Tapes and Integration of Powering (endcap) Pepe Bernabeu (IFIC) Valencia/UK - Experience and future collaboration on staves/petals, June 17 th 2010.

Slides:



Advertisements
Similar presentations
WP7 ATLAS ID Barrel End Services T.J.FRASER UCL Aim: Using experience gained from work on the current ATLAS SCT Barrel, attempt an improved design and.
Advertisements

Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
1Beam Line Review. 17th November Detector parameters Fermilab Beam line monitors built to replaced SWICS Scintillating fibre tracker – readout.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Vertex 2002, Kailua-Kona Tobias Stockmanns, Universität Bonn1 Serial Powering of Pixel Modules T. Stockmanns, P. Fischer, O. Runolfsson and N.
OLYMPUS Collaboration Meeting Cooling Water David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting DESY
1 Module and stave interconnect Rev. sept. 29/08.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
1 Denis Grondin – Sept.23 TH, 2010 Cooling & mechanics status CALICE Collaboration Casablanca at LPSC ECAL.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
CVD PCB, first steps. 15 mm 25 mm Chip area. No ground plane underneath the chip. Bulk isolated => only one ground line Power lines Connector: 11,1mm*2,1mm:
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
1 Module and stave interconnect Rev. sept. 29/08.
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
Wire Bonding and Analogue Readout ● Cold bump bonding is not easy ● Pixel chip is not reusable ● FE-I3 is not available at the moment ● FE-I4 is coming.
GEM detector development at VECC Anand Dubey. 2-GEM detector tested with source symmetric mode of biasing scheme, (i.e. same voltage across both the GEMS)
3 rd Work Meeting of CBS-MPD STS, Karelia, 2009 Towards CBM STS Volker Kleipa, GSI Darmstadt.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
F February 5, 2001 Pixel Detector Size and Shape David Christian Fermilab.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
29-Jun-09H. Henschel DESY (Zeuthen) 1 Frontend Interface Summarize.
D. Nelson October 7, Serial Power Overview Presented by David Nelson
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
System implementation of a power distribution scheme based on DC-DC converters F.Faccio, G.Blanchot, S.Michelis, C.Fuentes, B.Allongue, S.Orlandi CERN.
Warm Up 1.) Name a line that contains C. 2.) Name a ray with endpoint B that contains A. 3.) Name an angle with vertex B that contains C. 4.) Name a segment.
SP & DC-DC Considering the benefits of combining serial powering and DC-DC conversion technologies in powering ATLAS SCT upgrade modules & staves Richard.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
DETECTOR PIXEL CHIP MCM PIXEL BUS COOLING TUBE PIXEL BUS AND PILOT MCM CONNECTIONS (1) SDM comp LASER DIODE Space reserved (15mm) for connections.
Rutherford Appleton Laboratory Particle Physics Department 1 Serial Powering Scheme Peter W Phillips STFC Rutherford Appleton Laboratory On behalf of RAL.
Robert Pak VTX Meeting June 3, Robert Pak 1 VTX Meeting June 3, 2005 General Progress Started general integration meetings for detector upgrades.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
≈450 mm 50 x 220 mm 2 ≈450 mm 50 x 220 mm 2 Electronics boards Size: 50 x 220 mm 8 VMM chips à 64 ch Total: 512 ch/board Zebra contact Arrangement of electronics.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
Chambers to be installed in ATLAS MSW on Small Wheel MBT0 on front-face of end-cap electromagnetic calorimeter.
LHeC “shaking hands” meeting Comments on the Tracker Design I. Tsurin Page 1Liverpool December 16th, 2011 Detector granularity Sensor technology Frontend.
Silicon strip detector R&D issues –readout chip decision –interface with PHENIX –ladder Technical options –SVX4 or MVD-TGV+AMU/ADC recut –other sensors.
HV Connections for SP HV RETURN Dummy Pad Backplane Connection Do we need to connect the HV and HV return to the “left hand” hybrid? The HV trace serves.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
R&D on substrates for CMS tracker hybrids G. Blanchot 07/NOV/2011G. Blanchot - R&D on substrates for CMS tracker hybrids1.
SLHC SCT Hybrid (CERN 2nd July 2007)1 SLHC SCT Hybrid Concept Ashley Greenall The University of Liverpool.
2 March 2012Mauro Citterio - SVT Phone meeting1 Peripheral Electronics Some updates Mauro Citterio INFN Milano.
Serial Power Distribution for the ATLAS SCT Upgrade John Matheson Rutherford Appleton Laboratory On behalf of the SP Community Thanks to Richard Holt (RAL),
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
EC: 7 DISK concept Preliminary considerations
GEM Integrated PCB readout and cooling
SVD Electronics Constraints
Mauro Citterio, Fabrizio Sabatini
Geometry 3-2 Angles and Algebra
Update of MVD services and requests
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
? ENDCAP: Mechanics IFIC-Valencia.
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Sensor Layout Options Aim is to understand the implication and constrains of possible sensor design/layout on the general ID Layout. Keep both ATLAS “drum”
Mechanics: (Tim).
C.Clerc ILD session, ALCPG /03/2010
Low Mass mechanical design
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
SIT AND FTD DESIGN FOR ILD
Study of Chinese oil-less chamber
Design and fabrication of Endcap prototype sensors (petalet)
EIC Tracking Meeting, March 26, 2012
Properties of Parallelograms
Presentation transcript:

Tapes and Integration of Powering (endcap) Pepe Bernabeu (IFIC) Valencia/UK - Experience and future collaboration on staves/petals, June 17 th 2010

DET1 DET2 DET3 DET4 DET5 DET6DET7 DET8DET9 H1 H2 H3 H4 H5 H6H7 H8H9 H10 H Powering Too many flavours of hybrids Each with different number of chips Not adequate for Serial Powering Endcap goes for DC-DC option Learn from barrel experience and contact DC-DC group Number of 128-ch chips per hybrid

HV HV connection problem on paired detectors Access for connection on opposite side, HV lines routed on hybrid Propose to bias several detectors in parallel (2, 4, 6, ?)

DET1 DET2 DET3 DET4 DET5 DET6DET7 DET8DET9 H1 H2 H3 H4 H5 H6H7 H8H9 H10 H Hybrids 11 different hybrids in one petal ! Chips don’t fit on two hybrids ! (small strip pitch) H1: Det width 71,7mm not enough H3: Det width 93,5mm not enough 128-ch to 256-ch chip Barrel option is not the best for endcap Access to paired hybrid only one side Power side or TTC/Data side Propose to join paired hybrids in one Need to study feasibility

SMC Unexplored area for endcap Geometry Position (ear, hat, …) Interface to bus cable

Bus cable Up to now is barrel-like Under detectors Alternative is two bus cables (power and TTC/data) on each side Wider petal 24 and 15 mm bus cables If paired hybrids are joint, narrower If HV detectors in parallel, narrower Less material Factor 6 reduction Cooling gets better