Proposed Storm Water Utility Fee July 2014. Proposal for future Drainage Improvement: Faith Presbyterian Church Estimated Cost: $35,000.00 *Install three.

Slides:



Advertisements
Similar presentations
Doewood Drive Gate Closure: Right-of-way Vacation & Proposed Improvements El Paso County Public Services Department Tuesday, February 14, 2012 André P.
Advertisements

PARK WEST DRAIN Park Township, Ottawa County, Michigan Project Information Meeting August 4, 2011 Ottawa County Drain Commissioner.
What is a Storm Water Utility? A storm water utility is a method of financing the administration, planning, implementation and maintenance of storm water.
Christchurch City Council footer text Flood Taskforce Flood risk in Sumner and Moncks Bay.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Capital Improvement Plan May 8 th, 2013 Presented by City Administration: Public Works Department Finance Department.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
Where does all that rain go? Stormwater Management in London.
6 th Street Water Main And Street Reconstruction 2013.
Management of Surface Water in Severe Weather Conditions from the Highway GORDON HUNT COUNTY DRAINAGE ENGINEER for OXFORDSHIRE COUNTY COUNCIL.
Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
Volusia County Public Works
Center Street & 2080 East Roadway Connection Springville City John Cazier, Derrick Turner, Justin Brewer, Taylor Nordquist.
AVONDALE ROAD ITS 2006 COUNTYWIDE GRANT. AVONDALE ROAD ITS OVERVIEW OVERVIEW Location Location Avondale Road between Novelty Hill Road and NE 132 nd St.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
PROPOSED HPD BIKE-PED MASTER PLAN HPD PRESENTATION.
Westbrook Village Verdict Storm Drainage & Waterline Improvements Contract Amendment for GMP No.1 Pulice Construction, Inc. ITEM 10C April 21, 2009.
Utility Extension Project
Sanitary Engineering Lecture 16
SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH. Seawall Construction.
By Sacha Mkheidze & Aaron Hebert
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Drainage Task Team Volusia County Public Works Judy Grim, P.E. Road and Bridge Director.
Leila Talebi (3/28/2012).  The existing land use of Cincinnati Zoo consists of various types including parking lot, open space areas, and steep wooded.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
Sewer Relief Project. Basement Flooding has been a major problem for city of Selkirk residents. High intensity summer rain storms can result in extensive.
 Prepared by  Prepared for  City of Palm Coast, Florida  January 27, 2015  Drainage Study Sections 30 & 34 for Development of City Wide Stormwater.
 FRLP Proposed Boundary Line Adjustment: Confluence Virginia What life have you if you have not life together? There is no life.
38th ½ Street Improvements (between Grayson and Airport) Group 10: Jordan Alvarez Emily Tat Charles Yamashiro.
Phase 2: 30% Design Plans September 4 th, 2012.
Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye.
City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane.
Stormwater Budget Overview Just a Reminder. Infrastructure Inventory for Stormwater Drainage System 19 Major Canal Control Structures 19 Major Canal Control.
San Diego Trolley. Current Current/future expansion Propose extension.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
ESD 112 Land Acquisition. Review of Activities to Date Identified a variety of properties Conducted Board presentations/tours Conducted “level 1” due.
Town of Oro Valley Oro Valley Stormwater Utility Commission Overview.
ITEM 9B Authorize a Commercial Developer Agreement with Keller Watermere, L.P., for South Village at Watermere, located south of West Southlake Boulevard.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
CONSTRUCTION OF SOUNDVIEW AVENUE SEWER LINING PROJECT INFORMATIONAL MEETING JULY 14, 2014; 7 PM STAMFORD GOVERNMENT CENTER 6 TH FLOOR TRAINING ROOM.
SMC South ALG Matrix Wire, Inc. Lee County April 26, 2012 DP.
Storm Water Management at MSU Ruth Kline-Robach Michigan State University Institute of Water Research Dept. of CARRS.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
City Council Storm Water Presentation March 6, 2014.
City Council March 4, Introduction The UCRA recommends the development of a storm water storage basin just to the east of FM 1223, south of Avenue.
Waterways Management Monthly Report Council Briefing December 12, 2012.
165 Partners, LLC. ALR Westgate Development-The Landings Russell County August 30, 2011 DP.
Stormwater Management
Storm Sewer Assessment for South Newport Subdivision
Welcome to the Libertyville Stormwater Master Plan Open House
Drainage Study Sections 30 & 34 for Development of City Wide Stormwater Management Master Plan Prepared for City of Palm Coast, Florida Prepared by March.
Manchester’s CSO Program: A Look Behind and a Look Ahead
Sherwood Drive Wolfville
Components of Stormwater Management Systems
Where does all that rain go?
SE 12th Street Roadway Improvements February 8, 2005.
2008 Dirty Dog Run Course St Rt 46 North Main Street
MS4 OVERVIEW 2015.
Walker Street Reconstruction Project 25% Design Public Hearing
Monterey County Project Report for Measure X Expenditures
Larimer County: engineering
Regional Stormwater 2016 Operations, Maintenance, & Projects
Presentation transcript:

Proposed Storm Water Utility Fee July 2014

Proposal for future Drainage Improvement: Faith Presbyterian Church Estimated Cost: $35, *Install three (3) catch basins & connect them to drainage swale on east side of the existing park located east of the Faith Presbyterian Church. Faith Presbyterian Church Estimated Cost: $35, *Install three (3) catch basins & connect them to drainage swale on east side of the existing park located east of the Faith Presbyterian Church. *Information has been obtained by Eckler Engineering, Inc.

Miller Road & Second Avenue N. Estimated Cost: $44, to $57, Two Options Available 1 st : Install four (4) inlets along Second Ave N interconnected to each other having an ex-filtration trench to take car of the runoff volume and water quality. (This system will not be interconnected to any other existing drainage systems in the area. ($44,000.00) 2 nd : Install three (3) inserts along Second Ave N and then connect each other via hard piping to a control structure and outfall structure located in the vicinity of the lake located NW of the area of the intersection of Miller Rd and Second Ave N. The entire runoff from the proposed area will discharge into the lake. ($57,000.00) Miller Road & Second Avenue N. Estimated Cost: $44, to $57, Two Options Available 1 st : Install four (4) inlets along Second Ave N interconnected to each other having an ex-filtration trench to take car of the runoff volume and water quality. (This system will not be interconnected to any other existing drainage systems in the area. ($44,000.00) 2 nd : Install three (3) inserts along Second Ave N and then connect each other via hard piping to a control structure and outfall structure located in the vicinity of the lake located NW of the area of the intersection of Miller Rd and Second Ave N. The entire runoff from the proposed area will discharge into the lake. ($57,000.00) Proposal for future Drainage Improvements: *Information has been obtained by Eckler Engineering, Inc.

10 th Avenue N & Davis Rd.10 th Avenue N & Davis Rd. Estimated Cost: $424, The area is located north of the intersection of LWDD Canal 11 and Davis Road, and ends at the intersection of 10 th Avenue N and Davis Road. This area presents occasional flooding issues when high precipitations a given; moreover, runoff from adjacent streets and from Davis Road flood front yards of residents that have properties along Davis Road. It is proposed that a drainage system is constructed along Davis Rd. This system would discharge runoff from the area in question to the LWDD Canal 11. The system needs to be designed having drainage inlets, intersecting manholes, hard piping, a control structure, and an outfall. 10 th Avenue N & Davis Rd.10 th Avenue N & Davis Rd. Estimated Cost: $424, The area is located north of the intersection of LWDD Canal 11 and Davis Road, and ends at the intersection of 10 th Avenue N and Davis Road. This area presents occasional flooding issues when high precipitations a given; moreover, runoff from adjacent streets and from Davis Road flood front yards of residents that have properties along Davis Road. It is proposed that a drainage system is constructed along Davis Rd. This system would discharge runoff from the area in question to the LWDD Canal 11. The system needs to be designed having drainage inlets, intersecting manholes, hard piping, a control structure, and an outfall. Proposal for future Drainage Improvements: *Information has been obtained by Eckler Engineering, Inc.

S. Military Trail, Canal 9 Road, Kirk Road and Park Lane Estimated Cost: $200, This area contains different drainage features such as storm drainage collection systems, lakes, swales, and outfalls. The streets being considered under this annual drainage maintenance program are: Canal Road 9, Vicliff Road, Dale Road, Linda Lane, Park Lane, Hillary Circle, Rachael Way, and Donald Road. The streets considered outside of this annual drainage maintenance program are: Kirk Road and S. Military Trail. S. Military Trail, Canal 9 Road, Kirk Road and Park Lane Estimated Cost: $200, This area contains different drainage features such as storm drainage collection systems, lakes, swales, and outfalls. The streets being considered under this annual drainage maintenance program are: Canal Road 9, Vicliff Road, Dale Road, Linda Lane, Park Lane, Hillary Circle, Rachael Way, and Donald Road. The streets considered outside of this annual drainage maintenance program are: Kirk Road and S. Military Trail. Proposal for future Drainage Improvements: *Information has been obtained by Eckler Engineering, Inc.

Estimated Expenses Equipment and Cost for Maintenance *This price was based on a recent purchase order issued to vendor, Shenandoah Construction. Cost was for storm drains along Gulfstream Rd & San Fernando Dr. to be grouted.

Barbados Drive

Canal Rd & Davis Rd.

Davis Rd. & 2 nd Ave N.

Fern St. & Greene Ave.

Kirk Rd. & Park Ln.

Miller Rd.

Recently upgraded storm drains on Davis Rd.

Storm Water Utility Fees Village of Palm Springs Proposed Storm Water Utility Fee Based on Units Served Inside Village Water Units: 9,377 Village of Palm Springs Proposed Storm Water Utility Fee Based on Units Served Inside Village Water Units: 9,377