Lab-Wide Earned Value Management System Project Core Team Meeting September 10, 2008 Dean A. Hoffer/Elaine McCluskey.

Slides:



Advertisements
Similar presentations
A Short Course in Project Management
Advertisements

Module 8: Government Required Reports
PAGE Quick Guide to the FedRAMP Readiness Process 1 August 2014 Presented by: FedRAMP PMO
Weekly Risk Report & Performance Metrics
Managing Risk: Turning the Titanic Into the Love Boat Kevin Lyday, CISSP, PMP, CIPP/G, CEA, etc. Associate Director, Information Resources, Office of Public.
Centricity Practice Solutions Health Check. The content of this presentation represents the views of the author and presenters. GE, the GE Monogram, Centricity.
ACS 567: Software Project Management Spring 2009 Instructor: Dr. John Tanik.
Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.
FRA’s Earned Value Management System Corrective Action Plan Implementation January12, 2010 Dean Hoffer and Mike Rhoades.
Systems Analysis and Design in a Changing World, 6th Edition
Section 4.0 Project Implementation. Factors that Ensure Success  Update the project plan  Stay within scope  Authorized change implementation  Providing.
FRA’s Earned Value Management System Overview for Self Assessment Surveillance March 07-09, 2011 Dean Hoffer Head, Office of Project Management Oversight.
DBS to DBS i 5.0 Environment Strategy. Agenda Recommended Reference Information Roles & Responsibilities Environment Activities by Phase o Pre-Planning.
Edgecombe County Public Schools Schoolnet Assessment Training (HOME BASE) November/December 2013 Accountability Services ( ) 1.
System Implementation
MDS. 3.0 IMPLEMENTATION PLANNING The Next “Generation of Quality Services”
1 Part 5: Closing Task 1 Kelvin asked you to help him prepare and present the final project presentation. Prepare a short presentation to summarize result.
NATHAN BLACKETER JEFF MORRIS BRIAN WILDER The Great Plains Lions Eye Bank.
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
DBS to DBSi 5.0 Environment Strategy Quinn March 22, 2011.
Agenda Teams Responsibilities Timeline Homework and next steps.
Course Outlines 1) Customized SAP FICO Configuration Guide 2) Question & answers ( Real time Explanation) 3) Interview Practice sessions (Telephonic)
FRA’s Earned Value Management System Overview for Self Assessment Surveillance March 12-14, 2012 Dean Hoffer Head, Office of Project Management Oversight.
Trish Mast External Independent October 9, 2007 Linac Coherent Light Source (LCLS) The Rebaseline Process Trish Mast October.
Prof. Roy Levow Session 9.  Defining the APF  An Overview of the APF  The APF Core Values.
HFT project Overview and Status October 14, 2010 F.Videbaek BNL.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities CD-2 Planning May 8, 2007.
Lab-Wide Earned Value Management System Project Core Team Meeting October 01, 2008 Dean A. Hoffer/Elaine McCluskey.
BUS 1040: Wk. 9 Prof. Fred Pentney 1 BUS 1040 Project Management. Wk. 9 Agenda Collect Wk. 8 Home Assignment at start of class – discuss Resource allocation.
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
Lab-Wide Earned Value Management System Project Core Team Kickoff Meeting April 16, 2008 Dean A. Hoffer.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
Project Portfolio Management MaestroTec, Inc. Project Portfolio Management Providing the tools and resources necessary to effectively.
UAH Course Scheduler 9/29/2011 Status Team Pegasus: John Gleason Julie Poole Steven Boyer.
IT Services Transition Weekly Client Services Working Session March 11th, 2011 | Friday | 10:00am – 11:00am.
PRJ566 Project Planning & Management Work Breakdown Structure.
PU-PPPL Earned Value Management System Overview Thomas Egebo October 4-6, 2011 Princeton University Plasma Physics Laboratory EVMS Certification Review.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Project Management Methodology
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
DUSEL Beamline Working Group Meeting March 09, :00 AM – Snake Pit (WH2NE) By Dean Hoffer - OPMO.
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
Lab-Wide Earned Value Management System Project Core Team Meeting November 12, 2008 Dean A. Hoffer/Elaine McCluskey.
AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 AGS RSVP Weekly Meeting 6 Jan 2005 Useful Links: RSVP Project : C-AD.
PPPL is Committed to the Success of NCSX Rob Goldston, Director Princeton Plasma Physics Laboratory August 15, 2007.
Lab-Wide Earned Value Management System Project Oversight Committee Meeting December 11, 2008 Dean. Hoffer / Elaine McCluskey.
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
Lab-Wide Earned Value Management System Project Core Team Meeting May 28, 2008 Dean A. Hoffer.
Lab-Wide Earned Value Management System Project Core Team Meeting September 17, 2008 Dean A. Hoffer/Elaine McCluskey.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
DOE Review of LARP – Feb 17-18, 2014 DOE Critical Decision Process Ruben Carcagno February 17,
Problem Management for ITSD “Getting to the root of it” Thatcher Deane Feb 28, 2013.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
FRA Earned Value Management System Implementation Project October 9, 2008 Dean Hoffer / Elaine McCluskey.
Lab-Wide Earned Value Management System Project Oversight Committee Meeting September 11, 2008 Dean. Hoffer / Elaine McCluskey.
Lab-Wide Earned Value Management System Project Core Team Meeting July 10, 2008 Dean. Hoffer / Elaine McCluskey.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
FRA Earned Value Management System January 9, 2009 Dean Hoffer.
Project Management W. J. Foyt
Enterprise Resource Planning Process & Selection
Systems Analysis and Design in a Changing World, 6th Edition
LSST Project EVMS Performance Overview Kevin E
IS&T Project Reviews September 9, 2004.
SEMS Monthly Training Webinar – April 24, 2014 Compliance Management Part 2a: Consumer Confidence Reporting Presented by Chuck Pugh, Director – Professional.
Today’s Agenda Dealing with Vendors Consultants Contracts
EVMS Status and Overview
Linac Coherent Light Source (LCLS)
Linac Coherent Light Source (LCLS)
Linac Coherent Light Source (LCLS)
Executive Project Kickoff
Presentation transcript:

Lab-Wide Earned Value Management System Project Core Team Meeting September 10, 2008 Dean A. Hoffer/Elaine McCluskey

10-Sep-2008Lab-Wide EVMS Project Core Team Meeting 2 Agenda System Description and Implementing Procedures –Review by Oversight Committee [Elaine] –Streamlining Cost and Schedule Procedures [Elaine] –Implementing Procedures Process Flow Diagrams [Dean] –Next Steps [Dean] Training –Discussions on Training Material from SLAC [Dean/Elaine] –Discussion with BNL on their EVMS Training [Dean/Elaine] –Next Steps [All] Discuss CAM Notebooks –feedback from SLAC and BNL [Dean/Elaine] Feedback from PNNL, SLAC and BNL on how Contingency/Management Reserve is Tracked [Dean/Elaine] Status of customized Cobra CPR5 3 month rolling average report for variance analysis/thresholds [Dean] Status of Action Items

10-Sep-2008Lab-Wide EVMS Project Core Team Meeting 3 Review Process

10-Sep-2008Lab-Wide EVMS Project Core Team Meeting 4 Flow Diagrams Ed Vokoun of EG&G reviewed Implementing Procedures for flow diagrams. Ed generated some additional flow diagrams, comment on existing and commenting on procedure content vs. flow diagrams.

10-Sep-2008Lab-Wide EVMS Project Core Team Meeting 5 Comments from Ed Vokoun

10-Sep-2008Lab-Wide EVMS Project Core Team Meeting 6 Next Step System Description and Implementing Procedures –Review by Oversight Committee complete by 11-Sep –Core Team Review Ed Vokoun comments/flow diagram –Core Team consolidate Oversight Committee comments, Ed Vokoun comments/flow diagrams and update documents (Elaine to track comment resolution in spreadsheet) –EG&G (outside 3 rd Party) to review documents after updates complete

10-Sep-2008Lab-Wide EVMS Project Core Team Meeting 7 SLAC Training Distributed for review –LUSI EVMS Training Slides –LCLS EVMS Training Slides What is the Core Team thoughts on applicability for use by Fermi?

10-Sep-2008Lab-Wide EVMS Project Core Team Meeting 8 Training Discussion with BNL 2 Day General EVMS Training by Outside Training (for CAMs, Project Management and Senior Management) Individual CAM Coaching (Finishing School) – asked example OECM interview questions and coached on appropriate responses and use of CAM Notebook Specific Topic Training – i.e. Variance Analysis, ETC Mock Review – full week review with interviews with feedback on documentation, presentations and interview skills (done by same person as 2 day review) BNL well be sending training vendor contact information

10-Sep-2008Lab-Wide EVMS Project Core Team Meeting 9 Other Discussion with BNL ETC is tracked in Cobra using separate code class Cost estimates tracked in their own database

10-Sep-2008Lab-Wide EVMS Project Core Team Meeting 10 CAM Notebooks SLAC –Emphasized importance of having and using CAM Notebooks. Hard Copies updated by Project Controls. Information available electronically in the Hammer. (have content index) BNL –Hardcopy and same information posted monthly by Project Controls (to be sent content index)

10-Sep-2008Lab-Wide EVMS Project Core Team Meeting 11 SLAC CAM Notebook Index 1.Org Charts (Directorate and Project) 2.WBS Structure & Dictionary 3.Responsibility Assignment Matrix (RAM) 4.Milestone Structure & Dictionary 5.Work Authorization Document (WAD) 6.P3 Milestone Chart 7.P3 Detail Schedules 8.Control Account Planning (CAP) sheets 9.Cost Performance Report (CPR) Earned Value reports 10.tbd 11.EIA-748A 32 Criteria / Acronyms 12.misc

10-Sep-2008Lab-Wide EVMS Project Core Team Meeting 12 Tracking Contingency & Management Reserve PNNL –Do not use Cobra. EV done in home grown tool Plan.Net. SLAC –Use Cobra, but track Contingency and MR outside of Cobra, but include in monthly report. MR is for OPC and Contingency is for TEC. BNL –Contingency/Management Reserve is tracked and reported outside of Cobra

10-Sep-2008Lab-Wide EVMS Project Core Team Meeting 13 Customized CPR5 3 Month Average Report Report has been written by Deltek Consultant Report will be installed/tested along with Cobra V4.7 Upgrade Installation and testing in DEV environment week of 15-Sep and in PRD week of 22-Sep Projects can run and use for Sept. variance analysis and reporting

10-Sep-2008Lab-Wide EVMS Project Core Team Meeting 14 Action Items