PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.

Slides:



Advertisements
Similar presentations
Stochastic cooling and 56 MHz SRF update for Run-14 W. Fischer 21 January 2014.
Advertisements

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Project X Injector Experiment (PXIE) Steve Holmes Fermilab Proton Accelerators for Science and Innovation: Second Annual Meeting Rutherford Appleton Laboratory.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
DORIS - 2 GeV Experiences in 2011 Olympus Collaboration Meeting April 27th, 2011 F.Brinker.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Managed by UT-Battelle for the Department of Energy SNS MEBT : Beam Dynamics, Diagnostics, Performance. Alexander Aleksandrov Oak Ridge National Laboratory.
ESS DTL beam commissioning
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
Ion Source Update. We now have 2 running sources Source B has been running since the first part of June Both sources have been modified extensively since.
Linac Marx Modulator Update Trevor Butler 5/20/2015.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Status of REX and Commissioning with Beam Dr. Jose Alberto Rodriguez, BE-OP-PSB (167538)
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Y. R. Roblin Hall A beamline and accelerator status.
Developments of the FETS Ion Source Scott Lawrie.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
A Few Pointers from the Linac4 Beam Commissioning of Warm Linac Yngve Levinsen Beam Physics Section 05/02/16.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
ELENA EXTRACTION LINES W. Bartmann, D. Barna, M. Fraser, J. Jentzsch, R. Ostojic ELENA Commissioning discussion, 23th November, 2015.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
Beam Measurements After the Sources at the Ion Source Test Stand Including H 2, N 2 and Kr Gas Injection R Scrivens, Linac 4 10/04/2014 Lots of input from.
Cyclone 70 IBA Radiopharma’s high energy, high current cyclotron.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
ApEx needs for CeC PoP Experiment December 11, 2015.
MEBT status A. Shemyakin for the PXIE warm front end group PIP-II technical meeting January 20, 2015.
PXIE LEBT Status Update Lionel Prost PIP-II “Friday” Meeting January 16 th, 2015.
RFQ Installation Status 10/27/2015 October 27, 2015 Jim Steimel & Curtis Baffes.
PIP-II R&D Program PXIE Ion source and LEBT Lionel Prost PIP-II Machine Advisory Committee Meeting March 2016.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
H - ion source at the pre-acc R&D lab Update HINS Meson meeting January 20 th, 2011 L. Prost, C. Schmidt, D. Bollinger, R. Tomlin.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016.
Warm Front End Concept A. Shemyakin PIP-II Machine Advisory Committee 9-11 March 2015.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
The Preparation for CSNS Accelerator Commissioning Sheng Wang June 8, 2015, Dongguan.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
Status of CTF3 G.Geschonke 1CTF3/CLIC Collaboration Board
ESS Front End diagnostic
SF6 contamination by air in the Pelletron Recycler Departmental Meeting November 5, 2008 A. Shemyakin.
PXIE Ion Source & LEBT Commissioning Update Lionel Prost on behalf of A. Shemyakin, R. Andrews, B. Brooker, K. Carlson, J. Czajkowski, R. D’Arcy, B. Hanna,
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
Report Technical Director Storage-Ring-Installation Completed
Beam Commissioning Adam Bartnik.
Experience with beam instrumentation at Linac4
Physics design on Injector-1 RFQ
LINAC4 commissioning plans etc.
Electron Source Configuration
commissioning and measurements
Beam Commissioning at ESS
MEBT1&2 design study for C-ADS
(Beam) Commissioning Plan
Isotope Readiness Review Run Plans
Presentation transcript:

PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016

Outline Operational status –Beam line –RF –LLRF –Instrumentation Scroll pump failure Radiation Tuning and measurements Plans 5/3/2016 A.Shemyakin | PXIE status 2

Operational status Operating MEBT-1.1 in a short pulse mode –Two doublets, one bunching cavity, and diagnostics 5/3/2016A.Shemyakin | PXIE status3

Beam line The most common beam conditions –1.2 ms, 10 Hz, 5 mA pulse from the ion source –Chopping down to 20 µs with the LEBT chopper –LEBT settings were adjusted for the best RFQ transmission The last solenoid needs to be tuned in response to variations in the ion source parameters –RFQ at 65 kV inter-vane voltage (vs 60 kV nominal) 40 µs flat top of the RF pulse Transmission is up to ≥95% –MEBT quad settings are close to nominal 5/3/2016A.Shemyakin | PXIE status4

RF There were no problems with RFQ amplifiers –Pulse mode only –A spare “slice” had arrived and on Apr 28 was installed instead of a working one to verify its performance Looks good Ready to try CW Generally, RFQ works reliable –Sometimes, there are updates on spark indicator At least some of them are related imperfections in protection circuitry No problems with bunching cavity amplifier (COMARC) –Was run both in pulsed and CW 5/3/2016A.Shemyakin | PXIE status5

LLRF Status (slide from Jonathan Edelen) Both the RFQ and buncher are running well together in pulsed Beam compensation is working well –Adaptive beam compensation is stable to changes in the beam current at the nominal operating phase. We have demonstrated a cold turn on of the buncher cavity can be turned in CW –~ 2 min for a manual start –High level control can probably decrease this time RFQ is ready for CW conditioning –Optimization of the frequency tracking loop is needed for resonance control studies and cold start during CW operations 5/3/2016A.Shemyakin | PXIE status6

Instrumentation (slide from Vic Scarpine) 5/3/2016A.Shemyakin | PXIE status7 Beam Current Measurements –Front-end electronics installed and running into ACNET –Two MEBT toroids and one LEBT toroid in readout –Toroids calibrated Repeatability variation ~ 1.2% Systematics being studied –Ring pickup installed in MPS Beam Position Measurements –Two Quad BPMs and ToF BPM in front-end readout –Low-beta correction factor calculated and being installed –Studying systematics Fast Faraday Cup –Motion control operational –Scope and amplifier installed Energy Measurement –ToF motion control operational –ToF software near completion –First beam energy measurement: E = MeV

Scroll pump failure Scroll pump behind the upstream ion source turbo pump failed at ~10PM on Sunday Apr 10 –Beam line pressure increased to 20 Torr; other turbos worked –Was found next morning. Pump was replaced, and vacuum recovered in a couple of hours –Total loss ~ 2 weeks of beam operation RFQ and buncher were re-conditioned in an hour Ion source lost its HV strength –Required two openings and lengthy conditioning to recover Not clear why –Problems with gas controller caused by extensive sparking –Sparking frequency is still higher than it is used to be, ~once per 4-hrs shift vs once in several days 5/3/2016A.Shemyakin | PXIE status8

Chopper failure –Because the HV is measured inside the modulator, MPS considered the chopper operational Several existing layers of additional protection helped –The shift crew was careful of not turning on RFQ before verifying chopper operation –the ion source has always been run in the pulsed mode –RFQ was always in the short-pulse mode 5/3/2016A.Shemyakin | PXIE status9 The chopper was found not responding –Wire from the chopper plate to the HV feedthrough got disconnected –Chopper plate HV was on during the event. Likely in bad vacuum a continuous discharge to ground heated up the soldered connection.

Addressing the issues Actions – chopper –Will install additional feedthrough to read the chopper voltage from vacuum; discussing how to remove HV is pressure is bad Vacuum –Servicing the scroll pumps pre-emptively –Install gauges and modify valves between scrolls and turbos To close a valve if a scroll fails; similar to Linac’s –Replace a manual valve between the ion source and LEBT by a pneumatic valve and close it if pressure is bad –Details are in PIP2-DOCDB #83 Work to improve reliability of ion source electronics –Gas controller’s optical receiver has failed for 3 times Right now waiting for a spare, IS is down likely for a week 5/3/2016A.Shemyakin | PXIE status10

Radiation Radiation survey found a low but measurable radiation around the temporary Faraday Cup –~1 mrad/hr at contact << 5 –At 0.1% duty factor 5/3/2016A.Shemyakin | PXIE status11 –Being simulated by Energy deposition group (I. Rakhno) Should be completely eliminated with installation of “permanent” beam dump for CW operation –Need to install it as soon as possible to check Difficult to predict accident scenarios in CW –Entire 21 kW is lost to the beam pipe; working with Safety In parallel, prepare the cave re-configuration if interlocking is found required to ensure safe operation

Tuning and measurements So far most of the time is for tuning and calibrating Transmission from LEBT to the end of MEBT is up to ≥95% –Any large errors in energy and focusing are unlikely Tuning of LEBT for maximum transmission and beam centering in RFQ Tested calibrations of MEBT dipole correctors –Corrected polarity; look reasonable –Tests to % level require better understanding of BPMs and beam First emittance estimation with quad scan (~0.1 µm at 2 mA) Transverse focusing by the buncher changes with its phase First (manual) estimation of beam energy with Time-of Flight 5/3/2016A.Shemyakin | PXIE status12

Plans – short term Continue operation in pulsed mode when IS is back –Diagnostic commissioning –Trajectories, envelope estimations –Longitudinal measurements –MPS Start RFQ CW commissioning (with beam off) –May start tomorrow and continue for a week Install the beam dump (with longitudinal diagnostics in place) –May be in parallel with RFQ temperature tuning work –Check radiation Start preparations for CW beam –Diagnostics, MPS, Safety, cave etc. 5/3/2016A.Shemyakin | PXIE status13

Plans – transition to CW Starting preparations for CW beam –RFQ, Diagnostics, MPS, Safety, cave etc. Plan to open RFQ –Replace the coupler, measure the response of sensing loops, repair air leaks –Machine the plug tuners to bring the frequency to nominal The biggest uncertainty is with radiation –The plan is to re-configure the cave anyway To speed up things if interlocks are required Concurrently with the RFQ work New configuration accommodates all MEBT configurations –Continue with radiation measurements and simulations 5/3/2016A.Shemyakin | PXIE status14

Plans- FY16 Switch to CW beam when have Safety permission –Continue with pulsed measurements in parallel Install the Emittance scanner – delayed –Likely may install it around July-August –Make measurements in straight LEBT configuration Finish the LEBT bending magnet Receive 4 triplet assemblies from India (Aug- Sep) Recent news: leaks in stems of all 3 bunchers in production Shutdown for MEBT-2 installation is likely in Oct 2016 –Install LEBT bend, 4 triplets, both kickers –Move the diagnostics line to the end –Duration ~ two months 5/3/2016A.Shemyakin | PXIE status15