MELBOURNE HILL ROAD CATCHMENT DRAINAGE IMPROVEMENTS Reference Panel Meeting, 6 February 2014.

Slides:



Advertisements
Similar presentations
Resource Team/TEER Meeting October 19, CBRT Meeting October 19, 2006 Agenda 10:00 AM 10:05 AM 10:30 AM 11:30 AM Noon Introductions and Housekeeping.
Advertisements

SUDS Retrofits in Scotland
Port NE Group Portarlington NE Group Road Sealing.
What is a Storm Water Utility? A storm water utility is a method of financing the administration, planning, implementation and maintenance of storm water.
Essex County Transportation Services Department Essex County Highways 2013 Construction Program Peter Bziuk P. Eng. Manager Construction Services.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Public Hearing FY 2011 Budget 1. City Council Goals FY 2011 Flood Recovery and Protection –Identify Funding and Sources for Flood –Restore Affordable.
STUDY OF THE STORM DRAIN SEWER OF THE URBAN CATCHMENT OF LA RIERETA, SAN BOI DE LLOBREGAT, SPAIN TEAM 3: 1. Aline Veról 2. José Rivero 3. Pedro Ramos 4.
Management of Surface Water in Severe Weather Conditions from the Highway GORDON HUNT COUNTY DRAINAGE ENGINEER for OXFORDSHIRE COUNTY COUNCIL.
Optimum Design in Rural Roads Introduction. Optimum Design in Rural Roads ….1 Introduction to topic: What is intended to be discussed? Optimum and/or.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
Westbrook Village Verdict Storm Drainage & Waterline Improvements Contract Amendment for GMP No.1 Pulice Construction, Inc. ITEM 10C April 21, 2009.
Drainage Services Department Drainage Project Division Contract No. DC/2007/01 Contract Title: Drainage Improvement Works in Ki Lun Tsuen, Kwu Tung, Ma.
Drainage Channel Restoration Construction Project Wood Co. Engineer’s Office Great Lakes Protection Fund A.D. Ward, D. Mecklenburg, R. McCall, D.J. Mears.
The Objectives of storm water drainage To prevent erosion in hillside areas (paved roads and terracing are needed) To prevent land-slides To improve the.
E4014 Construction Surveying Route Location Surveys Reconnaissance Survey Investigation Survey Working Survey Construction Survey.
Ross Valley Flood Protection and Watershed Program Flood Zone 9 Advisory Board April 16, 2015 Flow Reduction Study Preliminary Results 1.
Morphum Environmental Ltd Environmental Engineers and Consultants
The Caw Burn SUDS: performance of a settlement pond/wetland SUDS retrofit Kate Heal & Miklas Scholz University of Edinburgh Nigel Willby, University of.
Sewer Relief Project. Basement Flooding has been a major problem for city of Selkirk residents. High intensity summer rain storms can result in extensive.
Public Consultation A RE YENG REVIEW LINE 2B 13 August 2015.
Area of Inundation Industrial Drive Area of Flooding =
BROKENHEAD OJIBWAY NATION COMMUNITY MEETING June 23, :00 PM – 7:00 PM Information on the PTH 59N and PTH 101 Interchange.
1 Waipaoa River Flood Control Scheme Review. 2 Review Technical Review Sept 2009 Steering Committee Oct 2009 Operations Committee Oct Council February.
E4014 Construction Surveying Road Construction Plans.
Essex County Transportation Services Department Essex County Highways 2012 Construction Program Peter Bziuk P. Eng. Manager Construction Services.
ELCITA Update 25 th August Update – Estate Management E – Toilets 8 e-toilets operational and work order placed for 4 more e-toilets Under Ground.
City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane.
Flood Prevention Measures The first six months of 2013 have seen a significant increase in flooding of both tertiary and machine installation. The following.
Creek Upgrade Option Meeting with directly affected property owners - Area 3.
PA-1 Surface Water Control Structure Replacement Final Payment.
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
Water Street Hydrologic and Hydraulic (H&H) Analysis (Drainage Study) Water Street Hydrologic and Hydraulic (H&H) Analysis (Drainage Study) City of Platteville.
FLOOD CONTROL. AMAFCA The Albuquerque Metropolitan Arroyo Flood Control Authority (AMAFCA) was created in 1963 by the New Mexico Legislature with specific.
EMERGENCY MANAGEMENT WARRANDYTE COMMUNITY FORUM, 12 NOV 2015 TRAFFIC MODELLING.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Town of Oro Valley Oro Valley Stormwater Utility Commission Overview.
SURF BEACH CATCHMENT, KIAMA Floodplain Risk Management Study & Draft Plan Community Information Newsletter March 2016 The study area investigated in the.
Essex County Transportation Services Department Essex County Highways 2016 Construction Program Peter Bziuk P. Eng. Manager Design and Construction Services.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
Proposed Storm Water Utility Fee July Proposal for future Drainage Improvement: Faith Presbyterian Church Estimated Cost: $35, *Install three.
AHWATUKEE-FOOTHILLS ADMS MANDAN STREET DESIGN CHARRETTE Valerie Swick, Project Manager Flood Control District of Maricopa County.
LONDON SUSTAINABLE DRAINAGE ACTION PLAN Kevin Reid Principal Programme Manager Greater London Authority 11 May 2015.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
Stormwater Management
Sandra Blick / Meeta Trivedi Hydrology & Hydraulic Unit – NJDOT BLAES
Agenda Updates to Driveway and Sidewalk specifications and permits
Town Road Improvement Project Communication Plan
City of Whitehorse 2017 Capital Projects & Service Requirements Peter O’Blenes, P. Eng February 21,2017.
Town of Brighton, Department of Public Works
Transportation Services Department
Dartmouth Road Public Realm Enhancements – Preliminary Design
Town of Melbourne Beach
This photo was taken in August What has changed since then?
Issaquah-Fall City Road
Indicative Council Cost Balance of Project Costs (5 Year ARI Assets)
Melbourne Hill Road Drainage Scheme
Melbourne Hill Road Drainage Scheme
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
NEIGHBOURHOOD TRAFFIC SCHEMES PRIORITIZATION METHOD
Love Field Modernization Program
Town of Atherton Storm Drainage Study Updates 1st Public Meeting February 6, 2014 Storm Drainage Study Updates and Related Services.
Hamilton Township, Mercer County, NJ Hydrologic Evaluation and Water Resources Recommendations For Planning and Implementation Rutgers Cooperative Extension.
Manilla Low Level Crossing Project
Monterey County Project Report for Measure X Expenditures
City of Austin Watershed Protection Department CIP Project design/implementation Thank you for the opportunity to show the committee what the Watershed.
Presentation transcript:

MELBOURNE HILL ROAD CATCHMENT DRAINAGE IMPROVEMENTS Reference Panel Meeting, 6 February 2014

Agenda 2 1.Welcome/IntroductionsChair 2.ApologiesChair 3. Reference Panel Feedback  Comments on current Council Proposal  Confirmation of Reference Panel Concept All 4. Update Outstanding Issues  Valley Drain  Vehicle Crossing Culverts Roger Woodlock 5. Project Estimate and Apportionment Basis Roger Woodlock 6.Project Program / Next StepsRoger Woodlock 7.Discussion / QuestionsRoger Woodlock 8.CloseRoger Woodlock

Officer Investigations - diversions 3

Reference Panel Concept 4

5 Upgrade and asphalt line open drains Vehicle crossing and road crossing culvert upgrades Address recurring blockage of underground drain Melbourne Hill Road Improve drainage system downstream of MHR and H-W Rd intersection (outlet)

Reference Panel Concept 6 Upgrade underground drain in valley Improve and asphalt surface existing mounds and extend as required Improve Council maintenance intervention Divert flows from Wildflower Reserve to Heidelberg Warrandyte Road, or Construct retention basin at Houghton Rd / Melbourne Hill Rd intersection.

Outstanding Issues 7 Valley Drain Vehicle Crossing Culverts

Revised Total Project Estimate 8 Original Total Project Cost (Nov 2012)$1,940,000 Revised Total Project Cost$2,104,000 Cost Increase$164,000 Percentage Increase8.45% Note: Excludes boring and vegetation works

Breakdown Of Cost Increase 9 Wildflower Drain Extension $64,0003.3% Changes in Pipe Sizes / Extents / Pavement Works at Melbourne Hill Road $40,0002.1% Replace Kerb and Channel - Mounds- $37, % Construction Industry Cost Increases Nov 2012 – Feb 2014 $97, % Sub Total$164, %

Cost Breakdown Stage 1 10 Total Project $2,104,000 Council Cost (as per Council Policy) Upgrade existing Council drains Upgrade to flood capacity Wildflower extension Outlet works $455,000 Apportioned Cost $1,649,000

Cost Breakdown Part 2 11 Apportioned Cost $1,649,000 Council Area (38.6% h) Road reserves Leber Street $636,000 Resident Area (61.4% h) $1,013,000 Total Council = $1,091,000

Cost Apportionment 12 Resident Area (61.4% h) $1,013,000 Benefit B Individual Property Area A A × B = Individual Property Cost

13 METHOD OF APPORTIONMENT Natural Runoff House Runoff Protected = 1 BU Use = 1 BU

Project Program 14 Council Report - ConceptMarch 2014 Detailed DesignApril – August 2014 SR + C Scheme ProcessSeptember 2014 – February 2015 VCAT HearingUp to 12 Months Call Tenders Construction

15 Discussion/ Questions