EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement 312453 WP12 Management Report.

Slides:



Advertisements
Similar presentations
Introduction to EuCARD2 & WP4: Applications of Accelerators AccApplic  EuCARD2  WP4: Applications of Accelerators  The applications  Current workshops.
Advertisements

EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP5 XBEAM Steering Meeting.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
ICFA Beam Dynamics Panel Update and ABDW #49  ECLOUD`10 Mark Palmer Cornell University Laboratory for Elementary-Particle Physics.
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program.
Metal photocathodes for NCRF electron guns Sonal Mistry Loughborough University Supervisor: Michael Cropper (Loughborough University) Industrial Supervisor:
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Communication, Dissemination & Outreach TIARA-PP final meeting, Daresbury, 2013, November 25th C. Tanguy (CEA) 1.Website 2.Documentation database 3.Accelerating.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Communication.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP12: Innovative RF.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
PHIN JRA Status PHIN collaboration CARE SC meetingParis February 2004.
WP10.6 Advanced Photocathodes Developement DESYJacek Sekutowicz HZBThorsten Kamps HZDRJochen Teichert IOE MUTHenryk Fiedorowicz IPJRobert Nietubyć BNLJohn.
Low Emittance RF Gun Developments for PAL-XFEL
EuCARD Task 10.4 Sergio Calatroni. Sub-task New and improved techniques for the production of Nb sputtered Quarter Wave (QW) cavities (CERN, INFN-LNL)
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP2 Past & Planned activities.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Structure of the task 12.2 Claire Antoine Eucard2 WP12 DESY
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Task 12.4: SRF HOM Beam Diagnostics R.M. Jones, U. van Rienen, T. Flisgen, N. Baboi (UMAN, UROS, DESY)
EuCARD is co-funded by the European Commission within the Framework Programme 7 under Grant Agreement no Reach of NC and SC Technologies, 50 …
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Communication.
EuCARD is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, under Grant Agreement no Report.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP12 Innovative RF Technologies.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement An Introduction to EuCARD-2.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement R&D Perspectives in.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement European Network for.
JRA1 – SRF report CARE Steering Committee meeting,
1 R.M. Jones, Overview of SRF HOM Diagnostic Task, CEA, Saclay, April 16 th 2014 Nicoleta Baboi, Ursula van Rienen Roger M. Jones DESY, Univ. of Rostock,
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP5 “XBEAM”
Welcome! Rob Edgecock University of Huddersfield, UK  EuCARD2  WP4: Applications of Accelerators  This workshop  A few practical details EuCARD-2 is.
April 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE Paris April 2006.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement High Efficiency Work.
RF programme Review for the ESGARD Roadmap to EUCARD2 Peter McIntosh (STFC) Stephane Chel (CEA) Wolf-Dietrich Moeller (DESY)
FP7: EuCARD after a year of preparation… A.Jeremie.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 3rd Annual.
1 EuCARD2/WP 12.4, R.M. Jones, Cockcroft Inst., 23 rd November 2015 WP 12.4 HOM Diagnostics Roger M. Jones Contribution from Cockcroft Institute and The.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP12 Management Report.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Activity Report and Future Planning. European thematic work 2006 Main priorities: 1.Gather and analyze "good practice" and general information on operations.
Sub-Task HOM-BPM HOM based Beam Position Monitors – Planned and Extant Measurements N. Baboi, DESY, Hamburg EuCARD WP 10: SRF, Annual Review Meeting.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
11/19/ Third Meeting of the EuCARD Steering Committee 1 EuCARD Management Report J.P. Koutchouk, S. Stavrev for the Coordination Office.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
EuCARD-2 4th Annual Meeting Preparation Final Reporting
AMICI WP1 – Management, coordination and dissemination
CALIFES A proposed electron beam test facility at CERN
CompactLight H2020 Design Study Proposal
Thomas Schoerner-Sadenius DESY Hamburg, Germany
From EuCARD-2 to ARIES TIARA Meeting, Warsaw, 19 June 2017
UK-XFEL WP1 – Electron Injector Development
Roger M. Jones The University of Manchester and Cockcroft Inst.
WP12 Management Report & EuCARD-2 Updates
Accelerator Research and Innovation for European Science and Society
Report from WP2: Dissemination, Communication & Outreach (DCO)
Annual Report Instructions
WP12 Management Report & EuCARD-2 Updates
Task 2: High-gradient normal-conducting technology development
STFC Contributions to the FCC Study
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
WP2-DCO Dissemination, Communication & Outreach Month 3 Report
Presentation transcript:

EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP12 Management Report & EuCARD-2 Updates th April 2014 WP12 First Annual Review Meeting, CEA Saclay

WP12 Innovative RF Technologies This JRA focuses on the development of a range of technical solutions that has the potential to achieve significant performance increases in gradient, efficiency and beam quality of RF-based accelerator systems. Several novel techniques in the field of normal and superconducting RF technology have been selected, presenting the highest impact potential and with the additional benefit of profiting from exchanges and communication between these two distinct communities. Main R&D areas encompass: – SRF Thin Films – C Antoine (CEA Saclay); – High Gradient NC Cavities – W Wuensch (CERN) – SRF HOM Beam Diagnostics – R Jones (Manchester University) – RF Photocathodes – R Nietubyc (NCBJ) Reducing the footprint, machine energy consumption and overall cost of linear accelerators are of primary importance for all accelerators being developed today. High Risk  High Win!

WP12 Collaborative Team SRF Thin Films High Gradient NC SRF HOM Beam Diagnostic RF Photocathodes

WP12 Pushing the Envelope Beam Generation: – New photocathodes providing demonstration of highest beam intensities and smallest beam emittances. Acceleration: – Demonstration of the highest level of acceleration performance. Beam Diagnostics/Control: – Demonstration of high performance and low cost beam position diagnostic. Integrated and balanced programme encompassing high performance capabilities across both SC and NC technologies.

Fundamental Objectives 12.2Thin Films Exploitation of new superconducting materials, such as Nb 3 Sn and the development of new nano and multi-layer thin films, each anticipated to break new ground in the performance of SC accelerator cavities, with the potential of achieving gradients well beyond present Nb technology. 12.3High Gradient NC Cavities Development of an efficient NC structure capable of high gradient operation (Eacc > 100 MV/m) but free from dangerous wakefield contributions. 12.4SRF HOM Beam Diagnostics Development of electronics for utilising Higher Order Mode (HOM) signals from accelerating cavities for precision beam position diagnostics in high-energy electron linear accelerators, with the goal of reducing accelerator cost and length. 12.5RF Photocathodes Development of next generation advanced RF photocathodes, exploring revolutionary production techniques as lead deposition, diamond amplifier cathode and metallic photocathodes, enhancing the ability to reach fs response time, for more effective electron beam generation, capture and transport with high brightness and low intrinsic emittance.

Task 12.1 Management & Coordination The WP12 Task 12.1 management team: – Nicoleta Baboi (DESY) – Juliette Plouin (CEA) – Peter McIntosh (STFC) WP12 Steering Committee comprises above plus the 4 Task Leaders. Annual WP12 review meetings: – Alternating venues; CEA, DESY, STFC & CERN. – Each including a Task Leader SC meeting. – Approximately 1 month before each EUCARD-2 Annual Review.

WP12 Milestones MilestoneTitleBeneficiaryDateComments MS87Fundamental SRF Thin Film physics reportCEAM48Final Activity Report MS84Deposition test facility designed at CEA.CEAM40Facility designed and validated MS78Characterisation test facility implemented at HZBHZBM30Facility implemented and validated MS88 Report summarising the results obtained in characterising the various new thin film technologies developed, which include both multilayer and monolayer techniques CEAM48Final Activity Report MS81RF design CLIC_DDS_BUNIMANM36Activity Report. MS86RF design of fully interleaved structure and CLIC SW study.UNIMANM45Activity Report. Concluding final report MS76High power RF components fabricated and tested at low levelCEAM24Prototype completed and validated MS74Design concept RF front endPSIM12Activity Report MS77Phase stabilisation experiment designULANCM24Activity Report MS79Crab cavity electromagnetic designULANCM30Activity Report MS82Completed coupled cavity simulations of 8-cavity moduleUNIMANM36Activity Report MS80 Demonstrated operation of improved deposition system, Pb layers of 1 μm in thickness. NCBJM30Report on sample characterisation MS73Commissioning of the SAPI for operation with metal photocathodesSTFCM8Publication report MS75 Investigation of quantum yield and energy spectrum of the electrons, emitted from the metal photocathode surface in SAPI STFCM18Intermediate scientific report MS83 Manufacturing and commissioning of the photocathode transport system STFCM36Technical design report MS85 Investigation of the brightness of different metal photocathodes in a S-band NCRF gun STFCM42Scientific report Task 12.2 Task 12.3 Task 12.4 Task 12.5

WP12 Deliverables DeliverableTitleBeneficiaryDateComments D12.1 Deposition test facilities implemented and verified at CERN and INPG. CERNM18Report D12.5First resonator deposited and qualified at CERN.CERNM36Report D12.10Cavity deposited and qualified at CEA.CEAM48Report D12.2Initial progress report of task 12.3.CERNM18Report D12.6Intermediate progress report of task 12.3.CERNM36Report D12.11Final report of task 12.3.CERNM48Report D12.3Design of electronics for XFEL HOM diagnostics.DESYM18Report D12.7 Completed characterisation of HOMs in the 8-cavity XFEL 3HC module. UNIMANM36Report D12.12 Report on characterisation of HOMs in XFEL coupled 3HC cryomodule. UNIMANM48Report D12.4 Scientific report on photocathode R&D.STFCM18Report D12.8 Optimised procedure for microdorplets flattening with an UV laser. NCBJM36Report D12.9 Pb/Nb plug photocathodes measurements and characterization. HZDRM42Report D12.13Results of DAC implementation in SRF guns.HZBM48Report Task 12.2 Task 12.3 Task 12.4 Task 12.5

Deliverable Approval Process EuCARD-2: 62 deliverables and 94 milestones to review and approve. Huge task, needs to be well organised. Milestones: approved by WP Coordinator and Coordinator Deliverables: approved by Steering Committee and Coordinator after a WP review process. 2 months before deadlineProject Assistant send reminder to Responsible (with copy to WP Coordinator and Project Coordinator) 1 month before deadlineReport sent to WP Coordinator for comments. Between 30 and 20 days before deadline Start Review phase WP Coordinator or Author send Report to Project Assistant who enters report in EDMS and notifies the Reviewers: Coordinator, WP Coordinator, one selected member of SC. Comments entered in EDMS 10 days before deadline Start Approval phase Author enters comments and corrections and submits a final version. All SC is notified and can give comments or approve/reject the report. The Coordinator gives final approval At deadlineThe Deliverable Report is sent to EU Project Officer.

1 st Annual Report - URGENT Deadlines: Advised start of writing 1 April 2014 Advised input from Task Leaders to WP Coordinators~ 1 May 2014 Input from WP Coordinators to Project CoordinatorSunday 18 May 2014 Draft completed, submitted to Steering CommitteeY+3030 May 2014 Draft approved and available on web site Y+6030 June 2014 Size: Inputs from Task Leaders: 1 or 2 pages, including 1 or 2 pictures, graphs, tables. Inputs from WP coordinators: input from Tasks (between 8 and 12 pages) plus an introductory summary. Templates available at:

EUCARD-2 Annual Review May DESY Encourage all WP12 collaborators to attend. On Tuesday 20 th May: – WP12 Report by P McIntosh. – WP12 Highlight talk on: HOM-based Beam Diagnostics: from FLASH to the European XFEL, by N Baboi (DESY). On Wednesday 21 st May: – Parallel WP12 session (3-hour). – Utilisation to be determined with SC this week.

WP12 Publications AuthorTitleLink C.B. Baumier (IPNO) Task 12.2 Multilayers Activities at Saclay / OrsaySRF s/weioc02.pdf M Dehler (PSI) Task 12.3 Wake field monitors in a multi purpose X Band accelerating structure IBIC13: nf/IBIC2013/papers/webl3.pdf T Flisgen (UROS) Task 12.4 Scattering parameters of the 3.9 GHz accelerating module in a free-electron laser linac: A rigorous comparison between simulations and measurements Phys. Rev. ST Accel. Beams 17, (2014) R. Barday (HZB) Task 12.5 Characterization of a superconducting Pb photocathode in a superconducting rf photoinjector cavity Phys. Rev. ST Accel. Beams 16, – Published 6 December 2013 Every publication needs to be uploaded into CDMS CERN) by the management team. Please ensure we’re informed of all WP12 publications generated!

SharePoint Pages Contact lists Document sharing (templates, drafts, presentations, project documents, meeting minutes) List of actions / to do lists / prepare events Collaborative calendar (synchronised with Outlook calendar) Image/photo libraries Discussion forums SharePoint Workspace

WP12 Sharepoint Site Note: Need to have a CERN NICE account – follow instructions!

Accelerating News Newsletter Issue 9 published EuCARD-2 related stories in this issue: – Launching video – Explore accelerator applications (WP4) – FCC kick-off (sponsored by WP5) – A step towards Next Generation Magnets (WP10 ) 1315 subscribers! Survey results (overall rating 4.6/5) Planned stories for June 2014 – Report on Annual event – WP12 suggestions? In past issues: WP3 WP5 WP12 WP13 Task 12.2 Performance breakthrough for SRF thin film, utilising multi-layer, high Tc technologies. Task 12.3 Breakdown free performance capability demonstrated for >100MV/m NC RF structures. Task 12.4 High performance beam position diagnostic demonstrated for XFEL. Task 12.5 High performance (intensity, emittance) photocathodes demonstrated for SRF and NC applications.

Monographs 6 published so far, incl. EuCARD final report: WP12 Topics?!?!?

WP12 Website WP12 website can be found here:

WP12 Annual Review Organisation: Review hosted at: Group photograph during morning coffee break today. Review dinner this evening at ‘Au port du salut’ at 19:30 Laboratory tour: 09:00 – 10:30 tomorrow. Many thanks: To the CEA organising committee: – particularly Juliette Plouin and Catherine Desailly-Guyard To all WP12 task leaders Looking forward to a successful first WP12 review!

Tour Meeting Location