H.-G. Moser Max-Planck-Institut für Physik PXD EVO 21/10/2009 1 Barcelona Summary Thanks to our hosts for UB for a great meeting!

Slides:



Advertisements
Similar presentations
2nd Open Meeting of the SuperKEKB Collaboration, KEK, March 2009 Ladislav Andricek, MPI fuer Physik, HLL 1 DEPFET Sensor R&D and Prototyping - Status -
Advertisements

Simulation Studies of a (DEPFET) Vertex Detector for SuperBelle Ariane Frey, Max-Planck-Institut für Physik München Contents: Software framework Simulation.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
2. Super KEKB Meeting, DEPFET Electronics DEPFET Readout and Control Electronics Ivan Peric, Peter Fischer, Christian Kreidl Heidelberg University.
ECFA ILC Workshop, November 2005, ViennaLadislav Andricek, MPI für Physik, HLL DEPFET Project Status - in Summary Technology development thinning technology.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
SuperKEKB 3nd open meeting, July Hans-Günther Moser MPI für Physik PXD Summary Other talks in software, SVD and DAQ sessions.
SuperKEKB 2nd open meeting March 17-19, 2009 Hans-Günther Moser MPI für Physik PXD Session SOI: more information: see TIPP09 -> submission in February,
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
LCWS08, Chicago, November 2008 Ladislav Andricek, MPI fuer Physik, HLL 1 DEPFET Active Pixel Sensors - Status and Plans - Ladislav Andricek for the DEPFET.
H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Summary of PXD Session 1 Status of CAPSH. Hoedlmoser (Video)
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Sensor and ASIC R&D Sensor Prototype Production: running, ASICs: Switcher,
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Thinning and Interconnection DEPFET Meeting, Valencia, Sept Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples for thermal mock-ups.
C. Kiesling, PXD-EVO-Meeting, Oct 13, Summary of the Valencia Meeting and Some Recent News Valencia meeting and thereafter New Date for SuperKEKB.
1 Tests of EMCM Felix Müller on behalf of the MPP / HLL TestCrew (H.-G. Moser, C. Koffmane, M. Valentan) Belle II PXD – ASIC Review October , 2014.
1 Updates of EMCM Testing J. Haidl, C. Koffmane, F. Müller, M. Valentan 8th Belle II VXD Workshop September University of Trieste.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
1 Test Beam with Hybrid 6 Florian Lütticke for the Testbeam Crew Bonn University 7th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors.
PXD EVO Hans-Günther Moser MPI für Physik Meeting on Services and Power Supplies Aim: define the services chain form module to external racks.
Hybrid Boards for PXD6 5th International Workshop on DEPFET Detectors and Applications Sept Oct Christian Koffmane 1,2 1 Max-Planck-Institut.
PXD ASIC review, October 2014 ASIC Review 1 H-.G. Moser, 18 th B2GM, June 2014 Date and Location MPP, October 27, 10:00 – October 28, 16:00, Room 313 Reviewers:
H.-G. Moser Max-Planck-Institut für Physik 2nd DEPFET workshop 3-6 May 2009 Open Issues Readout cycle: 10 µs or 20 µs ? Advantages of 20 µs: - smaller.
Simulation of a DEPFET Pixel Detector IMPRS Young Scientist Workshop July, 26 – 30, 2010 Christian Koffmane 1,2 1 Max-Planck-Institut für Physik, München.
PXD EVO November 18, 2014 ASIC Review 1 H-.G. Moser, 18 th B2GM, June 2014 Date and Location MPP, October 27, 10:00 – October 28, 16:00, Room 313 Reviewers:
H. Krüger, , DEPFET Workshop, Heidelberg1 System and DHP Development Module overview Data rates DHP function blocks Module layout Ideas & open questions.
Test beam preparations Florian Lütticke, Mikhail Lemarenko, Carlos Marinas University of Bonn (Prof. Norbert Wermes) DEPFET workshop Ringberg (June 12-15,
6 th Belle PAC, KEK, February 26 and PXD - EVO, 5/March/2012 Ladislav Andricek, MPI für Physik, HLL 1
Hans-Günther Moser, PXD PXD Summary 1 PXD Sessions: Highlights 1)Sensor production 2) EMCM (& bump bonding) 3)System Simulations 4)Power Supplies and Services.
Power Supply for DEPFET in SuperBelle Pablo Vazquez IGFAE-USC Henryk Palka INP-KRA.
H.J.Simonis, IEKP Uni-Karlsruhe, SuperKEKB meeting, KEK 18.mar 2009 Thermal studies for the DEPFET Pixel Detector IFIC – University of Valencia (Spain)
Jelena Ninković Testing PXD6 - summary and plans Jelena Ninkovic for the HLL team.
H.-G. Moser, 6 th PXD/SVD workshop, Pisa, Oct PXD Summary 1 DEPFET Sensors production yield inter-metal insulation EMCM electronic tests ASICs Schedule.
Data Handling Processor v0.1 Preliminary Test Results - August 2010 Tomasz Hemperek.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
TILC08, Sendai, March DEPFET Active Pixel Sensors for the ILC Marcel Vos for the DEPFET Collaboration (
Preparations on DEPFET gate-mode Operation with Hybrid 4.1.x 17. April Christian Koffmane 1,2 for HLL team 1 Max-Planck-Institut für Physik, München.
DHH progress report Igor Konorov TUM, Physics Department, E18 DEPFET workshop, Bonn February 7-9, 2011 Outline:  Implementation synchronous clock distribution.
H.-G. Moser Max-Planck-Institut fuer Physik DEPFET Meeting Heidelberg Sept DEPFET Geometry for SuperBelle Sensor Geometry Pixel Pitch Constant/variable.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institut für Experimentelle Kernphysik
1 Test of Electrical Multi-Chip Module for Belle II Pixel Detector DPG-Frühjahrstagung der Teilchenphysik, Wuppertal 2015, T43.1 Belle II Experiment DEPFET.
DEPFET workshop, Kloster Seeon, May 2014 Summary 1 Highlights Technical Coordination TB report schedule remarks.
1 First large DEPFET pixel modules for the Belle II Pixel Detector Felix Müller Max-Planck-Institut für Physik DPG-Frühjahrstagung der Teilchenphysik,
Status of DHP prototypes
Testsystems PXD6 - testing plans overview - by Jelena NINKOVIC Hybrid Boards for PXD6 - by Christian KOFFMANE Source measurements on DEPFET matrices using.
Latest results of EMCM tests / measurements
 Silicon Vertex Detector Upgrade for the Belle II Experiment
Thinning and Plans for SuperBelle
21st International Workshop on DEPFET Detectors and Applications
B2GM Sessions PXD I: Wednesday, June 6, 16:50-20:20
KEK news ( ) S.Tanaka.
Data Handling Processor v0.1 First Test Results
DCD – Measurements and Plans
The CSOI approach for integrated micro channels
Analog Readout Chips – the Status
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Hans Krüger, University of Bonn
Contact Persons Yutaka Ushiroda proposed to set up a matrix of responsible persons (contacts) for the various subdetector tasks. He plans to have meetings.
Planning for the TDR KEK schedule: Technical Design Report (TDR)
The Belle II Vertex Pixel Detector (PXD)
Development of the Data Handling Processor DHP
Presentation transcript:

H.-G. Moser Max-Planck-Institut für Physik PXD EVO 21/10/ Barcelona Summary Thanks to our hosts for UB for a great meeting!

H.-G. Moser Max-Planck-Institut für Physik PXD EVO 21/10/ Software/Simulation Conclusions  Optimization using tracks intimately connected to tracking Tracking Task Force initiated to develop new C++ code (pattern recognition and track fitting). But: code will come too late for the optimization studies  Initial studies use single tracks, chain within ILC frame working Pattern recognition being studied to minimize tracking bias  Preparation of optimization for physics: „real“ test with vertices  Alignment software (Millipede) successfully tested with Belle MC  PXD Data Reduction using SVD (rz projection) promising New initiative: Tracking Task Force Single Track Optimization Preparation of Optimization for Physics Alignment Data Reduction Christian Kiesling

H.-G. Moser Max-Planck-Institut für Physik PXD EVO 21/10/ DEPFET

H.-G. Moser Max-Planck-Institut für Physik PXD EVO 21/10/ Electronics and System DCD various improvements (single sampling, transimpedance) Switcher 4: use HV-CMOS (0.35 µm): up to 50V DHP: ¼ test chip designed (Bonn) Slow control part: Barcelona Submission: Feb 2010 Online clustering: Some date reduction Really needed? DHH: first ideas -> find space Record 4x1024 rows of raw data(4 frames). plus 1x pedestal? Trigger ID –8bit(may be obsolete), Frame ID -8bit Latency for upto 1024 rows before trigger Configuration through JTAG protocol standard(IEEE) Boundary scan test included through JTAG Temperature measurement Single bit error protected memories + triple redundant registers High speed CML output using Aurora protocol 5 operating modes – DO NOTHING/TEST/STORE DATA TO MEM/NORMAL AQUISITION / SEND MEM Peter Fischer

H.-G. Moser Max-Planck-Institut für Physik PXD EVO 21/10/ Test beam Marcel Vos

H.-G. Moser Max-Planck-Institut für Physik PXD EVO 21/10/ Interface to Belle II IR status (Masako Iwasaki) -nano beam -1cm beam pipe -Rotation angle ? -Beam gas background (100x)? -Toucheck -Schedule: early installation? -Grounding: work started -Service routing: collect information and request space at KEK

H.-G. Moser Max-Planck-Institut für Physik PXD EVO 21/10/ Thermal and mechanical design Deformation monitor (Ivan Vila) Mechanics (Frank Simon) Study of water cooling as alternative Cooling studies in Barcelona, Karlsruhe and MPI Check if results are consistent Diamond up or down? Use of TPG disfavoured Thermal Mock-ups needed! H.-J. Simons

H.-G. Moser Max-Planck-Institut für Physik PXD EVO 21/10/ Interconnection/Module L. Andricek

H.-G. Moser Max-Planck-Institut für Physik PXD EVO 21/10/ Interconnection/Module

H.-G. Moser Max-Planck-Institut für Physik PXD EVO 21/10/ Test systems/Testing of PXD6 Good preparation essential How long can we keep ‘test beam mode’? Mini Matrix setup (P. Kodys, Prague) Characterisation system (M. Koch, Bonn) PXD6 test preparation (J. Nonkovich, MPP) 1.Setups have to be ready on time! 2.Many things have to happened in parallel ! 3.High level of synchronization is necessary to achieve results in the required time ! 4.We have to work in the Test beam mode for 6-7 months!!! Wafers finished Jun 2010  Next production (FINAL!) starts Jan 2011 We have only 4-5 months for the testing !!! J. Ninkovic

H.-G. Moser Max-Planck-Institut für Physik PXD EVO 21/10/ Jelena Ninkovic, MPI für Physik, HLL 11 Hardware we need till March Wafer level testing – Munich task – J. Ninkovic - Automatic Z contact adjustment ? 2.Dynamical measurements »128 channel : oHybrid : 1DCD and 1 Switcher (2 channels) – Munich task C. Koffmane oPitch adapter Bump-bonding ↔wire bonding for DCD and Switchers – Heidelberg task C. Kreidl oNew adapter chip for the existing FPGA? - Heidelberg task C. Kreidl oNew power supply (upgrade) - Bonn task J. Schneider oDAQ software – Bonn task - S.&J. Furletov(a) oFPGA board – Bonn task – M. Koch »Start testing the new read out using PXD5 chips and have S3B system as backup for PXD6 testing

H.-G. Moser Max-Planck-Institut für Physik PXD EVO 21/10/ Jelena Ninkovic, MPI für Physik, HLL 12 Bonded structures : Dynamic measurements »All Si Module: oDHP or some alternative for testing of the modules »Mini matrices: o4 structures on 5x5 mm 2 chip different channel length same other geometry onew hybrid with LCC carrier with window and socket with possibility to change any of the 4 – Munich task C. Koffmane osystem almost ready »Single pixel setup o exists fully – requires transfer of knowledge only

H.-G. Moser Max-Planck-Institut für Physik PXD EVO 21/10/ Action List September 8 Proposed Actions  Determine length of the straight section of the beam pipe: Masako-san  Follow up on beam gas background (x100 is far too much):Masako-san  Outer Radius of the beam pipe: Masako-san (done 1cm)  Need data on non-ionising radiation background to estimate SEU tolerance needed. Check available data from SVD2 (but they may not be relevant for us) -> not seen at Belle Contact Tsuboyma-san (Hans-Günther)  Reliability of gold-solder bumps: Christian Kreidl to contact PACTEC -> see Barcelona  DCD size and footprint, consequences for DHP: -> done  EOS Geometry: Forward information to mechanics and IR groups (Hans Krüger, Frank Simon, Hans-Günther Moser). Done, feedback from IP design needed.  Current ratings in Hans-Krüger’s list: check and update (Hans Krüger, Ivan Peric, Rainer Richter). DHP data will be added soon. Make sure that Ivan’s update is in the list (on Wiki) ?  Parameter List for cooling studies: Carlos Marinas. - done  Organize parameter documents on Wiki. Are they consistent? How to organize updates? ->done  Organize an EVO meeting of the cooling WG to discuss cooling option, and organize the work (Christian Kiesling) -> done (needs regular follow up meetings?)  Task list for (physics) simulations (different geometries). From mechanics/cooling WG In work?  Contact Inna Grigorieva because of TPG: Hans-Jürgen Simonis, Stefan Heindl, Hans-Günther Moser. -> done  Single sampling option: implementation in DHP  Improve simulation of digitizer (tune to test beam data  Design and produce metal dummies for PXD6 and final module (interconnection tests)  Alternative to Hirose connector/design kapton flex  Low mass jount for 2nd layer  Service routing: requirements (x-sction, length, location)  Preparations for PXD6 testing (Jelena‘s list)