Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Platform-X Install & Activate.

Slides:



Advertisements
Similar presentations
Setup MOC Notice Step The MOC Notice Step provides a method to notify people about a MOC. In some jurisdictions, this step is required. Features: Can be.
Advertisements

TCS3 Telescope Operators area with TCS1 (about 2006) and TCS3 in Feb 2009.
Belgian User Support & Operations Centre Ham Video On-orbit Functional Commissioning - B.USOC Contribution ARISS Workshop 3 – 5 April 2014 ESTEC.
Introduction to VMware Virtualization
1 © PD, Incorporated | All Rights Reserved.1 3PDirect – Express Ops Managers April 22, :30 PM.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 11 Selecting.
Copyright © 2004 Insight Technology, Inc. All Rights Reserved. 1 Performance Insight for Oracle 5.2 V.S Oracle Enterprise Management
Why are Space Stations so Hard? Bill Dwyer, NASA-JSC ISS Command and Data Handling System Hardware System Manager Ex-Space Station Freedom Data Management.
GOES Program October 1, 2002 Steven P. Kirkner GOES Program Manager, NOAA/NESDIS.
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
3:00. 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52.
Mission Integration OZ2/Susan Lufkin/(281) Page No. 1 International Space Station Cube Lab Cube Lab Ops TIM - Ops Assessment Status 11/19/2009.
Holly Cate January 20, 2010 Main Bioinformatics Laboratory.
GOES Program Review Satellite Direct Readout Conference for the Americas Miami, Florida December 9, 2002 Gerald Dittberner Advanced Systems Planning.
Introduction to Payload Planning Will Kirby (256)
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
MSG Seal Replacement Mission Scenario Pre-Pack List (SOC OCR – ULF 1.1) MSG Front Window Exchange MSG Glove Rings & Feed- through Install MSG.
NanoRacks, LLC Michael D. Johnson (832) Page No. 1 NanoRacks, LLC Cube Lab Cube Lab Ops TIM – Cube Lab Introduction 11/19/2009 Michael D. Johnson.
EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures 1:15 BODYM-NODE2-VID R5 :15 1:25 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG #34 July 23, 2013 Tim Horvath Payload Ops Director
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
OC Team Ops Notes. Jenn Whitworth I2 PRO What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO)
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Payload Systems.
EO10-PPO-118 parcall /2/15 PARC/M.Cash MOON IMAGERY 0:10 Crew Commanding Time Critical Unattended Additional Activities TEXT FLEXIBLE MOON-CAMERA-FOCUS.
Baseline Review 05/20/14 PARC/Martha Cash RapidScat EPF-SDX INSTALLATION-HEATERS ON ADAPTER and INSTRUMENT Crew Commanding Unattended Time Critical External.
Revision G 8/22/13 PARC/T. Cassady Pro K  FD15 (+/- 5 days), FD30 (+/- 14 days), FD60 (+/- 14 days), FD120 (+/- 14 days), and FD180/R-14 (+14/-0 days)
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
EO10-PPO-051 Revision T 9/25/15 PARC/T. Cassady HRF Rack 2 8PU Drawer Installation and Configuration 1:00 TEXTFlexible Crew  Sessions required as needed.
INTERNATIONAL SPACE STATION Kathy Nordmann Payload Crew Training 18 January 2005 TRAINING and CREW OPERATIONS.
NON-PROPRIETARY July NASA Ames Research Center ARC ISS Utilization Office Cell Bio Tech Demo Payload Overview POIWG MSFC July 25, 2012.
PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL-MICAST-EVAC CMD: 0/05:00 MSL-MICAST-HEAT1 CMD: 0/02:00 MSL-MICAST-HEAT2 CMD: 0/04:00 MSL-MCS212-EQUIL.
Revision A 12/19/12 PARC/T. Cassady Spinal Ultrasound SPINAL-S/W-REV_OPR SPINAL-CREW-CONF_OPR Operator Software Review and Crew Conference Ops before Spinal.
EO10-PPO-020 OCR emcs /15/14 PARC/C. Traylor Crew Additional Activities Unattended EMCS Facility Cleanup Post Gravi-2 Ops EMCS-GASRMV MOD-RPL :20.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory PAYCOM Cadre and PD Enablement PAYCOM 207 February 2015 – Rev H.
Increment 25/26 Cube Lab Ops TIR Overview Oct. 6, 2010 Four* new Modules (3 Aluminum Modules, 1 LMA pack) MSFC Ops Lead: Andrea Wade,
NanoRacks Modules Ops Summary Inc. 29/30 8/18/2011POC: Andrea Nourse
EO10-PPO-056 Revision I 9/24/14 PARC/T. Cassady Portable PFS :20 BP Microphone Replacement TEXTFlexible Crew  Sessions required once every 18 months (within.
NASA – MSFC, Huntsville, Alabama Muscle Atrophy Research and Exercise System (MARES) Operations Summary Part I/II Karen Somers EO20/ Operations Lead
SFU Samples Run (Sample Number) A (1) G1 Video C (1) B (2) C (2) B (3) C (3) B (4) C (4) B (5) C (5) B (6) C (6) B (7) C (7) BCAT-C1 Simon Fraser University.
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerup 1 1.Scheduled by OCR. 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR.
PARC/D. Westbrook Revision B 10/23/13 SODI Procedure Review SODI-PROC-REVIEW :30 A Crew Additional Activities TEXT Flexible.
June 16, PMDIS TIM Shuttle Operations Coordinators (SOC) Roles & Responsibilities Beth Griggs Shuttle Operations Coordinator
This document is the property of EADS SPACE. It shall not be communicated to third parties without prior written agreement.Its content shall not be disclosed.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIWG August 2005.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
POD Team PARC/M. Barnett EO10-PPO-079 Revision F 8/10/15 Payload Crew Conference :30 PAYLOAD-CREW-CONF (at least twice per increment, monthly preferred)
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Japanese Experiment Module (JEM) Airlock Overview Jimmy Whitaker ISS.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory ISS Ham Planning Operations.
Revision E 12/19/12 PARC/E. Litkenhous JAXA-SDRM WGVOPN-PLC PRO-SDRM ACT-CMD 1:00 SpaceDRUMS Experiment Operations SDRM-EXP-POWER UP Nominal Operations.
2011 Development schedule.
An Introduction to the NanoRack Platform and CubeLab Modules
Top Fire Protection Services Ottawa available on Dubinskyconstruction
1 2 3 STAIRS This is an example text. This is an example text.
The Microscope.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Thing / Person:____________________ Dates:_________________
Modeling Text-Based Requirements and their Relationship to Design
Issues for preparation and implementation of training sessions
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Forms.
Chapter 08.
Reading log day one: 1. Write the date and your starting page number. 2. Copy the log (in red) below. 3. READ. (30 minutes) 4. When I say “stop,”
© 2015 Elsevier, Inc. All rights reserved.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
© 2015 Elsevier, Inc. All rights reserved.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Presentation transcript:

Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Platform-X Install & Activate Schedule by OCR NANORACK-PL-RES 2:00:05 P/L-MPC-PB START P/L-MPC-PB STOP P/L-MPC-PLAYBACK 1:10 NANORACK-HW-INS&ACT :30 PRO-NANO ACT-CMD :30 NANORACK-PL-OBCT NANORACK-PL-VIDEO A

Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Platform-X Install & Activate Schedule by OCR NANORACK-MOD-RECONFG :30 :15 NANORACK-DATA-CLCT PRO-NANO DNLK-CMD :30 PRO-NANO DACT-CMD NANORACK-PL-RES :40:05 :30 P/L-MPC-PB START P/L-MPC-PB STOP P/L-MPC-PLAYBACK :15 >10 minutes NANORACK-POWER-OFF A

Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Generic Module-X Ops Schedule by OCR PRO-NANO ACT-CMD :30 :10:30:05 :30 NANORACK-PL-RES :50 P/L-MPC-PB START P/L-MPC-PB STOP P/L-MPC-PLAYBACK B NANORACK-POWER-ON NANORACK-MOD-RECONFG NANORACK-PL-OCBT Schedule if crew has not previously used NanoRacks

Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Generic Module-X Data Transfers Schedule by OCR MondayWednesdayFriday NANORACK-PL-RES :30 :15 NANORACK-DATA-CLCT PRO-NANO DNLK-CMD :30 :15 NANORACK-DATA-CLCT PRO-NANO DNLK-CMD :30 :15 NANORACK-DATA-CLCT PRO-NANO DNLK-CMD CB

Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Generic Module-X Schedule by OCR :30:10 :30 >10 minutes NANORACK-PL-RES C NANORACK-MOD-RECONFG NANORACK-POWER-OFF PRO-NANO DACT-CMD

Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks Module-5 (Microscope-1) Generic Payload use of Microscope-1 Schedule by OCR :30:15 :30 Use of Microscope-1 for other Payload Activities (see other payload’s PPO) NANORACK-PL-RES:30 PRO-NANO ACT-CMD :30 PRO-NANO DACT-CMD NANORACK-PL-OCBT Schedule if crew has not previously used NanoRacks NANORACK-MICRO1-SU NANORACK-MICRO1-STW PRO-NANO DNLK-CMD

Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks Module-12 (Microscope-2) Generic Payload use of Microscope-2 Schedule by OCR :30:15:20 :30 Use of Microscope-2 for other Payload Activities (see other payload’s PPO) NANORACK-PL-RES:30 PRO-NANO ACT-CMD :30 PRO-NANO DACT-CMD NANORACK-PL-OCBT Schedule if crew has not previously used NanoRacks PRO-NANO DNLK-CMD NANORACK-MICRO2-STW NANORACK-MICRO2-SU

Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Filter Change Schedule by OCR :20 NANORACK-FILTER-CLN

Revision C 12/19/12 Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Crew Roll-up Notes EO10-PPO Baseline31/32 &subs 4/12/12Nom: Reserve:2.0 Inc 31/32 Working PTP dated 02/29/12: Nom:14.92 Reserve:4.0 PTP crew times include Platforms 1,2 & 3 and microscope-2. Assumes crew is familiar with hardware (no OCBT) and no Microscope-2 activities other than checkout. EO10-PPO Revision A33/34 &subs 6/28/12Nom: 7.5 Reserve:0.0 Inc 33/34 Working PTP dated 5/11/12: Nom:26 Reserve:0.15 PTP crew times include Platforms 1,2 & 3 and microscopes-1 & 2. Assumes crew is familiar with hardware (no OCBT) and no Microscope-2 activities other than checkout. EO10-PPO Revision B33/34 &subs 8/23/12Nom: 13.1 Reserve:0.0 Inc 33/34 Working PTP dated 7/11/12: Nom:26.0 Reserve:0.0 PTP crew times include Platforms 1,2 & 3 and microscopes-1 & 2. Assumes NANORACK- MOD9-DEACT is performed 6 times and NANORACK-MOD9-ACT is performed 3 times(these activate/deactivate numbers are based on Inc31/32 planning). EO10-PPO Revision C35/36 &subs 12/19/12Nom: 3.0 Reserve:0 Inc 35/36 Working PTP dated 10/24/12: Nom:4.33 Reserve:33.0 PTP crew times include Platforms 1,2 & 3 and microscopes-1 & 2. Assumes that two replacement frames will be installed during I These frames are not currently on board (launch ATV4). Activities are scheduled by OCR. Nanoracks PPO Change Log PARC/E. Litkenhous *Crew Roll-up is not maintained real-time.