US T