DD Progress Report 2. APPROX. % OF TOTAL PROJECT COMPLETE: –75% of the total project including documentation.

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

PHP SQL. Connection code:- mysql_connect("server", "username", "password"); Connect to the Database Server with the authorised user and password. Eg $connect.
Student Getting Started Guide *Updated December 2011 to include information on Integrated Digital Book/MindTap Reader.
SFDC Integration Basics Gerry Winning. Integrating Your Progress App with SFDC Ovid Back Office App is Fully Integrated with SFDC (about two and a half.
SAM 2007 v4 The Student Experience Including SAM Projects, SAM Exams and SAM Training.
SAM 2007 v3.0 The Student Experience Including SAM Projects and Course Assess assignments.
Student Getting Started Guide Updated June Ensure that you are connected to the Internet. 2. Launch your web browser (Internet Explorer, Firefox,
OLAP Cubes and Pivot Tables Leveraging the Power of a Microsoft EPM Solution EPM Customization Series Part 1 February 21 st, 2007 Brendan Giles, PMP, MCP.
Reference and Instruction Automated Statistics Gathering and Reporting System Members: Patrick Chen (pyc7) Soo-Yung Cho (sc444) Gregg Herlacher (gah24)
Engineering H193 - Team Project Spring Quarter 2003 P. 1 Laboratory Quiz, Guidelines for Final Report Draft, Performance Test on Friday Week 5 Day 2.
March 20, 2008 Team DunKyan.  Functionality implemented to date  Current activities  Plans for rest of semester  Software demonstration  Reporting.
Team Members: Brian Barnes Jason Featherman Matt DeWitt Chris Blanchard.
Quality Assurance CS 615. Mission Statement The Quality Assurance team will provide assurance to stakeholders in CS-615/616 projects that their projects.
Online testing made effective and easy. The easy way to have your tests answered and scored online. If you have a test in a PDF file, it can be online.
Introduction to Database using Microsoft Access 2013 Part 1 November 4, 2014.
ARCHIBUS Log On Instructions. Log Into ARCHIBUS Web Central Log In Screen 1.Open your Internet browser. 2.Enter the URL to view the ARCHIBUS Login Page.
By the end of this session you should be able to...
10/26/00Splitting Access Databases...1 Preparing for Access 2000 Windows 2000/Office 2000 Roll-out.
Bryce Rodgers Kent Warner Matt Heckman.
Catlyn Colson. Recap of Previously Completed Work Previously I had done the following: Built the Database, started basic layout of the webpage, connected.
Web Based Inventory Site Building Room Asset Number Category Type Description Serial Number Manufacturer Model Vendor Name Acquired Date P O Number Budget.
Module 7: Data Entry (REDCap)
Team Members David Haas Yun Tang Robert Njoroge Tom Kerwin Clients Facilities Management Don Anderson Rick Klein.
CSE 403 Section: SRS and Use Cases January 14, 2010.
Software Engineering Project: Research Expert Prabhavathi Kumarasamy Joshua Thompson Paul Varcholik University of Central Florida.
TestFiles Life Cycle Architecture Chris Byszeski Ooi Hsu Han Amir Kouretchian Sachin Pradhan Quang Tran Peter Turschmid Nick Walker.
SAM 2010 v1.5 Student Walkthrough. Initial Set Up 1.Ensure that you are connected to the Internet. 2.Launch your web browser (Internet Explorer 7 or 8,
WAD Web application for managing the indicators of the research activity in a university department.
Boston University Project Management Association Website Development Group 3 Team3 CS632 Dr. Vijay Kanabar Team Members Mario Soto Emily Ziegler Kevin.
Capstone – Team C Project: Sisters Of The Road
Moving into Implementation SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED.Roberta M. Roth.
Accomplishments: Implementation Login form Dictionary Inputs Calculations(Partially Completed) Output(Partially Completed) Made a test database.
Project Overview Graduate Selection Process Project Goal Automate the Selection Process.
1 Smarter Balanced Field Test Training March, 2014.
TRW Code Updates for WCRS Document Activity ERD, EAR and Part Generator Changes August, 2006 TRW Automotive August, 2006 TRW Automotive August, 2006.
Damian Tamayo Tutorial DTM Data Generator Fall 2008 CIS 764.
NFIRS Data Entry Browser Interface (DEBI)
GAIA (Genetic Algorithm Interface Architecture) Midterm Progress Presentation Created By: Charles Hall Héctor Aybar William Grim Simone Connors.
T Project Review Sotanorsu I3 Iteration
1 March 2005Spartacus Computing Solutions1 WELCOME to the Detailed Design Presentation Ms. Kate Zimmerman, Siena College Academic Program Administrator.
3 Copyright © 2004, Oracle. All rights reserved. Working in the Forms Developer Environment.
Incorporating Feedback Lesson 5 0. Check-in: paper prototype By now, your paper prototype should be complete, so that you can begin creating your app.
CS 39x Class Project Final Presentation. Purpose: Inform everyone of the work done in phase 3 of the Workbook project. Additionally: –Future work for.
 Shopping Basket  Stages to maintain shopping basket in framework  Viewing Shopping Basket.
Suite TUG 2008, Orlando zTPFGI for Applications Jeff Longwell.
Visual Basic for Application - Microsoft Access 2003 Finishing the application.
Company Management System (CMS) Customer LT Igawa, USN 25 Company Officer Technical Advisor Lori Delooze Assistant Professor.
ASSIGNMENT 2 Salim Malakouti. Ticketing Website  User submits tickets  Admins answer tickets or take appropriate actions.
DAY 14: ACCESS CHAPTER 1 RAHUL KAVI October 8,
Automated Testing April 2001WISQA Meeting Ronald Utz, Automated Software Testing Analyst April 11, 2001.
APRIL 10, Meeting Agenda  Prototype 2 Goals  Robust Connections Demo  System Diagnostics Tool Demo  Final Prototype Risk Mitigation  Final.
APRIL 10, Meeting Agenda  Prototype 2 Goals  Robust Connections Demo  System Diagnostics Tool Demo  Final Prototype Risk Mitigation  Final.
3M Partners and Suppliers Click to edit Master title style USER GUIDE Supplier eInvoicing USER GUIDE The 3M beX environment: Day-to-day use.
Wildfire Costing (WFCST) for Recorders A component of Wildfire One Fire Season 2016.
Unity Application Generator Step 7b: Generating HMI.
How To Start a SQL server Connecting to SQL Server.
DEVRY CIS 336 W EEK 5 G ROUP P ROJECT T ASK 3 Check this A+ tutorial guideline at
Feature-Driven Development
Developing Production Quality SQL Code
On transactions, and Atomic Operations
The Student Experience
homework assignment due Feb 23
Grades Processes: Setup and Submission
On transactions, and Atomic Operations
IT and Development support services
Module 7: Data Entry (REDCap)
Tioga Tae Kwon Do Student Management System
Writing for Cloud Tools, Process, & D
Eddie Chan Behnaz Ghouchani Golnaz Ghouchani
Project Iterations.
Presentation transcript:

DD Progress Report 2

APPROX. % OF TOTAL PROJECT COMPLETE: –75% of the total project including documentation.

LIST OF COMPLETED FEATURES: –List the features inside the Student App Logging into the system to take a test Reading and displaying information from the DB Saving to the DB Focusing on “wants” now, such as enlarging picture, etc. –Complete features for Admin app Questions and tests are displayed accurately. All queries are written and work correctly Admin Management interface is complete and reads from/writes to the DB. Logging into system Student Management

LIST OF FEATURES YET TO BE COMPLETED: –Admin Autograder Report generator

% COMPLETE DOCUMENTATION –50% or so. –Part of the documentation is the logs and source code, but a huge chunk is the actual user manual, which we have done nothing with.

PROBLEMS ENCOUNTERED AND SOLVED: –Database Permissions Issue Solved by creating master password and authenticating from an Admin users table. –QuestionsNotInTest Select Query Issue Awkward query to write. Involved writing a nested query built into the DB. Works now. –Reliance on Thomas After many sessions the rest of the team can work autonomously without incident.

PLAN FOR THE NEXT MONTH: In a nutshell, finish the project. Specifically, we need to complete the remaining aspects of the Admin app. Along with that, we need to begin thoroughly testing the database with all forms/aspects so that we can test multiple simultaneous connections (a pseudo field test, as it were). We also need to write the user manual and begin to compile our documentation together.

RISKS: –Problems with onsite compatibility

TOM: –WHAT AM I WORKING ON FOR THE NEXT MONTH: Finalizing work on the Main_Admin form so that testing may begin as soon as possible. Thoroughly testing the Admin connections to the DB, and generically trying to break the code to find errors. –APPROXIMATE MAN-HOURS TO COMPLETE: –OBSTACLES: Work Classes

CHRIS: –WHAT AM I WORKING ON FOR THE NEXT MONTH: Report Generation of the Admin app. General testing. –APPROXIMATE MAN-HOURS TO COMPLETE: –OBSTACLES: Distance from work, home, and school

JEFF: –WHAT AM I GOING TO WORK ON OVER THE NEXT MONTH: Welcome page. Form integration Testing –APPROXIMATE MAN-HOURS TO COMPLETE: –OBSTACLES: Working out

MATT: –WHAT AM I GOING TO WORK ON OVER THE NEXT MONTH: Manual Grader (database side) Auto Grader Organize/Facilitate Meetings Delegate tasks and ensure completion Paper work Oversee everything… Testing –APPROXIMATE MAN HOURS TO COMPLETE: 15 hours –Obstacles: Marriage planning ROTC Classes Time..

Gantt Chart

Demo Show Demo

Questions?