ΑΝΝΕΧ 10 by EK. Rail Operators‘ Group (1) 1.Background F-Man Cargo operators: FS, CP, SZ. Their responsibilities: - to define their needs for a F-Man.

Slides:



Advertisements
Similar presentations
GEOSS ADC Architecture Workshop Break-out summaries: Initial Operating Capability (IOC) Doug Nebert U.S. Geological Survey February 5,
Advertisements

Log System Spec 1 Logical Systems Specification Module Two stages in the module – Stage 4 - Technical Systems Options – Stage 5 - Logical Design Performed.
1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) iCargo 1st Review Meeting Brussels 5/12/12 Technical.
PERFORMER WP2 INTRODUCTION 13th of September 2013 CSTB Sophia Antipolis, France.
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
UGDIE PROJECT MEETING Athens September WP6 – Assessment and Evaluation  Evaluation Results  Deliverable D 13 (first release issued and delivered.
OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS WP5: “Integration and Usability validation of models”
Rail Review 14 September 2001 RCM Tools Developed for the RAIL project Project web Page: Jesus Carretero:
WP3- Development: Milestone M3 Lisbon 30 January 2004 National Technical University of Athens.
EURIDICE project Evaluation of image database use in online learning environment 11/
1 F - MAN Pool - Concept - Dipl.-Ing. Eckhard Kuhla Project Manager EKonsult GmbH
Figure 6-1: Transport Request Data Entities: CS: Customer OM: Order manager OPM: Operational manager FM: Fleet Manager MM: Maintenance manager OBT: On.
ΑΝΝΕΧ 6 by SCIRO. WP5 Testing and Verification Objectives To verify that the prototypes fulfil the functional specification set in WP2 To produce possible.
1 F - MAN Pool - Concept - Dipl.-Ing. Eckhard Kuhla Project Manager EKonsult GmbH
03/12/2001 © Bennett, McRobb and Farmer Avoiding the Problems Based on Chapter 3 of Bennett, McRobb and Farmer: Object Oriented Systems Analysis.
ΑΝΝΕΧ 11-A by SCIRO. WP7 Dissemination and Implementation The objectives are the following: to build consensus around F-MAN To set-up the basis for further.
Crete Meeting April 10 th – 11 st, 2003 WP3 Sciro Presentation.
Information Systems Development Lecture 2: the idea of the Life Cycle.
UGDIE PROJECT MEETING Bled September WP6 – Assessment and Evaluation Evaluation Planning  Draft Evaluation plan.
UGDIE KICK-OFF MEETING F-MAN 1 ΑΝΝΕΧ 1-A by UGDIE.
ΑΝΝΕΧ 3 by SCIRO. Task 2.1 – Functional requirements definition Task 2.1 aims at drawing the functional analysis of F-MAN, starting from the users’ needs.
Kranjska Gora, Test plan - PI will test F-MAN tools on: - 2 types of wagons (Uacs, Himrrs) - 2 types of operation (timetable supervision.
Octopus F-MAN FM OPM OM Standards and Norms Environment MM Wagons F2 F1 F3 Contractual data Wagons owner F4 F5 F6 F9 F7 F8 F10 F11 F12.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
CORE 1: PROJECT MANAGEMENT Understanding the Problem.
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
European Commission DGXIII-IST - 1 European Commission - DG Information Society KEY Action 1: Systems and Services for the Citizen Objectives: Foster the.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 Plan 1 st period Inova+
European Railway Energy Settlement System (ERESS) - ”Building common European solutions” UIC Energy Efficiency Conference 2009.
Introduction to Information System Development.
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
The Preparatory Phase Proposal a first draft to be discussed.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
Presentation by SNCF in 19/20 April 2004 Meeting in Kranjska.
WP7 - Architecture and implementation plan Objectives o Integrating the legal, governance and financial plans with technological implementation through.
EPOS-PP Work Package 3 Governance John Ludden British Geological Survey/NERC U.K.
10 Software Architecture CSCU 411 Software Engineering.
TESTBED FOR FUTURE INTERNET SERVICES TEFIS at the EU-Canada Future Internet Workshop, March Annika Sällström – Botnia Living Lab at Centre for.
MODA-TEL An IST project on Model Driven Architectures for Telecommunications System Development and Operation.
Project Methodology May 2, System Development Life Cycle Overview.
P.O. Box AL Maastricht The Netherlands RIKSDeSurvey AGM2 - Vasto, Italy, 4-7 April 2006 DeSurvey Module 1.8 ‘Integration towards a.
Request for Proposal (RFP)
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
FASR Software Considerations Gordon Hurford SSL AUI – August 2007.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 – Dissemination, Exploitation Strategy and Standardization Inova+ Co-Living.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
SAFESPOT Project Kick off Meeting February 16 th and 17 th 2006 Rome 1 Integrated Project Co-operative Systems for Road Safety “Smart Vehicles on Smart.
Lecture 13.  Failure mode: when team understands requirements but is unable to meet them.  To ensure that you are building the right system Continually.
© Bennett, McRobb and Farmer 2005
G.Govi CERN/IT-DB 1 September 26, 2003 POOL Integration, Testing and Release Procedure Integration  Packages structure  External dependencies  Configuration.
EMI INFSO-RI SA1 Session Report Francesco Giacomini (INFN) EMI Kick-off Meeting CERN, May 2010.
Overview of Socio-cognitive Engineering General requirements Theory of Use Design Concept Contextual Studies Task model Design space System specification.
V-Shaped Software Development Life Cycle Model. Introduction: Variation of water fall model. Same sequence structure as water fall model. Strong emphasis.
Paul Alexander1 DS3 Deliverable Status 4 th SKADS Workshop, Lisbon, 2-3 October 2008 DS3 Deliverables Review.
BHL-Europe Biodiversity Heritage Library for Europe – ECP-2008-DILI – Kick-off meeting – Berlin – May 2009www.biodiversitylibrary.org Biodiversity.
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
Frank Schipplick Work Package Coordinator WP1 - eSignatures.
Work Package 2 TECHNOLOGICAL HARMONISATION Reporting period
WP6 Pilot Set-up, Model Calibration and Assessment
Software Requirements
Request for Proposal (RFP)
Engineering Agent Systems for Decision Support
Engineering Processes
Fundamentals of Human Computer Interaction (HCI)
LOSD Publication Deirdre Lee
Project Phases ‘98 ‘00 ‘02 ‘04 ‘06 Preparatory Phase
Measurement 2 Measurement 3 Condition Monitoring Integration with Embedded Software and On Key Hardware’s embedded software/analysis tool and specialist.
ESSNet SERV 2 Implementing Shared SERVices
Presentation transcript:

ΑΝΝΕΧ 10 by EK

Rail Operators‘ Group (1) 1.Background F-Man Cargo operators: FS, CP, SZ. Their responsibilities: - to define their needs for a F-Man tool set - to care for the OBT-installation - to test the F-Man prototype in real European operation, and - to evaluate the results vs their pre-defined needs Idea of the consortium: to enlarge the validation platform for the 2.F-Man Products Software modules (operating in an open, stand alone mode) - Functional requirements for a fleet management - The relevant Event Messages Package (EMP) - The Data Processing and Distribution (DPD)-module - The ETA-module - The F-Man Pool (FMP) module - The Status Oriented Maintenance (SOM)-module - The Decision Support (DSUP)-module Hardware area: - Power management and - Wagon status sensors

Rail Operators‘ Group (2) 3.Role of the RUG 3.1 Generally - ensure acceptance in the rail cargo world - assist the project in the validation process 3.2 F-Man and UIC - Demonstration to UIC the openess, the importance of the project and the “pay back-effects“ of a participation - Assisting UIC in defining / preparing standards: the interface: OBT messages / national wagon management software ETA messages ( interface between Infrastructure Managers and operators) Internet access to a wagon pool management An UIC-Leaflet on Status Oriented Maintenace 3.3 Problems - Providing F-Man infos (Deliverables etc.) to the group - Fleet Management: a competitive issue!! - Wagon management software: Legacy systems !

ROG: Action Plan (1) 1.Tasks (see FM 0): - Input to the Users Needs (WP1) - Follow up the development activities (WP 2-4) - Validate the verification phase (WP 5) + Participation in the test planning Optional: + Integration of own GPS-Wagons + Evaluation the results in their own operation centres - Recommendations to the UIC, concerning + standards + relevant informations - Organising workshops