Straw Individual assembling device and the straw linearity preliminary measurements L.N.Glonti 7.07.10.

Slides:



Advertisements
Similar presentations
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
Advertisements

Full Ribs to Rear Spar Parts Layout July 6, H2-2, Horizontal Stab Rear Spar with upper and lower doublers.
Test Chamber Assembly, 1.5M Long (59.00”) Vacuum Tube, 4.00 OD x 3.50 ID Vacuum Tube, 3.75 OD x 3.51 ID 3.375” CFF, Non-Rotatable Feedthrough, Ceramtec.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 Stave.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
University of Athens ATLAS BIS MDT assembly HEP 2001 Presented by Heraklion, 6-8 April 2001 D. Fassouliotis D. Fassouliotis.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
How to make a paper airplane
METAL CASTING PROCESSES 1.Permanent Mold Casting Processes ©2007 John Wiley & Sons, Inc. M P Groover, Fundamentals of Modern Manufacturing 3/e.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
News from the lab Large size Micromegas chambers Saclay, April Givi Sekhniaidze / Joerg Wotschack.
Jigs and procedure for ladder assembly BelleIInote #8 6 th Feb 2012 Yoshiyuki Onuki University of Tokyo 1.
BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database).
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Girders fabrication: Difficulties to achieve tolerances and machining process Igor Madariaga (ESS-Bilbao) 13 September 2011 DTL mini-workshop, CERN.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
1.Placement of support base for 70 degree-dipole magnet(D) ・ Support base for 70 degree-dipole magnet(D) should be placed horizontally with a spirit level,
Measuring Instruments
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Measuring QE with LEDs LED Carousel (See Slide 3) Focusing Tube Focuses LED light onto photocathode in vacuum chamber. Cap (See Slide 2) Thomas Nevins.
VEA’s proposal of automated assembly system WP6 meeting, 16/01/14.
New Fast Wire Scanner for Booster Mechanical Design review 2016_01_ /01/19 1 On behalf of: - EN/MME: Alain Demougeot, Nicolas Chritin - BE/BI: Dmitry.
1 Welcome to the mini-review of the Roman Pot mechanics for the ALFA project in ATLAS.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
ELECTRIC VEHICLE PROJECT CAR BUILDING PROCEDURES BY: PIERRE PEASHA CENTENNIAL HIGH SCHOOL BAKERSFIELD, CA.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
Tracking Session, Groningen, August 30th, News from Krakow on the Forward Tracker J. Smyrski Institute of Physics UJ Model of the tracking stations.
B.T. INSTITUTE OF RESERCH & TECHNOLOGY SAGAR (M.P.)
Test on mirror support prototypes M. Lenti. News from MARCON Shipping at CERN of all the mirrors: end of 2010 – beginning of dummy segments ordered.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
BM&N STS ladders assembly in VLHEP
Stator Plan & Schedule Chris Booth 2nd March 2009
Fixture.
new straw end plug: D=10.6 mm straws support frame Levan option
Quality Control in Straw Production
Status of straw production straw module assembling
INSTALLATION SEQUENCE
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
Jigs and Fixtures A Basic Look Computer Integrated Manufacturing
Electron-Beam Machining
Jigs and Fixtures A Basic Look.
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Beam Finder Wire Assembly Undulator System
Station and Module Support Frames
Wiring the Light and Relay
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
©G Dear 2009 – Not to be sold/Free to use
Beam Finder Wire (BFW) Status
Simplified Procedure Draft
Presentation transcript:

Straw Individual assembling device and the straw linearity preliminary measurements L.N.Glonti

THIS DEVICE ALLOWS THE STRAW TUBE ASSEMBLING WITH COAXIAL ENDS AND BUSHES AND MOVEBLE EDGE IN ORDINARY CONDITIONS OUTSIDE THE CHAMBER –

At we was presented about individual assembling straw tubes on the optical bench base which allows: At we was presented about individual assembling straw tubes on the optical bench base which allows: 1. The straws full assembly outside chamber on the usual working place. 2. To have one end of straws free and stretch them individually. 3. To use O-rings instead of glue, in accord Institution standard STP or GOST (ISO ???) 4. The use self centering hexagonal spacer allows strictly centering the straw in aluminum bush independently from spread in values 4. The use self centering hexagonal spacer allows strictly centering the straw in aluminum bush independently from spread in values of the straw Ø lie between ~±0.15 mm (the same also for the wires). 5. The straws and anode wires placement precision are depended practically from the chamber and end plugs prsicion produce only 5. The straws and anode wires placement precision are depended practically from the chamber and end plugs prsicion produce only but not assembling procedures accuracy.

The device for 2160 mm long straw individual assembly on the base of the 2000 mm long optical bench – was produced adjusted and full completed with accuracy of +/-20 microns (the collets for bushes and supports for straw).

L strawn = 2160 mm

Δ L straw = mm FROM + 1 atm.

Δ L straw = mm FROM 1500 g

/  All paths of assembling straw are made by accuracy of H8 (~0.010 mm) – the straw holes at the flanges, the outside bushes for ones, the self centered spacers and the insulators.  That is way we was obtained for finally accuracy of straw linearity about +/- 50 microns. +/- 50 microns.

Caliber measurement

Tungsten wire measurement

Straw sagita measurement

Tension 1500 g with fixed ends

Tension 1000 g and free end

750 g and free end

1000 g and free end

1000 g and free end (Top edge)

1000 g and free end (Bottom edge)

When we will finishing full assembling the straw at our device we will hope that this technology essentially increases reliability of the straw chamber, working in vacuum and decreases When we will finishing full assembling the straw at our device we will hope that this technology essentially increases reliability of the straw chamber, working in vacuum and decreases the assembling time and cost the assembling time and cost for the chambers mass-production.

  At using this technology the chamber it is possible assembled at horizontal position for example on the ATLAS round table without the complex high precision turn over tool. Hence the straws are at the spare condition and defects will be smaller.

  FINISH

 SATADARIGO