Materials Handling Knowledge Sharing Session

Slides:



Advertisements
Similar presentations
SAP WM.
Advertisements

Master Data for SCM (1) Master Data for Demand Planning & Fulfillment Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
PM Refurbishment Orders for Material Repairs
The Production Process
Process Management and Control and Physical Inventory SAP Implementation
WM Organizational Structure, Master Data, Process Management and Control, and Physical Inventory SAP Implementation.
MATERIALS STAGING AND TRACKING Session 3605 Gary Zien Bayer Corporation Pittsburgh PA.
Parts Disposition on Service Orders - a custom solution Pieter de Bruyn Session: 4005.
SAP on Handheld Challenges in Implementing WM with RF Praveer Punera Varian Medical Systems, Inc. May 20, 2003.
HTW Berlin FB3, International Business, 4. Semester Seminar Teaching SoSe 2010 Information Management II Warehouse Management and Inventory Dr. Irina Stobbe.
Map Your IM Storage Locations and WM Warehouses the Right Way
Inventory and Warehouse Management Process
Microsoft Dynamics AX Technical Conference 2013
University of Southern California Enterprise Wide Information Systems The Procurement Process Instructor: Richard W. Vawter.
SAP R/3 Materials Management Module
Module 10 Setup for Production.
Procurement Processes SAP Implementation
Procurement Processes EGN 5620 Enterprise Systems Configuration Fall, 2012 Procurement Processes EGN 5620 Enterprise Systems Configuration Fall, 2012.
Production Logistics and ERP
Production Planning Processes Theories & Concepts
SAP Supplier Management EIN 5346, Logistics Engineering Spring 2010.
Istanbul Kultur University Enterprise Wide Information Systems The Procurement Process.
Production Planning Processes EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2012.
University of Southern California Enterprise Wide Information Systems Manufacturing Planning and Execution (cont.) Instructor: Richard W. Vawter.
HTW Berlin FB3, International Business, 4. Semester Seminar Teaching SoSe 2010 Information Management II Warehousemanagement and Inventory Dr. Irina Stobbe.
Template v5 October 12, Copyright © Infor. All Rights Reserved. 1 Warehouse Mobility for LN An Overview Swaroop Patnaik, Infor.
Introduction SAP Manufacturing Execution (ME) Dr. Djamal Ziani King Saud University.
Warehouse Management (WM)
Production Planning Processes EGN 5620 Enterprise Systems Configuration Spring, 2014.
Materials Management (MM) Organizational Structure EGN 5620 Enterprise Systems Configuration Fall, 2015.
Sinha and Kotzab: Supply Chain Management, Copyright © 2012 by Tata McGraw-Hill Education CHAPTER 8 Production Planning and Scheduling.
© SAP AG Production Planning and Execution (PP) SAP University Alliances Version 2.1 Authors Bret Wagner Stefan Weidner Product SAP ERP 6.0 EhP4 Global.
SAP ECC 6.0 Procurement Process
Materials Management (MM) Organizational Structure EGN 5620 Enterprise Systems Configuration Spring, 2015.
Template v5 October 12, Copyright © Infor. All Rights Reserved. 1 Warehouse Mobility for LN - Other Transactions Swaroop Patnaik,
Production Planning Processes EGN 5620 Enterprise Systems Configuration Fall, 2015.
Transportation Planning EIN 5346 Enterprise Systems Optimization Fall, 2015.
Bensberg GmbHInternal Delivery Performance. Bensberg GmbHInternal Delivery Performance Bensberg components  EDI  DELINS  Splitting EDI  External Service.
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
SAP EWM (Extended warehouse management) online training SAP EWM (Extended warehouse management) online training CONTACT US: Call: , ,
Materials Management (MM) Organizational Structure EGS 5620 Enterprise Systems Configuration Spring, 2016.
SAP WM ONLINE TRAINING Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA
Materials Management (MM) Organizational Structure EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2013.
 TATA CONSULTANCY SERVICES MM - PURCHASING.  TATA CONSULTANCY SERVICES Target Group Purchase department.
WM Organizational Structure, Master Data, Process Management and Control, and Physical Inventory SAP Implementation.
MRP (Material Requirement Planning) The main function of material requirements planning is to ensure material availability on time. MRP helps monitor the.
 TATA CONSULTANCY SERVICES MATERIALS MANAGEMENT.
Page 1 SAP EWM ONLINE TRAINING AUSTRALIA Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA.
 Tata Consultancy Services CONTENTS PRODUCTION ORDERS METHODS OF CREATING PRODUCTION ORDERS Results of creation and release of production order. Production.
Template v7 January 30, Copyright © Infor. All Rights Reserved. Infor Confidential Copyright © Infor. All Rights Reserved.
CONTACT US: Call: , , Mail: Visit:
SAP WM ONLINE TRAINING Contact our Support Team : SOFTNSOL India: Skype id : softnsoltrainings id:
 TATA CONSULTANCY SERVICES MM - Inventory management.
Chapter 22 Procurement Cycle and Documents
Warehouse Management System
WM Organizational Structure, Master Data, Process Management and Control, and Physical Inventory SAP Implementation.
SAP EWM/WM ONLINE TRAINING
SAP SCM ONLINE TRAINING
Dynamics GP Manufacturing
Warehouse Management.
Pratik Ghosh Asst. Professor( FMS) NIFT Bengaluru
The Production Process
SAP EWM (Extended warehouse management) online training
SAP EWM Staging Area & Transaction Unit Call / WhatsApp :
Production Planning Processes SAP Implementation EGN Enterprise Systems Configuration
Presentation transcript:

Materials Handling Knowledge Sharing Session WM and PP Interface Materials Handling Knowledge Sharing Session

Overview Mapping of the Internal Procurement process with WM-PP Interface Customizing settings for using WM-PP Interface Backflushing Control Cycles PSA determination during Production |

Staging without the WM-PP interface When we don’t use the WM-PP interface the Work order or the process order generates a GI posting which in turn generates a TR in an interim storage area i.e. the Goods issue area. The goods are then finally removed when a TO is generated and the confirmation of the TO completes the staging process. IM Movement type 261 occurs in the start which is then mapped to WM movement type 261. A TR is alsp generated for this WM Movement Type The material is then mapped as negative quants in the interim storage area i.e. 914 (“GI Area for production”) which is cleared in the end. |

Process Flow with WM-PP Interface Has to be activated at Warehouse level. Request is through LP10, LP11 or LP12 The WM movement type 319 and 349 (replenishment for production) controls the process. Picked material is put in PSA storage type (100 in Std SAP) IM posting in the end reduces both the Storage Location stocks and the Warehouse stocks. Hence, 2 TRs are required – 1. Warehouse to PSA Storage Type ( WM Movt Type 319/349) and 2. PSA Storage Type to 914.(Movement Type 261) The process flow is reversed in this case. In the first step a request is generated using special transactions (LP10 for order related staging, LP11 for Non order related staging (Crate Parts) and LP12 (Release Order Parts) for cross order) either in a separate step or via the work order itself to create a TR which is converted into a TO. This involves the staging of the material to a separate interim storage type known as the “production supply”. Finally the Goods Issue happens which completes the staging process. In other words when PP-PI is active, 2 TRs are required – one to move the material from the main Warehouse to PSA Storage Type ( WM Movt Type 319/349) and the second tp move the material from PSA Storage Type to 914. |

Overdeliveries Allowed Requirement Type P i.e. Production Supply Movement Type 319 Overdeliveries Allowed Requirement Type P i.e. Production Supply |

No Over-Deliveries, hence Exact Quantity Movement Type 349 No Over-Deliveries, hence Exact Quantity |

Movement Type 261 Destination storage type is 914 and Storage Bin is Dynamic i.e. the Process Order No TR is automatically generated from setting in table V_T321 |

Customizing Settings for using WM-PP Interface |

Customizing Settings for using WM-PP Interface |

Activate at Warehouse Level |

Movement Type and Storage Type Definition Storage Type : 142 & 147 are linked to Movement Type 349 which is for exact Qty Staging. Other PSA Storage Types allow overdeliveries |

Production Scheduling Profile We can control staging via the WM-PP interface. |

Advantage of using the WM-IM Interface Backflushing of components is possible Staging of materials can be fine tuned using Control Cycles. Order based staging can be directly done, and changes can be automatically adjusted. Production Declaration Putaway for finished products from production is controlled by WM movement type 103(“GR production order”) and works in the same way as other GRs. |

Backflushing - Prerequisites Each material component is assigned to an operation in the production order. If a material component is backflushed, the system posts the withdrawal only upon confirmation of the operation. The withdrawal is then posted automatically. GI posting only when production process is complete with the confirmation of the work order. 1. Material Master setting 2. Setting in the Work Order 3. Setting in the master recipe |

Material Master view |

In Process Order |

Specifies How and Where the materials are staged from a warehouse Control Cycles Specifies How and Where the materials are staged from a warehouse Material Staging Indicator – To specify the type of staging Indicator 1 (Pick Part) Indicator 2 (Crate Part) Indicator 3 (Release order part) Indicator 4 (Manual staging) PICK PARTS – Material is staged with relation to an order. The system request the exact amount specified in the work order. Pick parts are staged in dynamic storage bins because of the relation with the order. Hence the document number of the order forms the storage bin coordinates. Control cycles can be created for specific material. Also we can have a material independent control cycle which is valid for all the materials not assigned to a control cycle. CRATE PARTS – staged in consistent quantities independent of the order. It is based on the PP-KANBAN processing. In the control cycles we specify the number of containers that are to be normally removed and the quantity in them. RELEASE ORDER PARTS – Staging is done for multiple orders. The system checks how many release orders require the material and in what quantity and creates the TR for the total quantity. MANUAL STAGING – The TO is created without a TR. The consumption posting reduces the stock of the production storage type given in the Control Cycle. |

Control Cycles |

Display: Transaction LS41 Control Cycles Material Independent Control Cycle Display: Transaction LS41 |

Control Cycle |

A Operations B Inputs BOM C 1 2 Work Centre PSA 3 PSA Work Centre PSA Determination A Operations Inputs B BOM C 1 2 Work Centre PSA 3 Work Centre PSA Basic Data View |

Movement Type Determination Material Control Cycle Plant Storage Type PSA Material Staging Indicator Movement Type TR and TO |

Thank You !!!!! |