OPERATION AND MAINTENANCE PLAN FOR IMPLEMENTED MICRO- PROJECTS.

Slides:



Advertisements
Similar presentations
MONITORING OF SUBGRANTEES
Advertisements

INDEPENDENT WATER SCHEMES IN SAMOA
BASIC SERVICES Delivery & Challenges Ministry of Cooperatives and Rural Development.
Total Productive Maintenance
Water Integrity Forum, Delft June 5th 2013 Community Managed Project (CMP) approach: an opportunity to foster integrity in rural WaSH Experience from Ethiopia.
IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
Assessing Capacity Through Sanitary Surveys. SDWA §1420 Capacity Development ~To receive their full Drinking Water State Revolving Fund allotment, States.
Health and Safety Committees RENZO BERTOLINI Canadian Centre for Occupational Health and Safety.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Professional Behaviour
Healthcare Waste Management Programme
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Workplace Safety and Health Program
Quality Assurance/Quality Control Policy
Real Estate Principles and Practices Chapter 15 Property Management © 2014 OnCourse Learning.
1 FINANCING PRESSURES OF A DISTRICT MUNICIPALITY SALGA NATIONAL MEETING WITH MUNICIPAL MANAGERS 28 FEBRUARY 2011 Cacadu DM Municipal Manager Ted Pillay.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
Sustainability and Total Cost of Ownership Strategies for Higher Education.
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
Process Safety Management
© 2011 Michigan State University and United Nations Industrial Development Organization, original at CC-BY-SA Procedures FSKN.
1 SOMATHILAKA KINDELPITIYA COMMUNITY DEVELOPMENT AND TRAINING SPECIALIST SOMATHILAKA KINDELPITIYA COMMUNITY DEVELOPMENT AND TRAINING SPECIALIST.
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
Roles & Functions of the three levels of Rural Local Government in WATSAN Programme Arvind kumar REGIONAL WATSAN COORDINATOR B-TAST ( DFID- SWASTH)
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
Documenting the Participation of Fishing Vessel Crew Members in Alaska’s Commercial Fisheries Documenting the Participation of Fishing Vessel Crew Members.
SANILAB THE LOGICAL INDUSTRY CHOICE. SANILAB Industry edition Risk management is costly and stressing for production, quality and any other people of.
The Sanitation Team Business Model Water Services Trust Fund.
Monitoring, supervision and quality control IDSP training module for state and district surveillance officers Module 11.
Presentation on Preventive Maintenance
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
COMMENTS ON THE APPROPRIATION BILL 2011 STANDING COMMITTEE OF APPROPRIATIONS 13 A PRIL 2011 For an Equitable Sharing of National Revenue.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
ASA Board Membership Board Members: (vote) Four Paraguayan Citizens Four U.S. Citizens One Third-country National Ex-Officio Members: (voice but no vote)
Materi. Introduction There are two general types of maintenance : Reactive and Proactive Maintenance Reactive maintenance is performed in response to.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Life cycle services for automation products
District Leadership Training 2015 Trustees LaNita Battles, AINS Claims/Risk Manager – Dept. for Ministry Protection Florida Annual Conference.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Organizational Study of Inspectional Services City of Springfield, Massachusetts February 21, 2008.
Course of Study 5. Maintenance Management Assessing Maintenance Needs
Capital Reserves. What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs – Stormwater pond repair,
1 AN INTRODUCTION TO THE DEPARTMENT BUDGET MANAGEMENT REFORM OF CENTRAL GOVERNMENT Guifeng LIN Deputy Director-General, Department of Budget, Ministry.
Village of Almont WATER, SEWER, AND SSO RATES 2012 – 2013 FISCAL YEAR.
Financial Management and Budgeting The Details. What Is a Budget? A useful tool for keeping track of funds. A useful tool for keeping track of funds.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
FACILITIES MAINTENANCE PLANNING
Real Estate Principles and Practices Chapter 15 Property Management © 2010 by South-Western, Cengage Learning.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
Town of Oro Valley Oro Valley Stormwater Utility Commission Overview.
THEME: EMPOWERING FACILITY MANAGEMENT AND HEALTHCARE TECHNOLOGY IN KENYA TOPIC:MEDICAL EQUIPMENT MANAGEMENT DATE’13/11/2013 BY MILLICENT ALOOH.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Chapter 6 6 Maintenance C H A P T E R Brent Beggs.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
©2005 Prentice Hall Business Publishing, Auditing and Assurance Services 10/e, Arens/Elder/Beasley Internal Control and Control Risk Chapter 10.
PROJECT IMPLEMENTATION AND SUPERVISION. INTRODUCTION project planning usually seems to be a long process because implementation is the ultimate expectation.
Author name here for Edited books chapter 9 Facility Maintenance 9 chapter.
Safety Committee Formation
Starter Activity What kind of tasks or situations is an employer legally required to perform a risk assessment for? Use of any work equipment. Management.
The Design Team Carl James.
11 ii. Develop a plan for aDSM
Systems Implementation,
Objectives of the Training
SALGA Comments on LG Grants Division of Revenue Bill, 2011
Implementing Effective Energy O&M Strategies on a Limited Budget
WASH Objective 1: Affected people have safe and equitable access to a sufficient quantity of water for domestic needs, per sector's standards Indicator.
Public Schools Facilities Authority
Presentation transcript:

OPERATION AND MAINTENANCE PLAN FOR IMPLEMENTED MICRO- PROJECTS

INTRODUCTION In the past, during the facility design/build phases, it was uncommon to devote substantial resources to life-cycle Operation and Maintenance (O&M) concerns. However, it is now widely recognized that O&M represents the greatest expense in owning and operating a facility over its life cycle. The accuracy, relevancy, and timeliness of well- developed, user-friendly O&M manuals are increasingly recognized. Hence, it is becoming more common for detailed, facility-specific O&M manuals to be prepared prior to commissioning. The goal is to effectively and efficiently support the life cycle of the facility by eliminating unplanned shutdowns and realizing life-cycle cost savingssupport the life cyclelife-cycle cost

Essence of O&M Reduce capital repairs Reduce unscheduled shutdowns and repairs Extend equipment life, thereby extending facility life. Realize life-cycle cost savings, and Provide safe, functional systems and facilities that meet the design intent.

INSTITUTIONAL ROLES IN O & M COMMUNITIES: Enhance sustainability of all micro- projects. Decide on equitable fees to be saved in the dedicated account for the projects. Reactivate and train O & M sub- committees. LGAs: Ensure synergy with LGADPs. Posting of relevant and adequate number of staff. Make funds readily available for timely O & M. Facilitate appropriate departments to monitor maintenance of the projects. SA: Formally hand over micro-projects to LGAs. Create linkage with all relevant state and LG agencies: Min. of Education, Min. of health, Local Education Authority, REB, WATSAN, e.t.c. LINE MINISTRIES: Quality assurance of all micro-projects (electricity, water, quality materials for structures).

Content of a Good Maintenance Plan An effective maintenance plan should: educate the staff on the value of maintenance, and how a properly functioning facility can help them educate their communities; establish a budget for maintenance; describe how to hire qualified staff or contractors to perform tasks; develop a preventative maintenance plan, including schedules for periodic maintenance checks; use a work order system to track work orders, maintenance performed, and costs for each piece of equipment; ensure that the maintenance staff has proper Operation and Maintenance manuals; ensure availability of recommended spare parts in the warehouse; provide training to the maintenance staff.

Maintenance procedures Maintenance procedures are performed on a routine basis to ensure the equipment remains in peak operating condition. Examples of maintenance procedures are inspections, cleanings, lubrications, adjustments, replacements of components and calibrations. Maintenance procedures may initially be suggested by the equipment manufacturer/Service provider but may later be modified by the facility based on experience. A weak maintenance plan may not be acceptable as an affirmative defence in the case of a malfunction.

Micro-Project Components requiring Maintenances Pavement levels of culverts/ Stream Channels: drainage channels, cracking concrete /stone wall Building walls: crack and chipping paints. Building roof: rusting corrugated Iron sheets, roof leakages Equipment and Furniture: Faulty components and damages Ancillary Facilities: availability,maintenances, and pollution control

O&M Guidelines for specific Micro-Projects Micro- Project Operation And Maintenance Plans RequiredStrategiesPerson(s) Responsible Block of 3 Classrooms / Staff Quarters And Health Centre/ Staff Quarters - Provision of potable water -Provision of VIP Toilet, incinerators,waste baskets, wash hand basins etc -Posting of adequate staff -Provision of staff quarters -Beautification /protection of environment -Regular sanitation of school /health centre -Timely repairs and maintenance of structure - ensure increase in school enrolment. - payment of drug revolving fund. -training –for trained personnel, village health workers and/traditional birth attendants Collection of household levies, PTA support. Drug subsidy CPMC, Sub- committees, LGA/State govt

Project specific O&M guidelines Extension Of Electricity -Participatory supervision of cables and transformer’s sites. -Liaison with PHCN for regular payment of electricity bills and payment on metre rates. -Training of artisans on regular operation and maintenance to protect the transformer and associated facilities. construction of safeguard fencing and lock-up facilities to transformer housing, Collection user fees and payment of monthly dues Communities, CPMCs, Sub- committees

Guidelines contd---- ROADS AND CULVERT AND DRAINAGE CHANNELS Regular inspections, training of skilled artisan on simple maintenance, regular clearing of drainage channels, Collection of toll, other supports, CPMC, Sub- committees, LGA BOREHOLES Regular inspections, training of skilled artisan on simple maintenance cleanings, lubrication and adjustments of components when necessary, repair and replacements faulty parts,etc Collection of, user fees household levies, support, CPMC, Sub- committees, LGA MARKET STALLS AND COMMUNITY CENTRES provision of water, VIP Toilets, Incinerators, routine maintenance and cleaning of environment Collection of user fees, levies and philanthropi c supports CPMC, Sub- Committee, market supervision committee, LGA

How to get support for O&M House hold levies Development levies PTA Levies Drug revolving fund Community / fund raising Toll fee collection Subsidised user fee Community contribution

QUICK TASKS Identify and list the areas of your Micro-project that may need maintenance and the frequency of maintenance that may be required Using the format below, prepare a maintenance plan for your listed prioritized project S/NOMICRO- PROJECTOPERATION AND MAINTENANCE PLANS REQUIRED STRATEGIESRESPONSIBILITIES

CONCLUSION Sustainable design is an integral part of any facility management philosophy, and having an O&M manual provides a means to reduce operating costs through a comprehensive Maintenance Program, part of which includes the development of a Maintenance Plan (MP) that must be adopted.Sustainable designMaintenance Plan (MP)