Beam losses on ISIS and induced radioactivity from MICE David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC.

Slides:



Advertisements
Similar presentations
Machine Physics at ISIS Proton Meeting 24 th March 11 Dean Adams (On behalf of ISIS Accelerator Groups)
Advertisements

Front end test stand — WP2
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
ISIS Accelerator Division
Ottone Caretta & Chris Densham Technology Business Unit Rutherford Appleton Laboratory A new idea for NuFact targets and beam dumps BENE Nov 06 – Frascati,
Current Status of Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda,
MICE TARGET OPERATION C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England.
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
Particle-Driven Plasma Wakefield Acceleration James Holloway University College London, London, UK PhD Supervisors: Professor Matthew wing University College.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
ISIS Related Issues for MICE Adam Dobbs Proton Accelerator Development Meeting, RAL 24 th March /03/20111A. Dobbs.
A Neutrino Factory Target Station Design based on Solid Targets J. R. J. Bennett STFC, Rutherford Appleton Laboratory, Harwell Science.
Solid Targets for the Neutrino Factory J R J Bennett Rutherford Appleton Laboratory, Chilton, Didcot, Oxon, OX11 0QX, UK
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
Muon Collider 2011 Workshop Jun 27-July 1 in Telluride, CO Gollwitzer & Nagaitsev presented Attending: Ankenbrandt, Lebedev, Pasquinelli, Popovic, and.
On MICE Coordinate System Yury Ivanyushenkov RAL.
Kirk McDonald Monday, 28th May Report of the International Working Group on Muon Beamlines Bruno Autin, Roberto Cappi, Rob Edgecock, Kirk McDonald,
M.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ M. Apollonio – MICE Operations Manager University of Oxford MICE beam line commissioning.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
ISIS Beam Protection System and MICE operation. Dean Adams 29 Nov 07 Presented by Chris Rogers.
Harold G. Kirk Brookhaven National Laboratory Meson Production Calculations 1 st Princeton/Oxford High-Power Targets Workshop Oxford May 1-2, 2008.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
FETS-HIPSTER (Front End Test Stand – High Intensity Proton Source for Testing Effects of Radiation) Proposal for a new high-intensity proton irradiation.
ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October.
J-PARC: Where is it? J-PARC (Japan Proton Accelerator Research Complex) Tokai, Japan 50 GeV Synchrotron (15  A) 400 MeV Linac (350m) 3 GeV Synchrotron.
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
S.J. Brooks RAL, Chilton, OX11 0QX, UK Options for a Multi-GeV Ring Ramping field synchrotron provides fixed tunes and small.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Proton Driver Status ISIS Accelerator Division John Thomason.
Operational experience with high beam powers at ISIS David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ICFA HB2008,
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
ISIS upgrades David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC Proton Accelerators for Science and Innovation,
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
Harold G. Kirk Brookhaven National Laboratory Target Considerations for Nufact and Superbeams ISS Meeting RAL April 26, 2006.
‘Dude where's my muon?’ Trigger Efficiency of the Single Station. Edward Overton 1.
ISIS operational update David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC DL-RAL Joint Accelerator Workshop, RAL.
Managed by UT-Battelle for the Department of Energy Analysis of 2008 Beam Instability Data S. Cousineau, V. Danilov, M. Plum HB2008.
Challenges of Dual Harmonic RF Systems ISIS Synchrotron Group John Thomason.
“Beam Losses” Christian Carli PSB H - Injection Review, 9 th November 2011 Several topics more or less related to beam losses, a study still somewhat at.
1 Beam and Target Issues Chris Booth 5 th May 2004.
RAL Muon Beam Line Properties. ISIS 70 MeV H- injection Ring accelerates up to 800 MeV in about 10 ms 50 Hz cycle - Dual Harmonic System ~ 2 x 1.5 MHz;
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
ISIS Upgrade Modelling Dean Adams On behalf of STFC/ISIS C Warsop, B Jones, B Pine, R Williamson, H Smith, M Hughes, A McFarland, A Seville, I Gardner,
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Valery Telnov Budker INP, Novosibirsk IWLC2010, CERN October 21, 2010 A FEL pumped solid state laser system for the photon collider at CLIC.
The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department Rutherford Appleton Laboratory HIPPI-05, Cosener’s.
CARE08 Dec 2008Jean-Sebastien GraulichSlide 1 MICE, a facility for precision beams and muon cooling o MICE in EuCARD o MICE Facility: Beam, Infrastructure.
The ISIS Facility John Thomason Synchrotron Group Leader ISIS Department Rutherford Appleton Laboratory / STFC (With thanks to David Findlay) Fermilab,
Operational experience with high power proton beams David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ADSR.
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS ORBIS TERRARVM RAL Front End Test Stand — Context David Findlay Accelerator Division ISIS Department Rutherford.
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI ISIS Developments David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory.
First Line Diagnosis FLD Julian Brower CEng FIET Section Leader ISIS Accelerator Performance Improvement.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Ionisation Cooling Test.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
FLDt First Line Diagnosis tool ‘The fault analysis tool for the ISIS Accelerator’ Update Oct 2014 WAO Mainz Julian Brower CEng FIET Section Leader ISIS.
ISIS operational update
UK Neutrino Factory Conceptual Design
Challenges of Dual Harmonic RF Systems
Radiation protection of Linac4 M. Silari Radiation Protection Group
Report on EUCARD WP6: MICE Transnational Access (TA)
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI
K. Tilley, ISIS, Rutherford Appleton Laboratory, UK Introduction
Presentation transcript:

Beam losses on ISIS and induced radioactivity from MICE David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC MICE target review, RAL, 17 September 2010

70 MeV H – linac 800 MeV proton synchrotron TS-1

Collector straight MICE target

4 Operating ISIS Beam losses Concentrated at one place — on collectors Imperative to keep beam losses low (~1 W/m) ISIS: ~1 kW lost, 163 m circumference, ~6 W/m — activity would be worse at higher energies ISIS only ~0.2 MW, but ×2 beam losses would make life impossible (3 mSv annual dose limit) UK legal limit: 20 mSv/year RAL formal investigation level: 6 mSv/year ISIS limit: 3 mSv/year

BLMs in grey trunking

~0 V-ms 1.6 V-ms R8BLM1 (V-ms) 2.8 V-ms5 V-ms

Without MICE, sum BLMs = 1.6 V-ms At 1 target dip per second for R8BLM1 = 5 V-ms Average sum BLMs = (49 × ) ÷ 50 = 2.7 V-ms 69% greater — not tolerable R8BLM1 Sum BLMs 0 V-ms 1.6 V-ms 1.6 V-ms 20.3 V-ms 2.8 V-ms 30.6 V-ms 5.0 V-ms 57.0 V-ms

Typical contact dose rates around synchrotron — average ~2 mSv/h (On average, dose rates proportional to (days cooling) –0.25 ) Straight 1 — too active for routine measurement

“Activation runs” ~12 hours continuous running Measure dose rates around Straight 7 before and after Example:

10 R8BLM1After ÷ before around Straight 7 (excluding target itself) Mean St. dev.St. error 1 V-ms12 & 13 Sep V-ms10 & 11 Feb V-ms19 & 20 Jun (these surveys done at the beginnings of cycles) Does rates around Straight 7 measured 16 Aug 10, ~1–2 days after end of Cycle 2010/02 with more intense MICE running régime 16 Aug 10 ÷ 20 Jun But 16 Aug and 20 Jun not really comparable — after and before cycle respectively

Pattern of induced activity after end of Cycle 2010/02 with more intense MICE running régime cf. previous cycles? No obvious MICE-induced activity yet But long way to go with muon rates — Cycle 2010/02 ~1 dip every 15 s, and R8BLM1 at only ~2 V ~0.0 V R8BLM1 2.8 V

12 Way(s) forward ? [from Dec target review] Dean’s bump Create vertical bump (R0VD1, R5VD1, R7VD1, R9VD1) Ramp up over 8–9 ms, maintain over 9–10 ms 6 mm achieved so far 10 mm vertical bump at MICE target should be possible with new trim quad. PSUs (higher currents and higher slew rates) Different target configurations and/or materials E.g. pion production cf. multiple scattering Beam dynamics modelling ?

13

15 Synchrotron:800 MeV proton, 50 Hz 5 µC each acceleration cycle Targets:W (Ta coated) Protons: 2 × ~100 ns pulses, ~300 ns apart Moderators:TS-1: 2 × H 2 O, 1 × liq. CH 4, 1 × liq. H 2 TS-2: 1 × liq. H 2 / solid CH 4, 1 × solid CH 4 Instruments:TS-1: 20TS-2: 7 ~330 permanent staff, ~£35M/year budget ~750 experiments, ~1500 users, ~5000 user-visits per year World-leading

Superperiods 9, 0 and 1 of the ISIS 800 MeV synchrotron

Long mechanical drives to reduce need to work close to high-radiation locations (e.g. when changing motor drives for beam collectors)

Vertical and horizontal collectors in Straight 1, looking downstreamand upstream