KAIZEN TEAM Dave Stelmachowski – Manager San Diego - 62 Robert Riggs – Manager San Francisco - 54 Adam Past – Lean Six Sigma Coordinator February 27 –

Slides:



Advertisements
Similar presentations
Organizing Official FLL Kits. Purchase Your Kit When you buy the official FLL kit this is what it comes in; the gray 9797, and blue 9648 bins.
Advertisements

LT6 5S + 1   CONTINUOUS IMPROVEMENT OFFICE.
To Create a Workplace suited for Visual Control and Lean Production
Understanding 5S.
5S training Office Environments.
CHUGACHMIUT Tatitlek Clinic 5S+2 March 8-10, 2010.
My Life Monday Office safety Keeping you work area clean and tidy
Screen print Ink Mixing Station Best Practices Workspace clean Supplies properly put away when work complete Tools and chemicals properly labeled Weighing.
Ch-3 5s1 5S Workplace Organization. Ch-3 5s2 5S 5S Contents: S1 --- Sort out. Get rid of the stuff you don’t needed. S2 --- Set in order. Place the stuff.
Developing Lean Process Strategies That Work Randy Benson, Ph.D. Executive Director, RHQN.
An introduction to Lean tools and methodologies
1.Over Production: Producing more than is needed Over Production: Over Production: 2.Waiting: Idle Time (Down Time) Waiting: 3.Non-Utilized Talents: Under.
Every patient matters STAFF INVOLVEMENT USING LEAN IMPROVEMENT.
--OCG Confidential-- OCG Chicago: Kaizen Event Small Turning (Mazak) July, 2013.
Good Housekeeping Maintaining focus.
1 Exploring Stagecast Creator Stagecast Creator Tutorial: Kids Smoking on the Playground By: Community Simulations Team Center for Human-Computer Interaction.
Why 5S? Workplace organization required when:
CONTINUOUS IMPROVEMENT PROGRAM
Inventory in Real Time. * Make it work – Set yourself up for success * What’s the effect? * To count or not to count * Entering Inventory * Compare and.
Inventory at JCKL Cheryl Riley April What is an inventory? An accounting of each of the books in JCKL We make certain each item has ●a good and.
Student Guide to Laptop Use GETTING READY: The Basic Steps in Using the Laptop Computers!
How to enable game play with the Nintendo Wii By Eli De Carteret.
Manufacturing Processes Copyright © Texas Education Agency, All rights reserved.
Visual Workplace - A Prerequisite To Becoming World Class
This training tool is brought to you by
5S Improving safety & efficiency
Introduction: Throughout history and especially in today’s global economy, companies and agencies are constantly looking for ways to do more and more with.
Aluminum Die Casting Visual Workplace (6S).
Drill Press 09 Setup Reduction Kaizen Blitz September , 2002 Casey Backyard ProductsDrill Press 09 Setup Reduction Kaizen Blitz.
Processing Warehouse Orders for Pinnacle Auto Parts.
Visual Management Quick Review
Student Guide to Laptop Use GETTING READY: The Basic Steps in Using the Laptop Computers!
Bug Session Four. Session description Objectives Session activities summary Resources Prior knowledge of sequencing instructions using Bug Bug website.
CHAPTER 11: ADMITTING, TRANSFERRING, AND DISCHARGING.
5S Workplace Audit Category Item Level Sort Store Shine Standardize
“Without the Cost of Waste …”
1. Finding your seat - grab your name tent from the basket 2. Match the number written on your name tent to the seat number in our class 3. Take out your.
What We’ll Cover  Purge The Filing Cabinet Desk  Reorganize  Storage  Tid Bits.
Santa’s s By…….. Sending an attachment to Santa Explain how you attached the . Clicked The Paper Clip and attatched it. Explain why you.
From Concept to Reality. F & B Farms and Nursery Kaizen event June 2011 Potting Line Process Before conditions: Inconsistent work – particularly on machine.
Santa’s s By Chantelle Cogin. Sending an attachment to Santa I made a new message and i pressed the insert button and choose what I wanted.
Physical Inventory Training Class. Physical Inventory Why do we take inventory? –Inventory is a check and balance of how the system is performing. –It.
Welcome to the New BusinessPLUS Ordering system The Basics 1 Created by Teresa Zinkgraf.
© 1998 by Prentice-Hall Inc Russell/Taylor Oper Mgt 2/e Chapter 15 Lean Operations in Services.
Safety Series Safety Leadership Series 5 S + 1 Safety Makes the Difference!!!
Computer Use Vista Middle School My Expectations When you return to your seat Open and check the computer for damage Do report any damage to the.
INVENTORY It really is pretty simple. Questions? Ideas? If you find out how to do something that I didn’t cover, it is not a state secret…. Share it!
- I chose to do the Option 1 Internship, which had 260 hours of work, and was paid. - The internship went from an internship to a job. - I now am working.
BALLOT STATION. DUTIES OF THE BALLOT STATION: Account for and Secure Ballots Issue the Correct Ballot to Eligible Voters.
BE-TL1-001-DRAFT-5S 5S Business Excellence DRAFT October 5, 2007.
How to care for your computer Always keep your computer in the case whenever you are moving from one class to another. Keep your computer in a temperature.
5S Workplace Organization Northland Community & Technical College Presented by: Tim Bergerson, Robbi Brateng, Mitch Ostrom, Jesse Adkins, Bob Gooden,
Classroom Cart Reminders 1.Make sure ALL electronics are turned off before you leave in the afternoon. That means: Amplifier, Monitor and Computer (shut.
Body System Here Enter group members names here. Save Your Work! This is a good time to start saving your work. Go to FILE, then Save As…, then change.
REDLANDS UNIFIED SCHOOL DISTRICT.  Stored in a secure room, the keys travel with the cart, but should not be stored with the cart  Lock the wheels.
5S WORKPLACE IMPROVEMENT Central Stores & Freight Room.
5S Improving safety & efficiency. 5S Translation Step JapaneseLiteral Translation English Step 1:SeiriClearing UpSort Step 2:SeitonOrganizingSet In Order.
What is Activity Profiling?
5S Burr Oak Tool, Inc. 5S PROGRAM Workplace Organization SUSTAIN SORT
5S Education &Training Lean Methodology In The Office
5S and Visual Control Superfactory Excellence Program™ www
5S TRAINING.
Continuous Improvement Coordinator
Key Customer Talking Points Available Tools and Resources
8 Wastes of Lean Last Revised: 8/8/2017.
Go to =>
Go to =>
CXT Parts Dept. and Fab Shop Improvements
L.E.A. Data Technologies Introduction.
Set-up Reduction Kaizen June 4,6-7,& 18th, 2013
Presentation transcript:

KAIZEN TEAM Dave Stelmachowski – Manager San Diego - 62 Robert Riggs – Manager San Francisco - 54 Adam Past – Lean Six Sigma Coordinator February 27 – March 4

WHY DID WE PICK THIS BRANCH TO KAIZEN?

Areas for Opportunities Before 1)Start a 5S cultural at the branch 2)Repair benches 3)Arbor press area 4)Testing and common tool area 5)Vidmars

5S Standards 1)Identify areas to start 5S 2)Communicate the benefits of a 5S branch 3)Show the improvement and the gains in not having to look all over the branch for items

Before 1)Clutter at end of aisle 2)Ladder, Black & Decker sign, cardboard, and1184 items in middle of aisle 3)Clutter in the way of pulling stock from shelves After 1)Black & Decker sign thrown out 2)1184 items moved out of aisle and located under rack 3)Ladder located to another area

BEFORE 1)Cart located away from area that it is used in 2)No designated area to return cart to AFTER 1)Cart located in shipping and receiving area 2)Area for cart labeled and designated 3)Everybody knows where to look if they need the shipping cart

BeforeAfter

1)Consistent message all throughout the branch 2)Areas are labeled and marked off for ladder, hand truck, larger carts, and larger repair tools

A Kaizen doesn’t mean we need to do a Martha Stewart type of clean-up. Let’s look at one area to tackle and then move to the next and so on. Remember ….

Repair Benches 1)Start a 5S cultural with the repair techs 2)Organize, straighten, and clean-up bench 3)Get rid off unnecessary tools, clutter, and garbage

Before 1)Excess wrenches, drill tips, screwdrivers, chuck keys, and blades 2)Wrenches are stacked on top of each other 3)Bench top unorganized and left a mess at end of day 4)Computer screen and keyboard are taken up space on top of the repair bench 5)More o-ring picks and drill tips

AFTER 1)Clean and organized space on peg board 2)Color coded tools to know if someone else has one of this tech’s tools 3)Open space on top of repair bench so tech doesn’t have to repair larger tools and another bench 4)Only necessary tools that “this” tech needs to complete his repairs on a daily basis are on his bench 5)All tools are within reach 6)Layout of bench is functionally organized to “this” techs needs

Let me take some time to try and fish out a part that I might or might not have in my parts drawer. Now let me look in another parts drawer and then another. BEFORE

AFTER 1)Items is parts drawers were thrown out and drawers were cleaned 2)Using a parts tray to keep drawer organized 3)Slots are organized by item 4)Repair tech will be held accountable to keep parts drawer in order 5)Manager will add parts drawer to 5S checklist to let repair techs know that this area will be audited

Arbor Press Area 1)Clean and organize arbor press area 2)Brighten up area 3)Get rid of unused, duplicate, and unnecessary clutter

BEFORE 1)Broken press plates 2)Duplicate punches, press plates, and sleeves 3)Unorganized, don’t know what we have 4)No area to set tool down 5)No area for hammer, rubber mallet, or Teflon spray 6)Clutter under bench 7)Dark and glooming

Arbor Press Area After After a long night of hard work the Kaizen team was able to give the repair techs a clean, bright, new arbor press area to work in.

AFTER 1)Florence light along with peg board was installed to brighten up the area 2)All sleeves, punches, and press plates are labeled and organized 3)Only necessary items are in the arbor press area 4)Location for rubber mallet, hammer, and Teflon spray 5)Room to set tool down and get arbor press set-up 6)Area under arbor press is cleaned and clutter was thrown out

Testing and Common Tool Area 1)Have one area that all the employees go to for testing batteries and chargers 2)One bench where all the unique tools are located 3)One bench where all the “one of” tools are located

Common Tool Area 1)Space not used utilized effectively 2)No clear idea what this bench is used for 3)Dark and unorganized

This area needed some light and with the help from Rob “Sparky” Riggs we were able to shed light onto this bench.

Common Tool Area After 1)All unique tools are located on the common tool bench 2)All tools are labeled so anybody will know what is missing 3)If there is only one of the tools in the branch it is located on this bench. No need to search any of the other repair benches to try and find it 4)Got rid of broken, duplicate, and unused tools

Testing Area 1)Create a centralized area to test all batteries and chargers 2)Get rid of duplicate and bad chargers and batteries 3)Eliminate clutter and unnecessary items on bench

Testing Area Before 1)Not all batteries and chargers are represented here 2)Boxes on bench used as a catchall to hold unnecessary items 3)Old, burnt out batteries, and broken chargers 4)Clutter under, on top of, and over benches

Testing Area After 1)Only testing equipment on testing bench 2)Quality paperwork located on testing bench 3)Opened space on top of bench to hold larger tools without having to move any items 4)Ability to charge all batteries and test all chargers 5)All batteries and chargers have designated and labeled spots

Vidmars 1)Reduce waste 2)Eliminate clutter 3)Recoup space and dividers within Vidmars 4)Help with space constraints with Porter Cable & Delta branch integration

"The No. 1 cause of waste is the failure to recognize that it is there." To eliminate waste, we must put on a different set of glasses

Vidmars Before 1)Vidmar drawer used to store excess hand tools and accessories 2)Drawers used to store parts that are not in inventory along with old and used parts 3)Most Vidmar drawers are in numerical sequence, but a couple are in bin location 4)Spaces left in drawers for parts that might or might not ever come back in

Vidmars After 1)Went through six Vidmars and recouped space equivalent to 1 ½ Vidmars 2)Part numbers that had a reorder quantity of zero we took out the divider 3)We have more dividers to use when integration of Porter Cable and Delta parts are incorporated 4)Down the road will be able to recoup more space when Vidmars are put into bin locations

Areas for Opportunities After 1) Repair benches - Increase work area - Reduce waste of motion and time - Eliminate “clutter” in parts drawer - Improve productivity 2) Arbor press area - Clean and brighten area - Eliminate duplication, waste, and clutter - A place for everything and everything in its place 3)Testing and common tool area - Create ONE area to test batteries and chargers - Eliminate clutter, duplication, and unnecessary items - Eliminate the need to walk to all repair bench to look for the unique tool we have in the branch 4) Vidmars - Recapture wasted space - Eliminated drawers used as storage for hand tools and for old used parts storage - Recouped space from six Vidmars that is equal to 1 ½ Vidmars - Identified going forward the use of bin location throughout all the Vidmars 5) Start a 5S cultural at the branch - Designate and label area all throughout branch for hand truck, ladders, carts, large tool storage, 1184, and etc.. - Introduce and explained the value of 5S checklist

Mike Denison Gary Anderson Lafayette Gray Mario Lopez Suwit Thames Dave Stellmachowski Robert “Sparky” Riggs James Bingham Anita Beard-Rodgers Adam Past THANKS TO ALL THE EMPLOYEES FOR THEIR HELP ON THIS KAIZEN Not Pictured: Sean Kelly

Any Questions....