LBNE Target Pile & Decay Pipe Cooling Andy Stefanik and Ang Lee – Fermilab September 25, 2014.

Slides:



Advertisements
Similar presentations
Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
Advertisements

Baffling in SHELL-AND-TUBE HEAT EXCHANGERS
CM 4120 Julie King Original Presentation by Todd King and I edited it.
Target chase, decay and absorber cooling for LBNE A. Marchionni, Fermilab 8th International Workshop on Neutrino Beams & Instrumentation CERN, November.
Conduction Conceptests
Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
Heat Recovery for Commercial Buildings
First Wall Heat Loads Mike Ulrickson November 15, 2014.
Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
NuMI Radiation and Environmental Protection NBI th International workshop on Neutrino Beams and Instrumentation September 5-9, 2006 Mike Martens.
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
Spiral Condensors. Working Principle The Spiral Condensor consists of two sheets stainless steel strips which have been wounded from the centre.
The JPARC Neutrino Target
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
Corrosion & Associated Degradation
NBI March 2002 The MiniBooNE Horn Ioanis Kourbanis For The MiniBooNE Collaboration.
Fouling Factor: After a period of operation the heat transfer surfaces for a heat exchanger become coated with various deposits present in flow systems,
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
LBNF Neutrino Beam Jim Strait, Fermilab For the LBNF/DUNE Team
1 11/11/2003 NBI Decay Tube and Windows Presentation by Ans Pardons 1 Decay Tube & Windows Introduction (Location, Planning) Decay Tube Entrance.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
Table of Content Introduction of heat exchanger. Design of Coolers.
JPARC- Decay Volume M.Sakuda (KEK) 11 November Decay Volume Requirements Design 2. Construction Status 3. Summary and schedule In collaboration.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
HVACR416 - Design Air Distribution Part 2. Air Ducts Air carriers that deliver air to conditioned space. Originally hot air ducts were thin, tinned sheet.
Zian Zhu Magnet parameters Coil/Cryostat/Support design Magnetic field analysis Cryogenics Iron yoke structure Mechanical Integration Superconducting Magnet.
Be Beam Pipe Design Knut Skarpaas VIII 6/16/06. My Background on this subject- Came to SLAC 1993 to do the mechanical design of VXD3 and it’s associated.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 GRAPHITE SUBLIMATION TESTS with Inert Gas Mitigation C. C. Tsai, T. A. Gabriel, J. R.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
NUMI NuMI Internal Review July 27, 2001 Target Hall Shielding Review Page 1 Target Hall Shielding Review Radiation Safety Coordinator Nancy Grossman FNAL.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
Table of content 1- Heat exchanger design (cooler ) 2- Distillation column design. 3- Valve.
Resistance Welding Resistance Welding is a pressure welding technique using high current and low voltage The current passing through the two overlapping.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
Radiation Protection in J-PARC neutrino beam line Sep Yuichi Oyama (KEK) for T2K neutrino beam line construction group Happy birthday.
GRAN SASSO’S HADRON STOP Temperature’s behaviour under specified beam conditions Barbara Calcagno.
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
ERMSAR 2012, Cologne March 21 – 23, 2012 Post-test calculations of CERES experiments using ASTEC code Lajos Tarczal 1, Gabor Lajtha 2 1 Paks Nuclear Power.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
Status of UK contribution to LBNF beam and target system Chris Densham, Tristan Davenne, Otto Caretta, Mike Fitton, Peter Loveridge, Joe O’Dell, Andrew.
Long-Baseline Neutrino Facility LBNF Beamline optimization schedule Vaia Papadimitriou LBNF Beamline Manager Accelerator and Beam Interface Group Meeting.
MARS15 Studies of Impact of LBNF Target/Horn Optimization on the Hadron Absorber 6 th High Power Targetry Workshop Merton College, Oxford April 12, 2016.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
Hybritec Refrigerated/Blower Purge Dryers (Combination Dryer)
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
Beamline for the LBNE Project Heidi Schellman for the LBNE collaboration.
Corrosion process and control (TKK-2289)
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
SPS High Energy LSS5 Thermal contact & cooling aspects
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Development of a low material endplate for LP1 and ILD
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
News and brief overview of Beamline plans for the next few months
Heat Exchangers Heat Exchangers.
Beam dump for J-Parc neutrino facility
Cu67 Isotope Radiator & Target
Presentation transcript:

LBNE Target Pile & Decay Pipe Cooling Andy Stefanik and Ang Lee – Fermilab September 25, 2014

Outline 22 Air cooling schematic Decay pipe airflow passages Target pile airflow passages Target pile chase cooling panels (water-cooled) Heat loads and cooling parameters LBNE Facility Lifetime Energy and temperature distributions –Decay pipe –Target pile chase cooling panels –Target pile bulk shielding (Not available) Air pressure drops Corrosion LBNE Target Pile and Decay Pipe 2

* Target pile and decay pipe cooling air schematic NOTE: The chase cooling panels are cooled with water. 3 3 Beam Target pile Decay Pipe air handler, 35,000 scfm Steel shielding for labyrinth. Target Pile air handler, 35,000 scfm Helium-filled Decay Pipe Concrete shielding Shielding 20 cm annular gap Concrete shielding 4 – 28”φ cooling air supply pipes Upstream thin window 32 cooling pipes total Vent to atmosphere Clean cooling air supply: 950 scfm Downstream window Steel LBNE Target Pile and Decay Pipe NOTE: The target pile air cooling system and the decay pipe air cooling system are two separate systems. Chase cooling panels Water-proof barrier (Geomembrane) 3 * Helium purge and fill connections *

Decay pipe airflow passages 44 LBNE Target Pile and Decay Pipe 4 – 28”φ cooling air supply pipes Cooling air returns in the annular gap of the double-wall decay pipe. Concrete shielding Helium-filled Decay Pipe 32 clean cooling air pipes. 950 scfm airflow total. Water-proof barrier (Geomembrane) 4

Target pile airflow passages 55 LBNE Target Pile and Decay Pipe Cooling air inlet duct (Radiation labyrinth) Cooling air outlet duct (Radiation labyrinth) 5

Target pile airflow passages 66 LBNE Target Pile and Decay Pipe Steel shielding is solid cross- hatching. Top supply airflow. Flow is downstream to upstream. The air flows through T-blocks and other shielding blocks into the chase. “Air block” sheet metal separates supply and return airflows. Side and bottom supply airflows. Flow is downstream to upstream. Some air flows through the spaces in the bulk steel shielding. Chase return airflow. Flow is upstream to downstream. Some air flows through the spaces in the bulk steel shielding. Chase cooling panels 6

NuMI Target Pile 77 The air block sheet metal in the NuMI target pile is installed in the bulk shielding. Air block material is 304L stainless steel. The sheets are welded together with continuous welds. LBNE Target Pile and Decay Pipe 7

Target pile chase cooling panels (water-cooled) 88 LBNE Target Pile and Decay Pipe CROSS SECTION AT HORN 1 5 m high The chase cooling panels are 100 mm (4”) thick steel plates. 8

Target pile chase cooling panels (water-cooled) 99 2D: Iso-view (1/2 model): Internal water passages: LBNE Target Pile and Decay Pipe 5 side panels 5 bottom panels ½ width 9 Radiation Labyrinth with module

Target pile chase cooling panels (water-cooled) 10 Side panel dimensions: 1,219 mm length along the beamline x 5,050 mm height (48” length x 199” height); 100 mm (4”) thick. Bottom panel dimensions: 1,219 mm length along the beamline x 1,371 mm width (48” length x 54” width); 100 mm (4”) thick. The chase cooling panels are low carbon steel plates. LBNE Target Pile and Decay Pipe 10

Heat loads and cooling parameters for 2.3 MW 11 Annular decay pipe: MARS energy deposition is 700 kW. –Inner pipe: 360 kW MARS energy deposition –Outer pipe: 100 kW MARS energy deposition –Shielding concrete: 240 kW MARS energy deposition –Air flow rate: 35,000 scfm (71,440 kg/hour) in decay pipe –Heat load: 834 kW (1.2 multiplier on MARS energy deposition) –Air supply temperature: 15 °C (59 °F) –Air return temperature: 57 °C (135 °F) –Air flow rate: 950 scfm (1,940 kg /hour) by geomembranes –Heat load: 6 kW (1.2 multiplier on MARS energy deposition) –Air supply temperature: 15 °C (59 °F) –Air return temperature: 26 °C (79 °F) LBNE Target Pile and Decay Pipe 11

Heat loads and cooling parameters for 2.3 MW 12 Target pile: MARS energy deposition is 525 kW. –Chase cooling panels: 317 kW MARS energy deposition –Bulk steel shielding: 208 kW MARS energy deposition –Air flow rate: 35,000 scfm (71,440 kg/hour) –Heat load: 250 kW (1.2 multiplier on MARS energy deposition) –Air supply temperature: 15 °C (59 °F) –Air return temperature: 27.5 °C (81.5 °F) –Water flow rate: 290 gpm (66 m^3/hour) –Heat load: 380 kW (1.2 multiplier on MARS energy deposition) –Water supply temperature: 38 °C (100 °F) –Water return temperature: 43 °C (109 °F) LBNE Target Pile and Decay Pipe 12

LBNE Facility Lifetime 13 Lifetime required for the facility and the waterproof barrier is 50 years: – 5 years operating at 1.2 MW –15 years operating at 2.4 MW –10 years for construction, upgrades and maintenance Sub-total = 30 years for the Operating Lifetime –10 years for activation cool-down The facility is ready for demolition after the cool-down period. –Allow 10 years to plan and complete demolition. –Facility Lifetime requirement is = 50 years. –NOTE: The waterproof barrier must have a lifetime of at least 50 years so it is intact when concrete demolition starts. The concrete will have a sizable tritium inventory 20 years after the 30-year operating lifetime is over and the waterproof barriers will still be needed to prevent water from wetting undisturbed concrete during demolition. LBNE Target Pile and Decay Pipe 13

LBNE Facility Lifetime 14 Waterproof barrier (geomembrane) strength half-life is a function of operating temperature: –Detailed information only available for HDPE (Courtesy of Ed Kavazanjian - Consultant): Geomembrane “strength half-life” from Rowe (2005) o C continuous o C continuous o C continuous Based on the facility lifetime requirement of 50 years, we select a geomembrane strength half-life of 80 years and specify 40 to 45 °C as the maximum operating temperature range for the waterproof barrier. Waterproof barrier temperature will slightly exceed 40 °C during the 15 years of 2.4 MW operation but will be much less than 40 °C when the particle beam is off so we believe we will be very close to achieving the 80-year strength half-life. LBNE Target Pile and Decay Pipe 14

Energy distribution – Decay pipe 15 Energy distribution at 2.3 MW LBNE Target Pile and Decay Pipe 2.3 MW 15

Energy distribution – Decay pipe 16 Energy distribution at 2.3 MW LBNE Target Pile and Decay Pipe 2.3 MW 16 Further away from center, EDEP decays quickly Note: Similar as decay pipe and steel liner, the maximum occurs at Z=~50 m

Temperature distributions – Decay pipe 17 LBNE Target Pile and Decay Pipe Case 74 pipes (base line) Case_1 32 pipes Case_1a Maximum steel decay pipe temperature (C) Maximum annulus steel liner temperature (C) Maximum Concrete Temperature C Maximum temperature (Geomembrane _ inboard) MW 17

Temperature distributions – Decay pipe 18 Water-proof barrier (geomembrane) temperatures: LBNE Target Pile and Decay Pipe 2.3 MW 18

Energy distribution – Target pile chase cooling panels 19 Energy distribution at 2.3 MW LBNE Target Pile and Decay Pipe 5 panels at horn 1 3 panels at horn 2 19

Temperature distributions – Target pile chase cooling panels 20 Eight cooling passages in each side panel, 8 tube passes on each bottom panel, 38 °C (100 °F) cooling water supply temperature, 2.3 MW: LBNE Target Pile and Decay Pipe 20

Air pressure loss – Decay pipe 21 Air flow rate for the decay pipe: 35,000 scfm (71,440 kg/hour) –ΔP = 2,500 Pa (10 “WC) for the 4 supply lines and the decay pipe annulus. Air flow rate out by the geomembranes: 950 scfm (16,330 kg /hour) –ΔP = 625 Pa (2.5 “WC) for the 32, 76.2 mm (3”) inside diameter pipes. LBNE Target Pile and Decay Pipe 21

Air pressure loss example – NuMI target pile 22 NuMI: ΔP = 746 Pa (3” WC) for only the target pile, not including the air ducts and filters. I expect the same pressure loss for LBNE. LBNE Target Pile and Decay Pipe 22 ΔP

Corrosion Design life for beam related corrosion is 20 years. (5 years at 1.2 MW plus 15 years at 2.4 MW.) LBNE will receive 27.3 MW-years in its operating lifetime. NuMI has received 1 MW-year so far. If moist air is used to cool the LBNE target pile and decay pipe, the primary corrosive issues are: –Moisture (non-beam related corrosion) –Nitric acid, HNO 3 (beam related corrosion) –Ozone, O 3 (beam related corrosion) –Stress corrosion cracking/hydrogen embrittlement of high strength low alloy steel (beam related corrosion) We will eliminate the last issue by not using high strength low alloy steels. LBNE Target Pile and Decay Pipe 23

Corrosion We will control some corrosion by drying the air. Relative humidity for the cooling air supply is currently required to be less than or equal to 10%. For comparison, the relative humidity in the NuMI target pile for the cooling air supply is 20%. The cooling air return is in the 30% to 50% range. With dry cooling air the primary corrosive agents in the LBNE target pile and decay pipe are: –Ozone, O 3 (beam related corrosion). –N x O x (beam related corrosion) Of these two, ozone is the dominate corrosive agent. LBNE Target Pile and Decay Pipe 24

Corrosion Our plan to study ozone and N x O x corrosion: –Consult with HEP facilities. –Conduct literature search. –Work with corrosion consultants. We are working with a consultant now and might do so again in the future. –Develop a mathematical model to predict the formation of corrosive agents when the beam interacts with the cooling airflow. –Test the mathematical model by measuring concentrations of corrosive agents in the NuMI target pile. We have started installing sample tubing in the target pile and will be purchasing instruments in the near future. –Expose metal samples to the high radiation and the corrosive environment in the NuMI target pile. The material samples include: aluminum, carbon steel, stainless steel, anodized aluminum, the heat affected zone (HAZ) of welded joints, and weld material. LBNE Target Pile and Decay Pipe 25

Corrosion Our plan to study ozone and N x O x corrosion (continued): –If necessary, run tests to determine quantitative ozone corrosion rates (uniform and pitting) at concentrations and temperatures expected in the LBNE target pile for base metals, the heat affected zone (HAZ) of welded joints, and the weld material. Corrosion is most critical for components made with thin materials because function can be lost or impaired when the material corrodes through. An important example is the decay pipe. We can eliminate oxygen related corrosion in most of the decay pipe by cooling it with dry nitrogen gas instead air. LBNE Target Pile and Decay Pipe 26

* Target pile and decay pipe cooling air schematic NOTE: The chase cooling panels are cooled with water. 27 Beam Target pile Decay Pipe air handler, 35,000 scfm Steel shielding for labyrinth. Target Pile air handler, 35,000 scfm Helium-filled Decay Pipe Concrete shielding Shielding 20 cm annular gap Concrete shielding 4 – 28”φ cooling air supply pipes Upstream thin window 32 cooling pipes total Vent to atmosphere Clean cooling air supply: 950 scfm Downstream window Steel LBNE Target Pile and Decay Pipe NOTE: The target pile air cooling system and the decay pipe air cooling system are two separate systems. Chase cooling panels Water-proof barrier (Geomembrane) 27 * Helium purge and fill connections *

Corrosion Sample basket in the NuMI target pile. It gets installed in the chase by the horns. LBNE Target Pile and Decay Pipe 28

Conclusion We have reviewed the preliminary decay pipe design. We have more work to do to finalize the design. Thank you for attending my presentation. Comments? Questions? LBNE Target Pile and Decay Pipe 29