Accelerator Project organization

Slides:



Advertisements
Similar presentations
ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
Advertisements

CW neutron source Benjamin Cheymol, Angel Jesus Romero Serrano, Jesus Alonso, Lali Tchelidze 6/30/11 Benjamin Cheymol, Angel Jesus Romero Serrano, Jesus.
Requirements Structure and Status for NCFE
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS TAC Lund, 8 July 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team.
H. Danared | Sw/Fr Coordination Committee | Page 1 Swedish/French Coordination Committee Håkan Danared Saclay, 13 January 2015.
Accelerator/Organisation
The ESS ADU project Mats Lindroos Head of the ESS Accelerator Division Lund,
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
Response to ESS Accelerator Technical Advisory Committee April 2014 Recommendations 5 November 2014 Dave McGinnis.
Managing Parameters Karin Rathsman Parameter Management Enforce groups as well as individuals to work towards the same solution Provide tools.
1 1. Some recent views ( ) 2 Linac tunnel
Recent progress of ESS Spoke and Elliptical cryomodules
Accelerator Project Mats Lindroos Head of Accelerator May 19, 2015.
Future challenges for minimum diagnostics requirements for beam commissioning and characterisation: The ESS as an example Marc Munoz, Beam Dynamics meets.
Accelerator Project TB Meeting September 2015 Mats Lindroos Head of Accelerator September 23, 2015.
Accelerator/program Mats Lindroos Head of accelerator April 21, 2015.
The ESS Cryogenics System J. G. Weisend II, P. Arnold, J Fydrych, W. Hees, J. Jurns, A. Lundmark, X. T. Su, X.L. Wang February 2016.
Project Planning Update 13th Technical Board Meeting Luisella Lari Head planner for Accelerator & Senior Scientist May.
ESS – Enabling discovery Mats Lindroos Head of Accelerator Lund October 2014.
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS.
H. Danared | Cryomodule Workshop | Page 1 The In-Kind Process at ESS Håkan Danared Lund, 15 October 2014.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
H. Danared | TB12, 5 Mar 2015 | Page 1 Håkan Danared Mats Lindroos Lund, 5 March 2015 Status of In-Kind Contributions to Accelerator.
ESS The INFN in-kind contribution to the accelerator of the European Spallation Source.
Welcome Mats Lindroos Head of the ESS Accelerator Division EPG 5/12/2011.
Annual Review replies Accelerator Accelerator Management team April2016.
PBI task force intermediate report Stephen Molloy.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
H. Danared | Collaboration Board | Page 1 Status of In-Kind Contributions Håkan Danared Legnaro, 1 December 2014.
Accelerator Systems Integration Stephen Molloy Section Leader for Accelerator Integration April, 2016.
ESS Accelerator| Construction Phase| | MC | 1 ESS Accelerator management & governance for Product Integration - Construction phase 25 January 2013.
H. Danared | Collaboration Board, March 2014 | Page 1 Status of In-Kind Contributions to Accelerator Håkan Danared Kastrup, 14 April 2014.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
Introduction to the Accelerator layout February 2016 Nick Gazis Mechanical Integration Lead Engineer.
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
Integrated Control Systems Status and Plans Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
Status of Primavera (P6) Accelerator Plan & an Introduction to the Accelerator Installation Plan Luisella Lari Head planner for Accelerator & Senior Scientist.
Slides for TAC meeting Oct/2015 Marcelo juni Ferreira Vacuum section leader October,
AD retreat Accelerator 2012 December Mats Lindroos, David McGinnis, Suzanne Gysin, Jörgen Andersson and Steve Peggs.
Accelerator Division Site Installation
RF cell Anders Sunesson RF group leader
Cryomodule test stand at ESS site
ESS cavity procurement via in-kind contributions
Overview and System Design for ESS LLRF Systems
ESS RF Development at Uppsala University
Tom Shea Front End Meeting Catania
Managing Parameters Karin Rathsman
Accsys Collaboration Board February 2017
Peo Gustavsson/Mats Lindroos IK Manger/Acc proj manger
Roles and responsibilities for Testing and Commissioning at AD
RF systems introduction
THE STATE OF BEAM DIAGNOSTICS
Licensing requirements for Cryomodules
Introduction CDR Normal Conducting Linac LLRF
Testing Coordination at ESS
Tasks, Responsibilities Expectations and Needs
European Spallation Source ERIC
High Level Readiness Reviews
Lessons from the 1st Safety Readiness Review
Accelerator NCFE Liaison Officer
Status of the ESS High Power RF Systems
RF introduction Anders Sunesson RF group leader
Status & Schedule for ESS TS2
Accelerator Installation Schedule
SAR MEBT Bilbao March Mats Lindroos
Project Support Meeting January 9, 2019
IKC in operations and potentials for co-creation
Presentation transcript:

Accelerator Project organization WP# WP TITLE WP LEADER EXT. WP? DEPUTY WP LEADERs FOR EXTERNAL WPs WP01 MANAGEMENT J.G. WEISEND II NO WP02 ACCELERATOR PHYSICS M. ESHRAQI WP03 NORMAL CONDUCTING FRONT END S. GAMMINO   YES W.WINTER WP04 SPOKE CRYOMODULES S. BOUSSON C. DARVE WP05 ELLIPTICAL CRYOMODULES P. BOSLAND WP06 BEAM DELIVERY SYSTEMS S. MØLLER I. ALONSO WP07 BEAM DIAGNOSTICS A. JANSSON MIX WP08 RF SYSTEMS A. SUNESSON WP99 ACCEL INFRASTRUCTURE & INSTALLATION D. MCGINNIS WP10 TEST STANDS W. HEES WP11 CRYOGENICS P. ARNOLD WP12 VACUUM M. JUNI FERREIRA WP13 SAFETY L. TCHELIDZE WP14 ACCELERATOR INTEGRATION H. DANARED WP15 ELECTRICAL SUPPORT F. JENSEN WP16 COOLING SUPPORT A. LUNDMARK WP17 POWER CONVERTERS C. MARTINS Collaboration Board (1-2 times a year): ESS Technical Director Project leader Representatives of all contracted institutes (one elected as chair) Technical Board (5 times a year): Weekly ESS management team All WP leaders and deputies Representatives of all contracted institutes if not already a WP leader Weekly ESS project management team: Mats Lindroos, Project leader John Weisend, Deputy project leader Håkan Danared, In-kind manager Lali Tchelidze, Safety including radiation safety Anders Sunesson, RF systems Luisella Lari, Head planner Andreas Jansson, Beam instrumentation Matthew Conlon, QA/QC Section leaders when required

Accelerator Collaboration - Accelerator Spokes Medium β High β DTL MEBT RFQ LEBT Source HEBT & Contingency Target 2.4 m 4.6 m 3.8 m 39 m 56 m 77 m 179 m 75 keV 3.6 MeV 90 MeV 216 MeV 571 MeV 2000 MeV 352.21 MHz 704.42 MHz

Accelerator Collaboration – RF and STS Concept, courtesy of GRE (UK)

Accelerator Technical Board, 17 March 2016 Partner Institutions In-kind (main contributions) ATOMKI (RF-LPS) CEA (RFQ, SRF, Diagn) CNRS (SRF, Cryo) Daresbury Lab (SRF, Vacuum) Elettra (RF, Magn, PS, Diagn) EPFL (Modulators) ESS-Bilbao (MEBT, RF) Huddersfield Univ (RF distrib) IFJ PAN (Installations) INFN Catania (Source, LEBT) INFN Legnaro (DTL) INFN Milan (SRF) Lodz UT (LLRF) NCBJ (LLRF, gamma blockers) Tallinn UT (RF) Univ Bergen (Seconded staff) Univ Oslo (Diagn) Warsaw UT (LLRF) Wroclaw UT (Cryo) Not yet signed Contract HoA/Cover page IKC Not IKC, 32% Planned IKC, 52% Possible IKC, 13% SE,DK, 3% Paid contracts Aarhus Univ (Beam delivery) DESY (Diagn) Lund Univ (LLRF, RF) Uppsala Univ (Tests) H. Danared Accelerator Technical Board, 17 March 2016

New AD – Groups, sections and WP ACCELERATOR DIVISION WP 1 Mats Lindroos Beam Physics, Operation & Beam Diagnostics WP 2,7 Andreas Jansson Beam Physics WP 2 M. Eshraqi Beam Diagnostics WP 7 T.Shea Engineering Resources WP 99 David McGinnis LINAC WP 3,4,5,6,14 Håkan Danared Linac hardware WP 3, 4 and 5 H. Danared Integration WP 6 S. Molloy Radio Frequency WP 8,17 Anders Sunesson Power Converters WP 17 C. Martins RF Sources WP 8 M. Jensen Safety WP 13 Lali Tchelidze Specialized Technical Services WP 10,11,12,15,16 John Weisend Cryogenics WP 11 P. Arnold Vacuum WP 12 M. Ferreira Admin & QA Planning

Accelerator Division § ACCELERATOR DIVISION Mats Lindroos Beam Physics, Operation & Beam Diagnostics Andreas Jansson – GL Beam Physics Mamad Eshraqi - SL Marc Munoz Renato de Prisco Ryoichi Miyamoto Yngve Levinsen Saeid Pirani (S) (at INFN) Beam Diagnostics Tom Shea – SL Benjamin Cheymol Cyrille Thomas Hooman Hassanzadegan Hinko Kocevar Irena Dolenc Kittelmann Maurizio Donna Slava Grishin (at CERN) Rafael Baron Charlotte Roose Ebbe Malmstedt (C) Thomas Grandsaert (C) Johan Norin (C) Engineering Resources David McGinnis – GL Eugene Tanke Nick Gazis Carl-Johan Hårdh (C) Daniel Lundgren (C) Mats Pålsson (C) LINAC Håkan Danared – GL Linac Hardware Vacant - SL Christine Darve Georg Hulla Walter Wittmer Felix Schlander Nuno Elias (EIS) Peo Gustafsson (C) Frank Hellström (C) Fredrik Håkansson (C) Accelerator Integration Stephen Molloy – SL Aurélien Ponton Edgar Sargsyan Iñigo Alonso Radio Frequency Anders Sunesson - GL Power Converters Carlos Martins – SL Göran Göransson Marko Kalafatic Paulo Jose Torri (2 May) Anders Andersson (C) RF Sources Morten Jensen – SL Rihua Zeng Rafael Montano Bruno Lagoguez Chiara Marrelli Rutambhara Yogi Staffan Ekström Stevo Calic Iñigo de la Fuente Krisztian Löki (S) Miklós Boros (S) Safety Lali Tchelidze – GL Duy Phan Enric Bargalló Eder García Etxearte (I) Frank Kornegay (C 15%) Mikael Motyka (S) Spec. Technical Services John Weisend II – GL Wolfgang Hees Anton Lundmark Evangelia Vaena Frithiof Jensen Gunilla Jacobsson Cryogenics Philipp Arnold – SL Jaroslaw Fydrych John Jurns Xilong Wang Xiaotao Su Piotr Tereszkowski (C) Vacuum Marcelo Juni Ferreira – SL Hilko Spoelstra Simone Scolari Christophe Jarrige Fabio Ravelli (1 June) Kristell Barthélemy (20 June) Peter Ladd (C 50%) Admin & QA Caroline Prabert Inga Tejedor Matthew Conlon Planning Luisella Lari Lena Gunnarsson Håkan Danared – Deputy Head of Division John Weisend II – Deputy Head of the Project 63 employees (2016-04-01) Consultants, Students, Interns and empl from Eng Integr Sup Div, in Yellow + Planners = 21 people § Caroline Prabert 2016-04-01