E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez 11-03-2015.

Slides:



Advertisements
Similar presentations
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
Advertisements

Susana Izquierdo Bermudez, on behalf of the winding team
S2 Glass Insulation Hexcel Corporation S2 Fiberglass Cloth #4522 with F81 Silane Finish. 30” (0.762 m) wide roll, 125 yards long (114.3 m),.0051” (0.130.
LHQ Coil 1 OL Curing LHQ Coil 1 Shipping Miao Yu 02/28/2013.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Raúl Morón Ballester TE-MSC-LMF
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot, X. Sarasola
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola January 29, 2014.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
FReSCa2 Technical Review, 9 th June 2015, CEA Saclay FReSCa2 Technical Review June 2015 CEA Saclay J.C Perez on behalf of Fresca2 collaboration team.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
Susana Izquierdo Bermudez. SLS parts 2 Our support is in the nose area that the reason we got the deviations in this area. For the next parts we do the.
CERN/CEA Collaboration agreement No. KE2275/TE WP4 – Nb 3 Sn technology development Pré-Kick-off meeting 03/07/2014.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O. Pincot, X. Sarasola
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
Support structure working group video- meeting P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez July 15th, 2014.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Dan Cheng 6/11/2015 QXF coil measurements plan at LBNL.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O Pincot, X. Sarasola
Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012.
Hybrid Structure with Cooling John Cozzolino LARP Collaboration Meeting Port Jefferson, NY November 4-6, 2009.
D. Smekens. 2 Coil ID  CableCu DUMMY Cu DUMMY WST DUMMY RRP 54/61 DUMMY RRP 108/127 RRP 108/127 RRP 108/127 RRP 132/169.
Stellarator magnet options. Electrical/winding issues Elegant solution for ARIES-AT does not extrapolate well for ARIES-CS –High Temperature Superconductor.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
Task 6: Short Period Nb3Sn Superconducting Helical Undulator George Ellwood
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
SQXF1 End Parts Mini Review G. Ambrosio and P. Ferracin October,
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
MQXFB Plan for mechanical alignment measurements J.C Perez On behalf of MQXF collaboration team Special thanks to Jose Ferradas for his contribution MQXF.
SQXF Cu Cable Winding Test at LBNL Dan Cheng Dec 17, 2013.
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
J.C. Perez, S. Izquierdo Bermudez 11T Dipole models instrumentation.
E. Cavanna, M. Duret, P. Ferracin, T. Genestier, L. Grand-Clement, F. Lackner, S. Luzieux, F. Savary, S. Triquet, J.C. Perez, M. Pozzobon, H. Prin, P.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
TE-MSC. 07/04/2016 Jose Ferradas TE-MSC-MDT Alejandro Carlon TE-MSC-MDT Juan Carlos Perez TE-MSC-MDT On behalf to MSC-MDT section and Coil working group.
Long coil manufacturing plan and QC at CERN F. Lackner, P. Ferracin, H. Prin, M. Duret, F. Savary, L. Favier, S. Triquet, S. Luzieux, R. Principe, C. Scheuerlein,
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Nb3Sn wiggler development
CERN Cabling Experience FRESCA 2, 11 T Dipole and MQXF A. Ballarino
QXF Coil Fabrication & Tooling Reaction / Impregnation
Procurement Status Miao Yu 11/19/2013.
A model superconducting helical undulators wound of wind and react MgB2 and Nb3Sn multifilamentary wires Center for Superconducting & Magnetic Materials.
Coil Design and Fabrication
TQS Overview and recent progress
Status of the manufacturing process of a Nb3Sn wiggler prototype
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
DS11 T Transfer function, integral field and coil length
Mechanical stability and QXF coil winding
Paolo Ferracin, Giorgio Ambrosio
MQXF updates P. Ferracin October 9th, 2014.
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
QXF schedule and milestones
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Presentation transcript:

E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez

E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez Outline 2 Coil NameDescriptionStatus MQXF-001First Practice (Cu)3D measurements MQXF-101Second Practice (Nb3Sn – Low grade)Cut MQXF-102First Coil (Nb3Sn)3D measurements MQXF-103Nb3SnReady for impregnation MQXF-104Nb3SnReady for heat treatment 1.Status 2.Pole gaps

E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez Coil The measurements have been taken with the Faro Arm Elaboration of data ongoing

E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez Coil The measurements have been taken with the Faro Arm

E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez Coil Alignment of real profile with CAD: Outer radius Pole key The sections outside the pole key have been aligned only on the outer radius: the azimuthal position is not optimized on the midplanes. Summary of results: The real sections of the coil are smaller than the theoretical one Maximum deviation on the midplanes: 0.2 mm

E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez Coil Cross sections CS 1

E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez Coil Cross sections CS 2

E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez Coil Cross sections CS 3

E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez Coil Cross sections CS 4

E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez Coil Cross sections CS 5

E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez Coil Cross sections CS 6

E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez Coil Cross sections CS 7

E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez Coil 103 The coil is almost ready for impregnation 13

E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez Coil 104 Coil inside the reaction mould, ready for the heat treatment 14

E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez Pole gaps 15 Initial pole gap set for each coil Coil 001 Cu: 3 mm Coil 101 Nb 3 Sn lowgrade: 7.5 mm Coil 102 Nb 3 Sn: 5 mm Coil 103: 4.5 mm Coil 104: 2 mm

E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez Pole gaps 16 Check of pole gap during fabrication Initial GAP (set before winding) [mm] GAP just after curing and release tension [mm] GAP before heat treatment [mm]GAP after heat treatment [mm] Coil 000 (Cu) Coil 101 (Nb 3 Sn low grade) Coil 102 (Nb 3 Sn) Coil 103 (Nb 3 Sn) Coil 104 (Nb 3 Sn)