Status 1 5/07/08 UCB RBSP EFW STATUS 5/07/08
Status 2 5/07/08 UCB Agenda Project Stuff Monthly Report Submitted Schedule Submitted Milestones Upcoming : Combined IRR/PDR 9/04/08 (new agenda) See Project Action List attached Safety and Mission Assurance The Matrix.v. PAIP Upcoming Telecon on Wed 5/14 at 9:00-11:30am Pacific Parts Micro 4Gbit part purchase (1000 qty!) OpAmp Tester Materials Selection Radiation Tests at APL: Should the Cable be Tested? Mechanical Status SPB (Spec, Preamp Shield Design, New Wire, Electrical Diagram) Preamp Shielding Design. AXB (Spec, Sensor Whip Design, Electrical Diagram) Sensor Whip Design Complete, Breadboard Sensor Built. Test Results IDPU( Box Concept) Connector Radiation Paths
Status 3 5/07/08 UCB Goal: 350 mils Al equivalent Rule of Thumb: Al thickness x (Al density / Ta density) Tantalum equivalent: 56 mils Bronze equivalent: 106 mils PEEK equivalent: 726 mils GD 5/7/08 e-e- e-e- e-e- Preamp Enclosure
Status 4 5/07/08 UCB EFW Action Items
Status 5 5/07/08 UCB Project Action Items
Status 6 5/07/08 UCB Project Action Items
Status 7 5/07/08 UCB Schedule
Status 8 5/07/08 UCB Next Weeks Agenda Electrical Status, Documents, Breadboarding SYSTEM Developments Removal of Density Mode IDPU Development DCB (Breadboard, FPGA design, ALBM, A/D latchup) DFB (New Specification) BEB (Spec, Breadboards, EMFISIS buffers) LVPS w/PCB (Spec, Breadboard, Candidate Parts for Radiation Tests) Backplane (Spec, Stress Analysis) FSW (Spec, Test Plan) Preamp (Shielding, Insulation, DDD, First Circuit mods) GSE (Requirements, Selection of Heritage Software, S/C Sim, Schedule)