ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share.

Slides:



Advertisements
Similar presentations
NITROGEN & PHOSPHORUS REMOVAL FROM SHALLOW GROUNDWATER.
Advertisements

Soil-choked Riprap covered with Erosion Control Blanket (ECB), & planted with native trees & shrubs through the ECB.
DINGMANS CREEK RIGHT BANK RIPARIAN VEGETATION PLANTINGS, WITH SOME SOIL CHOKE & PLANTING OF EXISTING Rt. 209 DELAWARE WATER GAP NATIONAL RECREATION.
MONKEY RUN, ARCADE, NY. HISTORIC RAILROAD PROTECTION & DEMONSTRATION PROJECT, 41 METHODS AND TECHNIQUES IN COMBINATION.
Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
WAYNE KINNEY’S REALLY TALL ENGINEERED ROCKED RIFFLES (ERR) CASE STUDY: ERR #12, WHICH IS A 4.7 FT TALL STRUCTURE.
SAND THE FOOT OF KANOPOLIS DAM, KANSAS Let’s build Engineered Rocked Riffle #5 the most upstream of the five riffles that will be constructed.
BUSTING MYTHS. BUSTING MYTHS ADVENTITIOUS ROOTING PLANTS CANNOT BE PLANTED DEEP Onondaga Nichol Road Bridge, Lafayette, NY.
GRADE CONTROL. STABILIZE HEADCUTS FIRST, THEN WORRY ABOUT BANK INSTABILITY SECOND.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
THE ENGINEERED FLOODPLAIN BENCH. Conceptually, for an incised system you can: raise the stream, lower the floodplain, or a little of both Lower either.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
SITE 6 – DELAWARE RIVER RIGHT BANK BLOW-OUT UP THE HILL FROM THE DELAWARE RIVER (SWIRLING RIVER EROSION & GROUNDWATER PIPING) DELAWARE WATER GAP NATIONAL.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
STONES DRILLED & PINNED TO BEDROCK WITH METAL RODS (Two case studies) by Dave Derrick.
The Slit Brush Layering Method. THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.  Bank erosion is threatening a farm road  NRCS –Environmental Quality Incentives Program {EQIP} cost.
LOCKED LOGS (LL). THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
POPLAR RIVER, LUTSEN, MN. SEPARATING THE MEGA-SLIDE FROM THE RIVER (AND MORE) By the stream dream team.
River Research & Design, Inc.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
RANDOM BOULDER FIELDS {RBF} (For bank protection) 2 EXAMPLES
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
ICE DAMAGE REDUCTION PROJECT- CHAUTAUQUA MOUTH (LAKE ERIE) WESTFIELD, NY Pix by Dave Spann.
MISSOURI RIVER INNOVATIVE BANK STABILIZATION & AQUATIC & RIPARIAN HABITAT LEWIS & CLARK REGIONAL WATER SYSTEM, VERMILLION, SD.
SOIL-CHOKED STONE KEYS WITH VEGETATION
RACKET ELK CITY LAKE NEAR INDEPENDENCE, KANSAS PROJECT CONSTRUCTED DECEMBER 7-9, 2008.
SKUNK RIVER PIPELINE PROTECTION PROJECT NEAR DENMARK, IOWA SUB MAR.
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
West Fork Beaver River, West Point, OH. Constructed Sept Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.
DUCK CREEK EAST OF EASTERN AVENUE DAMAGED BY THE BIG RAIN ON JUNE 12, 2008 (7 inches in an hour, Q-75 year flow) PROJECT CONSTRUCTED BY CITY OF DAVINPORT,
The Ottawa Hills Dam Decommissioning Project. Constructed: August 2008.
Sulphur Dunnigan Burn Dump, Yolo County, CA. (30 miles north of Sacramento, CA.) BUILT 1998.
SINGLE STONE BENDWAY WEIRS
Big Pipeline Crossing Protection Project for Williams on the Guadalupe River, South of Victoria, TX. (near the harbor) 1.3 Million Dollars Took 3 crews.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
THE STEP- BY STEPS: as posted on the FTP site. Cross-section of Eroded Bank.
NITROGEN & PHOSPHORUS REMOVAL FROM GROUNDWATER LITTLE BOGUE, MS. CONSTRUCTED NOVEMBER 2009.
McKinstry Creek, Delevan, NY This was a complete stream and floodway realignment. Constructed June-July The stream had been straightened prior.
Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
VINES & LOW GROWING GROUNDCOVERS: OVERLOOKED RESTORATION TECHNIQUES.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
NYS-DOT REGION 6 ROAD PROTECTION FOR ROUTE 248 CHENUNDA CREEK, SOUTH OF WELLSVILLE, NY. CONSTRUCTED AS A HANDS-ON WORKSHOP SEPTEMBER 2006.
CASE STUDY:Grand River at Route “A” 100 miles north of Kansas City, MO. Constructed June 2001 False Banklines using LPSTP (medium-sized river)
GOAL & FUNCTION-BASED DESIGN FOR RIPARIAN & STREAM SYSTEMS THE EIGHTEENMILE CREEK PROJECT PHASE I CONSTRUCTED AUG-SEPT 2003 PHASE II CONSTRUCTED JUNE 18-20,
McKinstry Creek NYS DOT Mitigation Project STREAM & RIPARIAN COORIDOR RESTORATION, WETLAND REWETTING, VERNAL POOLS, “RPM” PLANT EXPERIMENTAL TEST PLOTS,
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
BUSTING MYTHS VEGETATION TAKES A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
Half-Drowned Bushes with Traffic Control Stones & additional plantings.
GOODWIN WARNER MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 – MAR 2, 2007 The final design was based on the landowner’s required stream.
Headcut gets taller & ACM mat flips out of the upstream key trench of the downstream pipe crossing, which causes problems. Project.
ONONDAGA CREEK, NEAR SYRACUSE, NY
When should you fix a stream????
SINGLE STONE BENDWAY WEIRS
VEGETATION DOES NOT TAKE A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
When should you fix a stream????
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY.
Guadalupe Williams Pipeline Crossing, South of Victoria, TX
Presentation transcript:

ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share with landowner Rural (farmland) Bed material: gravel-cobble-sand, incised Pool-riffle-pool regime, slope around 1% Average width ft, ft tall banks Partially spring fed. High-quality trout stream, not stocked, natural reproduction of Rainbow, Brown, & upstream, Brook Trout

LPSTP WITH LIVE SILTATION & LIVING DIKES PERPENDICULAR TO FLOW

LIVE SILTATION {Willow branches about 1-2 inches in diameter, 6 to 8 ft long, 2/3 in ground, 1/3 out, intermixed with Silky & Red osier Dogwood that is 4 to 6 ft long}

Drawing by Robert Shenk, Catt County Soil & Water THE PLAN – ELTON CREEK DS OF FREEDOM 7 BRIDGE FLOW THE PLAN THE AREA OF INTEREST

Looking veg in LPSTP with backfilled bank. Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Looking DS. Dug trench landward of LPSTP. Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Elton Creek near Freedom 7 Bridge, Freedom, NY Install Live Siltation

Looking DS at installed Live Siltation (willow & dogwood). Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Live Siltation providing mid & upper bank protection 8 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-derrick-JUNE 13, 2008

TRANSPLANTING A LARGE CLUMP OF WILLOW TO USE AS A LIVING DIKE Multi-stem (20 to 40 stems) bushes approx. 14 to 24 ft tall, transplanted as a single clump, with roots in trench directly behind the LPSTP. Tops of branches were trimmed & used as Live Poles (6 to 10 ft long).

Drawing by Robert Shenk, Catt County Soil & Water THE PLAN – ELTON CREEK DS OF FREEDOM 7 BRIDGE LIVING DIKE WILLOW BUSH TRANSPLANTATION FLOW LIVE SILTATION LPSTP

Elton Creek near Freedom 7 Bridge, Freedom, NY Dig trenches to receive willow bushes

Looking DS at LPSTP, backfilled bank, & dug trench. Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Elton Creek near Freedom 7 Bridge, Freedom, NY Transplant large multi- stem Willow Bushes

Looking DS. Transplanting willow bush in trench Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Elton Creek near Freedom 7 Bridge, Freedom, NY Then trim long branches from bush & plant as Willow Poles

Looking DS. Trim willow & plant poles in trench. Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Looking DS. Transplant complete. Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Veg planted on a grid, Live Siltation in front & transplants Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007 Live Siltation Willow shrub transplants & willow poles

Jumping ahead,1 growing season & 2 more growing months after completion. From point bar right bank. This is the 50 ft of Live Siltation & two large willow bush transplants that took 45 minutes to install. 19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009 Live Siltation LPSTP, Live Siltation, & Living Dikes Living Dike

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, years & 8 more growing months after completion. From point bar right bank. This is the 50 ft of Live Siltation & two large willow bush transplants that took 45 minutes to install. Veg is very robust.

32 MONTHS AFTER PROJECT COMPLETION Photos by Derrick JUNE 15, 2010 FROM THE CHANNEL, WALKING US TO DS

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, years & 8 months after completion. From top bank looking DS. Stream & all stone is hidden by dense veg.

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, years & 8 months after completion. Looking the apex of the bend. Live Siltation & transplanted willows & dogwood growing well. Nice deep pool to dissipate energy.

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, years & 8 months after completion. Close-up of stacked stone wall with Live Siltation behind & some planted willow & dogwood growing through the stone wall.

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, years & 8 months after completion. Looking good aquatic habitat by stone (deep-shallow-slow-fast-structure-overhanging veg).

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, years & 8 months after completion. the the DS end of the deep pool. Note thalweg & willow growth.

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, years & 8 months after completion. Looking kicker & robust veg planted on a grid pattern.

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, years & 8 months after completion. Close-up of willow growth behind the LPSTP.

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, years & 8 months after completion. amazing willow growth in the DS key. Willow was planted up to 14 ft above base flow water surface elevation, but was planted 4 ft deep & has grown exceptionally well over the last 2+ years. Downstream key

1947 Wurlitzer & Cleophus Speed Elvis Derrick

4.75 YEARS AFTER PROJECT COMPLETION Photos by Derrick JULY 11, 2012 FROM THE CHANNEL, WALKING US TO DS

Looking left bank 4.75 YEARS LATER-Looking 4.75 YEARS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-July 11, 2012