LCLS-II will use sectors 11-20 (2 nd kilometer of SLAC linac) + a bypass line FACET has already removed all RF from sector 20 LCLS-II will re-install RF.

Slides:



Advertisements
Similar presentations
Nominal and no CSR (R 56-1 = 55 mm, R 56-2 = 59 mm, R 56-3 = 0) L1 phase = 21 deg, V 3.9 = 55 MV CSR OFF BC3 OFF Elegant Tracking  z1 = mm (post.
Advertisements

1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
1 Enhancements to the Linac Coherent Light Source.
Does the short pulse mode need energy recovery? Rep. rateBeam 5GeV 100MHz 500MWAbsolutely 10MHz 50MW Maybe 1MHz 5MW 100kHz.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.
New 135-MeV injector energy requires minor changes to linac operating point…
Linear Collider Machine Protection Issues M. Palmer Injection System Injector Damping Rings Bunch Compressor and Transfer Sections Main LINAC Beam Delivery.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
LCLS-II Transverse Tolerances Tor Raubenheimer May 29, 2013.
M. Venturini, Sept. 26, 2013, SLAC 1 ─ M. Venturini, Sept. 26, 2013, SLAC Marco Venturini LBNL Sept. 26, 2013 THE LATE NGLS: OVERVIEW OF LINAC DESIGN,
Low Emittance RF Gun Developments for PAL-XFEL
TTF2 Start-to-End Simulations Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Zeuthen, 22 Jan 2004.
LCLS-II Magnet Error Sensitivities. Sensitivities of dipole magnets, from injector output (95 MeV) to SXR undulator input (4 GeV), where each plotted.
Collective Effects in the Driver of the Wisconsin Free-Electron Laser (WiFEL) Robert Bosch, Kevin Kleman and the WiFEL team Synchrotron Radiation Center.
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
ARD All-Hands Tor Raubenheimer November 22 nd, 2010.
Electron Model for a 3-10 GeV, NFFAG Proton Driver G H Rees, RAL.
A bunch compressor design and several X-band FELs Yipeng Sun, ARD/SLAC , LCLS-II meeting.
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
External Seeding Approaches: S2E studies for LCLS-II Gregg Penn, LBNL CBP Erik Hemsing, SLAC August 7, 2014.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
T. Limberg Position of the 3rd Harmonic System. Injector (with first Bunch Compression Stage) 2 European XFEL MAC May 2010 T. Limberg.
J. Wu J. Wu working with T.O. Raubenheimer, J. Qiang (LBL), LCLS-II Accelerator Physics meeting April 11, 2012 Study on the BC1 Energy Set Point LCLS-II.
Beam Stay-Clear (BSC) Apertures in LCLS-II June 24, 2015 P. Emma Take up work Jim Welch started (LCLSII-TN-14-15, Jan. 23, 2015) Goal is to define stay-clear.
‘S2E’ Study of Linac for TESLA XFEL P. Emma SLAC  Tracking  Comparison to LCLS  Re-optimization  Tolerances  Jitter  CSR Effects.
Post-LH Diagnostic Line for LCLS-II P. Emma, M. Woodley, Y. Nosochkov, Feb. 26, 2014 Steal beam at Hz with y -kicker after LH (  y = 15 mm) Bend.
LCLS-II Design and FEL R&D
LCLS-II Particle Tracking: Gun to Undulator P. Emma Jan. 12, 2011.
J. Wu J. Wu working with T.O. Raubenheimer LCLS-II Accelerator Physics meeting May 09, 2012 Study on the BC1 Energy Set Point LCLS-II Accel. Phys., J.
LCLS-II: Accelerator Systems LCLS SAC Meeting P. Emma et al. April 23, 2010.
Twin bunches at FACET-II Zhen Zhang, Zhirong Huang, Ago Marinelli … FACET-II accelerator physics workshop Oct. 12, 2015.
Lessons Learned From the First Operation of the LCLS for Users Presented by Josef Frisch For the LCLS March 14, 2010.
Preliminary Tracking Results through LCLS-II P. Emma et al., Oct. 23, 2013 Thanks to Mark Woodley and Yuri Nosochkov for MAD design work Use Christos Papadopoulos.
LCLS-II Injector layout design and study Feng Zhou 8/19/2015.
G. Penn SLAC 25 September 2013 Comments on LCLS-IISC Design.
X-band Based FEL proposal
MAX IV linac overview and scope of automation Sara Thorin.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
A single-shot method for measuring fs bunches in linac-based FELs Z. Huang, K. Bane, Y. Ding, P. Emma.
SABER Longitudinal Tracking Studies P. Emma, K. Bane Mar. 1, 2006
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Beam dynamics for an X-band LINAC driving a 1 keV FEL
Robert Bosch, Kevin Kleman and the WiFEL team
LCLS2sc MAD files: Injector to Bypass Line
Cutting Beam Horns in BC1
Short pulse, low charge LCLS operation
Beam-Based Feedback in LCLS-II
XFEL Beam Physics 10/30/2015 Tor Raubenheimer.
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
CEPC Injector positron source
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
Linac/BC1 Commissioning P
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
Linac (WBS 1.2.2) Vinod Bharadwaj April 23, 2002
CEPC Injector positron source
LCLS Commissioning P. Emma, et al
LCLS Tracking Studies CSR micro-bunching in compressors
Linac LLP Outline LINAC Long Lead Procurements
Linac Physics, Diagnostics, and Commissioning Strategy P
Maximum Credible Beam Event Paul Emma et al
J. Seeman Perugia Super-B Meeting June 2009
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Injector/Linac Design Status C. E
Injector/Linac RF Status
SuperKEKB required (e+ / e-)
Presentation transcript:

LCLS-II will use sectors (2 nd kilometer of SLAC linac) + a bypass line FACET has already removed all RF from sector 20 LCLS-II will re-install RF in the first half of 20 (20-1, 2, 3, 4) Bypass line will start at 20-5 and needs to level out before the FACET wall This is 4 RF stations fewer than LCLS-I so we need to be efficient: 1.Assume 225 MeV per RF station (18.5 MV/m over a 12-m section) 2.Place the new BC1 at 250 MeV in 11-2, as in LCLS-I (21-2) 3.Keep BC2 at similar energy (~4 GeV) so new CSR issues, but move as needed 4.Assume L2 is at a worst case RF phase of  2   40° (user chirp option) 5.Always provide  3 spare tubes in L2, plus 2 BC2-energy-feedback stations 6.Typically provide  3 spare tubes in L3, plus 8 final energy-feedback stations 7.Set L3 on crest and find acomfortable top-end energy for LCLS-II… 20-1, 2, 3, 4 FACETFACET ~50 m ? bypass line LCLS-II Linac Layout Issues

11 BC2BC  2   40°   =    = 250 MeV   = 4.0 GeV   = 13.6 GeV TCAV3? (klys. 14-5) 11 n n n n Standard station (klys & ~12 m RF) Feedback station (klys & ~12 m RF) Spare Feedback station (ditto) Spare RF station (ditto) Proposed Layout of LCLS-II High Power RF Stations BC2 will displace the 14-4 & 14-5 stations (14-4 is gone) 14-5 station will power a new TCAV3 at 14-7 Presently there is no RF in 11-3 (very old e + system – re-install b,c,d) Should we locate BC1 at 11-3 (~450 MeV) to save money? Presently there is no RF in 19-7 (SLC e + system – re-install? – no e + ?) Presently there is no RF in 20-1 (historical? – re-install) Presently there is one missing section at 19-8d (re-install)

11 BC2BC  2   40°   =    = 450 MeV   = 4.0 GeV   = 13.2 GeV TCAV3? (klys. 14-5) 11 n n n n Standard station (klys & ~12 m RF) Feedback station (klys & ~12 m RF) Spare Feedback station (ditto) Spare RF station (ditto) Leave 11-2 unchanged (12 m) and locate BC1 at 11-3, 450 MeV (save money) Then how to power L1X? Provide only two L2 spares at  2 =  40° (i.e., 4 spares at  2 =  32° nom.) Leave no RF in 19-7 (e + system remains) Leave no RF in 20-1 (save money) Final maximum comfortable energy is 13.2 GeV (|  3f | = 30° ) Alternate (cheaper) Layout of LCLS-II High Power RF Stations

LiTrack Study in LCLS-II (Heater at 16 keV rms) 13.6 GeV at undulator 135 MeV after injector 250 MeV after BC1 4.0 GeV after BC mm 0.13 mm 7.1  m 1.1% 0.07% 0.41% 0.01%

LCLS-II Accelerator for 14 GeV, 120 Hz, 250 pC

LCLS-I Injector Layout LCLS-II Phase-I Injector Layout LCLS-II Phase-II Injector Layout Use BXS magnet and short spectrometer beamline in these temporary positions