Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerup 1 1.Scheduled by OCR. 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR.

Slides:



Advertisements
Similar presentations
The Cold Stowage group retrieves payloads that have returned from the International Space Station via the SpaceX Dragon Capsule. They utilize NASAs C9.
Advertisements

FLIGHT SCHEDULE MONITOR (FSM)
Rodent Habitat (RH) & Rodent Research (RR) Concept of Operations December 2013 ARC/Cecilia Wigley Rodent Research Operations Manager JSC/Brienne Shkedi.
Annie Griffith Infrastructure Programme Manager 12 th July 07 Gemini Oracle Software Upgrade (OSU) Project.
Data QA/QC Techniques. Copyright VIM Technologies, Inc. All Rights Reserved. VIM’s 10-Step Program To Compliance Success 2.
Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL W912DY-08-D-0020 TO 0012 Pre Construction Meeting Pre Construction Meeting.
Copyright© 2003 Avaya Inc. All rights reserved PUBVT Loading and Implementation instructions for the Pre-upgrade, Backup Verification Tool.
Lesson 14: Installing and Uninstalling Programs how to install a new program what to do if the new program doesn’t work how to uninstall a program © CCI.
MagicInfo Pro Scheduler Now that a template has been created from content imported into the Library, the user is ready to begin scheduling content to.
TEAM Basic TotalElectrostatic ManagementAwareness&
TELE 301 Lecture 10: Scheduled … 1 Overview Last Lecture –Post installation This Lecture –Scheduled tasks and log management Next Lecture –DNS –Readings:
Chapter Six Maintaining a Computer Part II: Installing, Repairing, and Removing Applications.
Right90 Customer Success Program Program Description & WOW Support Programs.
NERC Lessons Learned Summary LLs Published in September 2015.
KSC Ground Operations Timeline. KSC CGSE TIM A Technical Interchange Meeting regarding the Cryo Ground Support Equipment was held at KSC November 1 st.
Microgravity Science Glovebox Video Overview. Course: MSG05 Version: May 2014 For Training Purposes Only Course Description  Detailed presentation of.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama BRIC-17 TIR Overview Aug 28, 2012 Tony Cox EO20.
MSFC Payload Training bs/kh/ExpPldsTST#1/ 3/18/2016 Page 1 Astroculture-8 (ADVASC) TST #1 April 27, 1998 DTM/Beth Skidmore NASA/MSFC Training Branch Voice.
Introduction to Payload Planning Will Kirby (256)
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
A. Maillet, POIWG#25, Feb 3-5, Inc Experiments supported by CADMOS and using the EPM Alain MAILLET CADMOS
MSG Seal Replacement Mission Scenario Pre-Pack List (SOC OCR – ULF 1.1) MSG Front Window Exchange MSG Glove Rings & Feed- through Install MSG.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
1 JEM PAYLOADS Off Console Plan Yoshio Toukaku / JAXA Kensuke Teranishi / JAMSS January 31, 2013 Notice : This technical data is furnished on the condition.
Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama TIR overview for UBNT.
EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures 1:15 BODYM-NODE2-VID R5 :15 1:25 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG #34 July 23, 2013 Tim Horvath Payload Ops Director
Baseline 12/09/10 TDC Day 5 Combination Protocol Overview Controlled/Monitored Diet Ops Urine Ops 5 Sessions/Subject: FDs 15, 30, 60, 120, & 180; FDs correspond.
Urine Monitoring System (UMS) ISS UMS is a redesigned version of the Shuttle UMS.
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
EMCS Inc 13 Operations Gary Moore EMCS Ops Lead (256)
OC Team Ops Notes. Jenn Whitworth I2 PRO What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO)
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Payload Systems.
EO10-PPO-118 parcall /2/15 PARC/M.Cash MOON IMAGERY 0:10 Crew Commanding Time Critical Unattended Additional Activities TEXT FLEXIBLE MOON-CAMERA-FOCUS.
Baseline Review 05/20/14 PARC/Martha Cash RapidScat EPF-SDX INSTALLATION-HEATERS ON ADAPTER and INSTRUMENT Crew Commanding Unattended Time Critical External.
Revision G 8/22/13 PARC/T. Cassady Pro K  FD15 (+/- 5 days), FD30 (+/- 14 days), FD60 (+/- 14 days), FD120 (+/- 14 days), and FD180/R-14 (+14/-0 days)
Baseline 06/10/10 TDC Combination Protocol Overview Controlled/Monitored Diet Ops Urine Ops 5 Sessions/Subject: FDs 15, 30, 60, 120, & 180; FDs correspond.
E-USOC operations in Increments José Miguel Ezquerro Navarro E-USOC/UPM Jul 2010POIWG#28 - Huntsville, AL.
February 14, 2013 POIWG Technical Overview CR / HM-3430 Ku Forward Capability.
EO10-PPO-051 Revision T 9/25/15 PARC/T. Cassady HRF Rack 2 8PU Drawer Installation and Configuration 1:00 TEXTFlexible Crew  Sessions required as needed.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
GRAVI2 POIWG #34, July 24 th 2013 Abdul Basit Mohammad N-USOC-NOT-ABM-028, Abdul Basit Mohammad1.
PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL-MICAST-EVAC CMD: 0/05:00 MSL-MICAST-HEAT1 CMD: 0/02:00 MSL-MICAST-HEAT2 CMD: 0/04:00 MSL-MCS212-EQUIL.
Revision A 12/19/12 PARC/T. Cassady Spinal Ultrasound SPINAL-S/W-REV_OPR SPINAL-CREW-CONF_OPR Operator Software Review and Crew Conference Ops before Spinal.
Lisa Prendergast EO20/ Operations Lead January
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama OCR Etiquette Jimmy Whitaker.
EO10-PPO-020 OCR emcs /15/14 PARC/C. Traylor Crew Additional Activities Unattended EMCS Facility Cleanup Post Gravi-2 Ops EMCS-GASRMV MOD-RPL :20.
Copyright © 2010 Pearson Education, Inc. or its affiliate(s). All rights reserved.1 | Assessment & Information 1 Online Testing Administrator Training.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Date: March 3, 2011 Originator: Tricia Pittman/EO20.
EO10-PPO-056 Revision I 9/24/14 PARC/T. Cassady Portable PFS :20 BP Microphone Replacement TEXTFlexible Crew  Sessions required once every 18 months (within.
Copyright © 2009 Boeing. All rights reserved. ISS | Space Exploration 1 EXPRESS Payload Simulator Operations Technical Interchange Meeting (TIM) Amanda.
SFU Samples Run (Sample Number) A (1) G1 Video C (1) B (2) C (2) B (3) C (3) B (4) C (4) B (5) C (5) B (6) C (6) B (7) C (7) BCAT-C1 Simon Fraser University.
Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Platform-X Install & Activate.
PARC/D. Westbrook Revision B 10/23/13 SODI Procedure Review SODI-PROC-REVIEW :30 A Crew Additional Activities TEXT Flexible.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama SPHERES Smartphone TST.
This document is the property of EADS SPACE. It shall not be communicated to third parties without prior written agreement.Its content shall not be disclosed.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
CPCG-HM Overview POIWG July 26, 2012 Brittney Macon 1.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
POD Team PARC/M. Barnett EO10-PPO-079 Revision F 8/10/15 Payload Crew Conference :30 PAYLOAD-CREW-CONF (at least twice per increment, monthly preferred)
OC Team Ops Notes. Jenn Whitworth I2 PRO What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO)
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Radiation Environment Monitor Kevin Hargrave EO
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory ISS Ham Planning Operations.
CBSE Cold Stowage Hardware Overview William Crysel UAB/CBSE
Higher Active Logic Build Three (HAL 3) PLMDM Bundle Update Express Rack 4 Update David K Deitsch Marshall Space Flight Center Payload Operations & Integration.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Initial MELFI Facility.
Revision E 12/19/12 PARC/E. Litkenhous JAXA-SDRM WGVOPN-PLC PRO-SDRM ACT-CMD 1:00 SpaceDRUMS Experiment Operations SDRM-EXP-POWER UP Nominal Operations.
11/11/2018 Desktop Virtualization Corey Hynes Kyle Rosenthal President Technical Lead HynesITe Inc Spider Consulting @windowspcguy.
AMS Summary 16:00 on Fri 12 Apr 2019 (GMT 102) To
Presentation transcript:

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerup 1 1.Scheduled by OCR. 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR NET 2 days 1:00 PRO-GLCR# ACT-CMD 24 hrs GLACIER#-HW-COOLDN Payload Cold Stowage 4:00 GLACIER#-DNLK-CMD 24 hrs GLACIER#-DSC PK-SWP :15 Commanding Unattended Crew Additional Activities # = 2, 3, 4, 5, or removed for Glacier (Unit 1)

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Crew Powerup 1 1.Scheduled by OCR. 24 hrs 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR Commanding Unattended Crew NET 2 days 1:00 PRO-GLCR# ACT CR-CMD :10 24 hrs GLACIER#-HW-COOLDN Payload Cold Stowage 4:00 GLACIER#-DNLK-CMD GLACIER#-HW-PWRUP Additional Activities # = 2, 3, 4, 5, or removed for Glacier (Unit 1) GLACIER#-DSC PK-SWP :15

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerdown 1 1.Scheduled by OCR. GLACIER#-HW-PWR Commanding Unattended Crew 2 days 1:00 PRO-GLCR# DACT-CMD 4:00 GLACIER#-DNLK-CMD (GMT 1500) :15 GLACIER#-DSC PK-SWP 1:00 GLACIER#-DNLK-CMD # = 2, 3, 4, 5, or removed for Glacier (Unit 1)

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Crew Powerdown 1 1.Scheduled by OCR. GLACIER#-HW-PWR Commanding Unattended Crew 2 days PRO-GLCR# DCT CR-CMD 4:00 GLACIER#-DNLK-CMD (GMT 1500) :10 GLACIER#-DSC PK-SWP 1:00 :15 GLACIER#-HW-SHUTDN # = 2, 3, 4, 5, or removed for Glacier (Unit 1)

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Downlink Commanding GLACIER#-HW-PWR Commanding Unattended 4:00 GLACIER#-DNLK-CMD (Thurs GMT 1500 weekly and as required to support payload user (see Payload PPO)) # = 2, 3, 4, 5, or removed for Glacier (Unit 1)

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 EXPRESS Rack Deactivation/Activation During Ops GLACIER#-HW-PWR 4:00 GLACIER#-DNLK-CMD PRO-GLCR# DACT-CMD GLACIER#-HW-PWR 1:00 4:00 GLACIER#-DNLK-CMD PRO-GLCR# ACT-CMD Commanding Unattended Additional Activities 1:00 # = 2, 3, 4, 5, or removed for Glacier (Unit 1) EXPRESS Rack Deactivation/ Activation (see EXPRESS Rack PPO)

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 POIC Maintenance Outage GLACIER#-HW-PWR :10 GLACIER#-STATUS-CK (every 2 hours while powered) Unattended Crew HPOC Active Yes No No activities required Additional Activities # = 2, 3, 4, 5, or removed for Glacier (Unit 1)

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 MTL to AAA 1 1.Scheduled by OCR. GLACIER#-AAA-PWR GLACIER#-HW-PWR Commanding Unattended :30 4:00 GLACIER#-DNLK-CMD PRO-GLCR# MTLOFF-CMD # = 2, 3, 4, 5, or removed for Glacier (Unit 1)

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 GLACIER#-AAA-PWR Filter Cleaning 1 :30 Unattended Crew GLACIER#-FLTR-CLEAN (every 90 total days on AAA) GLACIER#-AAA-PWR 1.PRO command windows should not be scheduled for filter cleaning. Crew performs power down/up to minimize power off time. # = 2, 3, 4, 5, or removed for Glacier (Unit 1)

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 AAA to MTL 1 1.Scheduled by OCR. GLACIER#-HW-PWR GLACIER#-AAA-PWR Commanding Unattended 4:00 GLACIER#-DNLK-CMD :30 PRO-GLCR# MTLON-CMD # = 2, 3, 4, 5, or removed for Glacier (Unit 1)

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 GLACIER#-HW-PWR Sample Insert/Retrieve 1 GLACIER#-SMPL-INS OR GLACIER#-SMPL-RTRV Unattended Crew # = 2, 3, 4, 5, or removed for Glacier (Unit 1) 1.Scheduled by OCR. 2.Duration may be reduced to 5 minutes for activities that meet the 5/10/15 Minute Scheduling Exceptions. :10 2

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Desiccant Pack Insert/Remove 1 1.Scheduled by OCR. :15 Unattended Crew GLACIER#-DSC PK-INS OR GLACIER#-DSC PK-RMV GLACIER#-HW-PWR # = 2, 3, 4, 5, or removed for Glacier (Unit 1)

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Desiccant Canister Insert 1 1.Scheduled by OCR. :15 GLACIER#-DSCCNT-INS Unattended Crew GLACIER#-HW-PWR FlexibleTEXT # = 2, 3, 4, 5, or removed for Glacier (Unit 1)

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Door Lock/Unlock 1 1.Scheduled by OCR. :15 Unattended Crew GLACIER#-DOOR-LOCK OR GLACIER#-DOOR-UNLCK GLACIER#-HW-PWR # = 2, 3, 4, 5, or removed for Glacier (Unit 1)

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Software Load 1 1.Scheduled by OCR. :25 GLACIER#-SW-LOAD Unattended Crew GLACIER#-HW-PWR FlexibleTEXT # = 2, 3, 4, 5, or removed for Glacier (Unit 1)

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 File Load 1 1.Scheduled by OCR. :15 GLACIER#-FILE-LOAD 1:00 PRO-PLMDM FILE-CMD 1:00 PRO-FILE XFR-CMD Commanding Unattended Crew GLACIER#-HW-PWR # = 2, 3, 4, 5, or removed for Glacier (Unit 1)

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Battery Swap 1 1.Scheduled by OCR. :15 GLACIER#-BATT-SWAP Crew FlexibleTEXT # = 2, 3, 4, 5, or removed for Glacier (Unit 1)

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Crew Video/Photo 1 1.Scheduled by OCR. :15 Unattended Crew GLACIER#-CRW-VIDEO/P GLACIER#-HW-PWR GLACIER#-HISD-VIDEO # = 2, 3, 4, 5, or removed for Glacier (Unit 1)

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Video/Photo 1 1.Scheduled by OCR. Unattended Crew GLACIER#-HW-PWR :15 GLACIER#-HW-VIDEO/P GLACIER#-HISD-VIDEO # = 2, 3, 4, 5, or removed for Glacier (Unit 1)

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Dragon Status Check Crew :10 GLACIER-DRGN-STAT CK (every 2 hours while powered on Dragon only if H&S cannot be provided)

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Dragon Unpack/Remove 1 Crew Additional Activities :35 GLACIER-DRGN-RMV 1.Scheduled by OCR. 1:00 GLACIER-DRGN-UPK/RMV :10 DCB-ICEBRICK-STOW 24 hrs :30 GLACIER-DRGN-UNPACK Scheduled Separately Yes No :10 DCB-ICEBRICK-STOW 24 hrs

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 1:00 GLACIER#-HW-PWR Dragon Transfer 1 1:00 4:00 GLACIER#-DNLK-CMD GLACIER#-DRGN-XFR GLACIER-DRGN-VIDEO/P :30 PRO-GLCR# DCT CR-CMD :30 PRO-GLCR# MTLOFF-CMD 1.Scheduled by OCR. UNBERTH1:00 GLACIER#-HW-INSTALL Commanding Unattended Crew Additional Activities # = 2, 3, 4, 5, or removed for Glacier (Unit 1)

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 1:00 GLACIER#-HW-PWR Dragon Swap 1 Commanding Unattended Crew 1:00 4:00 GLACIER#-DNLK-CMDGLACIER#-DRGN-SWAP GLACIER-DRGN-VIDEO/P :30 PRO-GLCR# DCT CR-CMD :30 PRO-GLCR# MTLOFF-CMD 1:00 1.Scheduled by OCR. # = 2, 3, 4, 5, or removed for Glacier (Unit 1)

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Crew Roll-up Notes EO10-PPO Revision B31/32 & Subs 12/8/11 Nominal:.58 Reserve: 0 Inc 31/32 Working PTP 10/31/11 Nominal: ER2: 3.33 ER6: 2.17 Reserve: 0 Status checks during POIC outage (2xday/2 days). Glacier SpaceX swaps and supporting activities will be addressed in a separate CR. EO10-PPO Revision C33/34 & Subs 6/28/12 Nominal: 0 Reserve: 0 Inc 33/34 Working PTP 5/11/12 Nominal: ER2: 4.5 ER6: 0 Reserve: 0 Glacier SpaceX swaps and supporting activities will be addressed in a separate CR. EO10-PPO Revision D33/34 & Subs 8/30/12--Power removed from crew activities and unattended activities adjusted as needed. Video resources modeled in separate unattendeds for P/TV activities. No change to roll-up from last revision. EO10-PPO Revision E35/36 & Subs 2/14/13 Nominal: 0 Reserve: 0 Inc 35/36 Working PTP 1/3/13 Nominal: 4.5 (ER6); 6.67 (ER2) Reserve: 0 Increased duration for 10-min activities with procedures and stowage notes to 15 minutes. Added generic activities for Dragon transfers, swap, and status checks. Specific Dragon-related activities will be submitted by OCR before each flight. EO10-PPO Revision F37/38 & Subs 6/13/13 Nominal: 0 Reserve: 0 Inc 37/38 Working PTP 4/29/13 Nominal: 4.92 (ER6); 4.25 (ER2) 0 (ER7); 3.33 (ER3) Reserve: 0 (ER6, ER2, ER7) 1.33 (ER3) Specific Dragon-related activities will be submitted by OCR before each flight. Updated video/photo activities. Added Glacier Dragon Unpack/Remove activity. PPO Change Log *Crew Roll-up is not maintained real-time.

Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Notes EO10-PPO Revision G 39/40 & Subs 12/12/13 Nominal: 0 Reserve: 0 Inc 39/40 Working PTP 10/21/13 Glacier 1: 0.17 Glacier 2: 0.17 Glacier 3: 3.67 Glacier 4: 3.67 Glacier 5: 2.33 Reserve: 0 for all Specific Dragon-related activities will be submitted by OCR before each flight. Updated DNLK-CMD scheduling to include words “as required to support payload user.” Added #5 to key for Glacier 5. Updated Dragon status check (not required if H&S can be provided). coldall coldall Revision H41/42 & Subs 9/24/14 Nominal: 0 Reserve: 0 Inc 41/42 Working PTP 9/18/14 Glacier 1: 5.50 Glacier 2: 0.17 Glacier 3: 4.75 Glacier 4: 3.67 Glacier 5: 2.25 Reserve: 0 for all Added desiccant swap prior to hardware powerup. Added battery swap. EO10-PPO Revision I41/42 & Subs 3/3/15 - -Added PPO document number. PPO Change Log *Crew Roll-up is not maintained real-time.