INTRODUCTION PASI 2015 Swapan Chattopadhyay. ACKNOWLEDGMENT Steve Geer Steve Holmes Ken Long Peter McIntosh Sergei Nagaitsev Vladimir Shiltsev Alexander.

Slides:



Advertisements
Similar presentations
WG 4: High Power Proton Accelerators S. Holmes, J. Thomason PASI Collaboration Meeting April 3-5, 2013.
Advertisements

The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
ISIS Accelerator Division
Accelerator Division Sergei Nagaitsev Scientific Advisory Council 6 April 2015.
U.S. Department of Energy Brookhaven Science Associates BNL’s Role in High Energy Physics Thomas B.W. Kirk Associate Director for High Energy and Nuclear.
1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
SLAC Accelerator Research and Introduction to SAREC Tor Raubenheimer FACET Users Meeting August 29 th - 30 th, 2011.
Accelerator R&D and HL-LHC in the UK Grahame Blair Executive Director, Programmes Directorate, STFC HL-LHC 11 th November 2013.
FFAG Fixed Field Alternating Gradient synchrotrons, FFAGs, combine some of the main advantages of both cyclotrons and synchrotrons:  Fixed magnetic field.
MUON COLLIDER: R&D Status & Opportunities for Participation FNAL, February 24, 2011   1.Motivation & OverviewSteve Geer 2.Accelerator R&DVladimir.
M W PooleJoint DL-RAL Accelerator Workshop Jan 09 Introduction to ASTeC Programmes M W Poole Director.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
An Introduction To Particle Accelerators A-Level Physics.
The ISIS strong focusing synchrotron also at the Rutherford Appleton Laboratory. Note that ISIS occupies the same hall as NIMROD used to and re- uses some.
M W PooleASTeC Ten Years On Origins of ASTeC Mike Poole Former ASTeC Director.
Snapshot of UK graduate training Philip Burrows John Adams Institute for Accelerator Science Oxford University Philip Burrows TIARA Kickoff Meeting, CERN,
Future Accelerators at the High Energy Frontier
Steve Geer OsC RAL 21 June, Muon Accelerator Program MUON COLLIDER & NEUTRINO FACTORY R&D in the U.S.  
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
1US-UK Workshop, Jan 12-14, 2012 Working Group 4 - High Power Proton Accelerators: Achievements and Plans for Second PASI Workshop John Thomason & Steve.
Peter McIntosh (STFC Daresbury Laboratory) Jim Clarke (STFC Daresbury Laboratory) Camille Ginsburg (FNAL) 2 nd PASI Workshop, RAL April 3 - 5, 2013.
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
High Power Proton Facilities Sergei Nagaitsev APS April 2015 meeting 11 April 2015.
Staging of a Neutrino Factory (and beyond…) Mark Palmer Director, US Muon Accelerator Program NuFACT 2014, Glasgow, August 25-30, 2014 NUFACT2014 XVIth.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
Fermilab Perspective: Where are We Going with Project-X, and How Can it Benefit Nuclear Energy? Stuart Henderson PASI Meeting April 5, 2013.
Fermilab: Prospects and Plans Giorgio Apollinari Fermilab New Opportunities in Physics May 10-13, 2009.
Simplified Modeling of Space Charge Losses in Booster at Injection Alexander Valishev June 17, 2015.
Fermilab Accelerator R&D Strategy Steve Holmes URA Visiting Committee May 8, 2006.
Fermilab: Present and Future Young-Kee Kim Data Preservation Workshop May 16, 2011.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement High Efficiency Work.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Muon Accelerators for Particle Physics Working Group Summary Conveners: Jaroslaw Pasternak Imperial College/RAL STFC Mark Palmer Fermilab Proton Accelerators.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
The ISIS Facility John Thomason Synchrotron Group Leader ISIS Department Rutherford Appleton Laboratory / STFC (With thanks to David Findlay) Fermilab,
Fermilab SRF Linac Development Steve Holmes Workshop on High Intensity Proton Accelerators October 19, 2009.
From Accelerator Physics Center 09/02/2014V. Shiltsev | AD/APC All-Hands Meeting1.
10/21/2009Dr. Carol Johnstone1 Workshop Charge: Dr. Carol Johnstone Sept 21-25, 2009 Fermilab.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
Status of FNAL accelerator complex Sergei Nagaitsev 47th Annual Fermilab Users Meeting 11 June 2014.
U.S. Plans for High Power Proton Drivers Steve Holmes Fermilab Workshop on Physics with a Multi-MW Proton Source CERN May 25, 2004.
Ionization Cooling for Muon Accelerators Prepared by Robert Ryne Presented by Jean-Pierre Delahaye MICE Optics Review Jan, 2016 RAL.
Fermilab: Introduction Young-Kee Kim DOE KA12 (Electron Research)Review June 22-23, 2010.
PASI13 WG5: Applications Hywel Owen (Ken Peach, Stuart Henderson) Review from PASI12 ANL, BNL, FNAL, Huddersfield, Manchester, Oxford, STFC etc.
A.Seryi, Jan 14, 2012, US-UK accelerator workshop Muon acceleration - potential synergies view from UK Input for discussion Andrei Seryi January 14, 2012.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Research and development toward a future Muon Collider Katsuya Yonehara Accelerator Physics Center, Fermilab On behalf of Muon Accelerator Program Draft.
Welcome! Robert Zwaska 23 November 2015 Workshop on Booster Performance and Enhancements.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
Steve Holmes DNP Meeting/Santa Fe November 6, 2010 Project X: A Multi-MW Proton Source at Fermilab.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
UK Neutrino Factory Conceptual Design
Accelerator R&D for Future Neutrino Projects
Introduction to ASTeC Programmes
Jeffrey Eldred, Sasha Valishev AAC Workshop 2016
Report on EUCARD WP6: MICE Transnational Access (TA)
Presentation transcript:

INTRODUCTION PASI 2015 Swapan Chattopadhyay

ACKNOWLEDGMENT Steve Geer Steve Holmes Ken Long Peter McIntosh Sergei Nagaitsev Vladimir Shiltsev Alexander Valishev Eric Prebys and PASI Advisory/Organizing Committee 10/13/2015A. Valishev | IOTA Program - APT Seminar2

PASI 2015 PASI 2015 November 11S. Chattopadhyay3 WORKSHOP: the 3 rd in a series. Forum to explore areas of UK-US collaboration on proton (ion) accelerator R&D Focus: collaborative development :  Multi-MW sources for science (neutrinos and neutrons)  Novel concepts and techniques of nonlinear dynamics of intense beams with self-fields  Innovations for translation to applications in health, energy, environment and industry. The U.S. program is centered on progressive development and implementation of high power proton accelerators (PIP  PIP II  PIP III), serving the future flagship international particle physics experiment (DUNE) involving multi-MW beams and viable targets, SCRF technology, novel accelerator test facilities (e.g. FAST/IOTA), industrial applications (IARC) and international collaborations (CERN-LHC, UK-MICE and India-PIP-II).

PASI 2015 (cont’d) PASI 2015 November 11S. Chattopadhyay4 The UK proton (ion) accelerator program and skills base are anchored in the high intensity proton accelerator development connected with the ISIS facility at Rutherford Appleton Lab and SCRF technology program at Daresbury Lab, with major contributions on HL-LHC at CERN, ESS, international MICE collaboration and novel developments for medicine, energy, environment and industry Within the context as above, there are accelerator challenges of mutual interest on both sides of the Atlantic. There is also room for new ideas that can lead to, or enable the exploitation of, even higher intensities, better control of beams, innovative concepts and compact cost-effective alternatives This meeting offers the opportunity for discussing ongoing collaborative efforts and their next steps, including exploring new areas of collaboration.

US INSTITUTIONS PASI 2015 November 11S. Chattopadhyay5 Fermilab National Lab Partners: SLAC, Jefferson Lab, ANL, BNL International Partners: CERN STFC RAL, JAI and CI (UK) BARC, RRCAT, VECC (India) ………. University Collaborators: Northern Illinois University, Univ. of Chicago, Illinois Institute of Technology, Univ. of Maryland, Univ. of California at Berkeley, University of Knoxville, MIT, Cornell University, Univ. of Oxford (UK), Imperial College London (UK), Hiroshima University (Japan) …… Industry: Illinois Accelerator Research Center (IARC), Radia-Beam, RadiaSoft, Tech-X, AEC, …

UK INSTITUTIONS PASI 2015 November 11S. Chattopadhyay6 STFC: Rutherford Lab (ISIS) and Daresbury Lab (ASTeC) National lab/Institute Partners: Cockcroft Institute, John Adams Institute, Huddersfield International Institute for Accelerator Applications International Partners: CERN, ESS University Collaborators: Oxford, Imperial College London, Royal Holloway, University College London, Liverpool, Lancaster, Manchester, Strathclyde, Huddersfield,….. Industry: CERN BIC, DSIC, HSIC, Shakespeare Engineering, e2v, ….

Fermilab Today: Fermilab operates the largest Particle Physics proton accelerator laboratory in the U.S. and collaborates with CERN housing the largest proton accelerator complex in the world. Part of current operations/programs/projects: –Proton Improvement Plan (PIP), PIP-II and future PIP-III –Muons: Muon g-2, Mu2e, MAP (including MICE and Targets) –Neutrinos: LBNF, MicroBoone –LHC upgrades at CERN: HL-LHC (via LARP) –LCLS-II at SLAC (SCRF linac modules) –Novel Accelerator R&D and Test Facilities: FAST, IOTA, SRF Cavities, Magnets –Commercialization of our accelerator technologies (IARC) S. Chattopadhyay7PASI 2015 November 11

Fermilab operates a total of 16 km of accelerators and beamlines: A 400-MeV proton linear accelerator (0.15 km) An 8-GeV Booster synchrotron (0.5 km) An 8-GeV accumulator ring (3.3 km) A 120-GeV synchrotron (3.3 km) A Muon Campus Delivery ring (0.5 km) and soon Muon g-2 ring Transfer lines and fixed target beam lines (8 km) Two high power target stations, several low-power targets People: 660 (Accelerator Science, Technology and Engineering) – operations, projects, programs, R&D, program support, Work For Others S. Chattopadhyay8PASI 2015 November 11

Intensity Frontier Accelerators S. Chattopadhyay9 ʃ Ldt Different merit matrix from colliders – instead of fb -1 of ʃ Ldt : 600 MW*kTon*years 600 MW*kTon*years for DUNE experiment Thrust for Megawatts of beam power  challenges: High intensity sources, Efficient acceleration without losses, Halo control and collimation, Advanced injection and extraction, Novel high-power beam targets and focusing systems Cost efficient accelerator MW/$$ vs detector kTons/$ $ PASI 2015 November 11

Accelerator Complex Now 400 MeV NC Linac PASI 2015 November 11S. Chattopadhyay10 8 GeV RCS Booster 120 GeV RCS Main Injector 8 GeV Recycler 0.5  0.7 MW on ν target

“Near future”, PIP-II, ca MeV SC Linac PASI 2015 November 11S. Chattopadhyay11 8 GeV RCS Booster 120 GeV RCS Main Injector 8 GeV Recycler MW on target

PIP-III “multi-MW”- Option A: 8+ GeV smart RCS (Rapid Cycling Synchrotron – ring) 800 MeV PIP-II SC Linac PIP-II PASI 2015 November 11S. Chattopadhyay12 “smart” RCS new 8-12 GeV “smart” RCS 120 GeV RCS Main Injector 8 GeV ? Recycler ? ≥ 2.5 ≥ 2.5 MW target

PIP-III “multi-MW” - Option B: 8 GeV linac 8 GeV 8 GeV SC Linac =0.8  3  8 PASI 2015 November 11S. Chattopadhyay GeV RCS Main Injector 8 GeV Recycler ≥2.5- ≥2.5-MW on target

Fermilab Accelerator Program: P5-Aligned Advanced Accelerator R&D Towards Next Generation Machines Develop and explore transformative concepts and technologies for beyond next- generation multi-MW accelerators at FAST/IOTA and in the area of SRF Exploratory Long-term R&D e.g. assess feasibility and demonstrate technologies for future 100 TeV pp collider and conclude ionization cooling demo for possible future muon facility Operational Support and Complex Upgrade (PIP-II) Provide accelerator physics and technology support for operation and upgrades of the Fermilab’s accelerator complex, ν and µ experiments Accelerators Training and Education Train the next generation of accelerator designers and builders through the USPAS and Fermilab programs Accelerator and Beam Physics Contribute to the fundamental understanding of beam dynamics through experiment, simulation and theory PASI 2015 November 11S. Chattopadhyay14

UK Proton Program ISIS Operations and Upgrade Front-End Test Stand and MICE at RAL HL-LHC at CERN and ESS at Lund builds on work of CI/JAI and others Superconducting RF at Daresbury Lab Novel R&D: Paul Traps, Laser-related proton acceleration, Compact Sources ADS, ADSR/FFAGs, Material Irradiation and Medical Accelerators Possible contributions to PIP-II, PIP-III and novel R&D on FAST/IOTA Already a collaborator on LBNFand DUNE S. ChattopadhyayPASI 2015 November 1115

Front-end test stand MICE ISIS UK Accelerator and SCRF Facilities at RAL and DL HL-LHC Crab Cryomodule at CERN by 2020 ESS High-β Cavities SRF Thin Films S. ChattopadhyayPASI 2015 November 1116

PASI 2015: OUTLOOK PASI 2015 November 11S. Chattopadhyay17 There are accelerator challenges of mutual interest on both sides of the Atlantic. There is also room for new ideas that can lead to, or enable the exploitation of, even higher intensities, better control of beams, innovative concepts and compact cost-effective alternatives for SCIENCE, HEALTH, ENERGY, ENVIRONMENT and INDUSTRY The FOUR Working Groups in this workshop have been very carefully formulated by the organizers for us to focus on the specifics of these topical areas of relevance This meeting offers the opportunity for discussing ongoing collaborative efforts and their next steps, including exploring new areas of collaboration Wish you a SUCCESSFUL three days of workshop!!!!