BROWNFIELDS 2005 Dealing with Unexpected Contamination Lowry Air Force Base Redevelopment Denver, CO Tom Markham, Executive Director, Lowry Redevelopment.

Slides:



Advertisements
Similar presentations
CASE STUDIES Client:Developer of former Manufactured Gas Utility Plant Property Problem:Developer bought contaminated former plant site to develop for.
Advertisements

1 Midland Community Meeting Michigan Department of Environmental Quality Steven Chester, Director Jim Sygo, Deputy Director.
Vapor Intrusion. What is Vapor Intrusion? The migration of volatile chemical vapors from the subsurface to overlying buildings.
BoRit Superfund Site Timeline
Environmental Protection Commission Overview Vision: Environmental Excellence in a Changing World.
The Basics About Getting Involved with Contaminated Sites February 2008.
THE BRAC PROCESS – Not Your Usual Brownfields Redevelopment Mary K. Ryan.
Basic Economic Development Course in Pennsylvania Environmental and Commercial Real Estate Legal Issues Surrounding Economic Development Act 2 Issues Scott.
McClellan Reuse: Successes & Challenges 2006 Update Jeanette M. Musil, M.S. Deputy Director Kathy Broderick Senior Reuse Coordinator Sacramento County.
1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.
Vermilion County Brownfield Assessment Grant. Overview Brownfield Basics USEPA Brownfield Assessment Grant Vermilion County Assessment Grant Site Selection.
SB 5296 passed in 2013 authorizing new tools: Defined Brownfields Changed Remedial Action Grant (RAG) program; made Integrated Planning Grant (IPG)
Melinda Brunner DEC Contaminated Sites Program 20 th Annual Alaska Tribal Conference on Environmental Management Anchorage, Alaska October 30, 2014.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e Stephen TerMaath Chief, BRAC Program Management Division 5 June.
Pesticide & Fertilizer Management Division Greg Buzicky, Director Dan Stoddard, Assistant Director.
Denver Federal Center Calibration Silo Removal Project What are the DFC Calibration Silos? Installed in 1981 by Bureau of Mines Support minerals industry.
 Cold Spring is a town in New York State, situated on the Hudson River  To the south of Cold Spring is:  Foundry Cove – a small river inlet  Constitution.
Hazardous waste. Threatens human health or the environment in some way because it is –toxic –chemically active –corrosive –flammable –or some combination.
Department of Defense Facilities Unit Hazardous Waste Management Program of the EPD Land Protection Branch.
Connecticut Remediation Programs Elsie Patton Connecticut Department of Environmental Protection.
Partnerships and Processes Landfill Redevelopment.
Location In the mountain of Colorado consist of numerous sites in Denver area which contaminate with radioactive soils and Debris. There are about 65.
Hyatt Regency Miami Wednesday, February 29, 2012 – Orchid C.
Enviromental aspects of Brownfield Regeneration Barbara Vojvodíková, Marcela Maturová „This project has been funded with support from the European Commission.
Green Remediation An Overview of the State of the Practice
Gary W. Baughman, Division Director 2010 Long-Term Surveillance and Maintenance Conference November 17, 2010.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e Dr. Stephen TerMaath Chief, BRAC Program Management Division 22.
McCoy Field Proposed Keith Middle School Site EPA Proposes Approval of McCoy Field Cleanup Plan.
UNLOCKING THE REAL BENEFITS OF ENVIRONMENTAL INSURANCE FOR LRAs AND DEVELOPERS Presenters: Barry Steinberg / Kutak Rock Bob Hallenbeck / XL Group – Environmental.
Enviromental aspects of Brownfield Regeneration Barbara Vojvodíková, Marcela Maturová „This project has been funded with support from the European Commission.
Legal Perspectives May 19, 2014 Jay Fox Regional Counsel FTA Region III.
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
Overview of Regulatory Changes, Policy and Implementation Colleen Brisnehan Colorado Department of Public Health And Environment Hazardous Materials and.
Institutional Controls at BRAC Sites July 19, 2011.
Overview of the Land Recycling Program (Voluntary Cleanup Program)
TURNING BROWNFIELDS. Definition US EPA 1997 abandoned, idled or under-used industrial and commercial facilities where expansion or redevelopment is complicated.
Module 1: Introduction to the Superfund Program. 2 Module Objectives q Explain the legislative history of Superfund q Describe the relationship between.
Denver Federal Center Calibration Silo Removal Plan What are the DFC Calibration Silos? Installed in 1981 by Bureau of Mines Support minerals industry.
Brownfield Redevelopment Thomas O. Jackson, Ph.D., AICP, MAI, CRE, FRICS Texas A&M University and Real Property Analytics, Inc.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
ENVIRONMENTAL ODDITIES From Here to There, and There to Here… PESTICIDES CAN BE FOUND ANYWHERE! Prepared By: Jeffrey Sotek, PE, CSP, CIH
Policy and Legal Framework on Soil Contamination Management in Thailand Workshop on Strengthening Contaminated Soil Monitoring in Vietnam, November.
Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008.
Maryland Department of the Environment Harbor Point – Regulatory Overview Horacio Tablada, Director Land Management Administration November 14, 2013.
Tier I: Module 5 CERCLA 128(a): Tribal Response Program Element 4: Verification & Certification.
Tier 1 Module 4 CERCLA 128(a) Tribal Response Program Element 3: Public Participation.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
Greener Cleanups in the Region 10 PCB Program Michelle, Mullin R10 PCB Coordinator Clu-In Webinar November 17, 2015.
December 2015 Detailed Presentation STATE WATER RESOURCES CONTROL BOARD REGIONAL WATER QUALITY CONTROL BOARDS CALIFORNIA Water Boards.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Zahava Busse Madeleine Weitzner Period.7/Mr.Vinlove
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Marian Anderson Place Site Update City Commission Special Workshop December 14, 2015.
The Dalles, Industrial Certification Northwest Aluminum Company The Dalles, Oregon Douglas C. MacCourt Ater Wynne LLP US German Bilateral Working.
Using Insurance to Fund Brownfield Development Technical Issues Geoff Glanders, President August Mack Environmental, Inc.
Omaha Riverfront Redevelopment Project Brownfields 2004 C. Dale Jacobson, P.E., DEE.
Still Afraid of CERCLA? Tools and Techniques to Address Liability Ellen M. Boyle, Esq. AIG Environmental® November 14, 2006.
Remediation and Redevelopment at the Former Fort Devens, Massachusetts.
Early Property Transfer and Privatized Cleanup at Former Military Bases The McClellan Air Force Base Experience Kathleen Johnson, Federal Facilities and.
33 South Sixth Street, Suite 4200
Proposed Plan for No Further Action
Minnesota CLE June Webcast Extravaganza Environmental Law Basics for the Business and Real Estate Practitioner Joseph G. Maternowski, Hessian & McKasy,
Redeveloping Properties with Environmental Issues
1st Avenue Revitalization Project Brownfield Pilot Study Public Outreach Property Owner Stakeholder Meeting June 1999.
Wyckoff/Eagle Harbor Site
Release Reporting Lesson 17 covers the subject of Release Reporting. You will learn how you know when you have a leak and what leaks require reporting.
U.S. Air Force Cooperative Agreement for Perfluorinated Compounds Response Activities, Phase 2 (ESCA II) Jayne Joy, P.E. July 18, 2017.
The Fire is Out What Next?
Perchlorate Issues at the Massachusetts Military Reservation (MMR) and the Aberdeen Proving Ground (APG) 9th Annual Joint Services Environmental Management.
McClellan Reuse: Successes & Challenges 2006 Update
Presentation transcript:

BROWNFIELDS 2005 Dealing with Unexpected Contamination Lowry Air Force Base Redevelopment Denver, CO Tom Markham, Executive Director, Lowry Redevelopment Authority Monica Sheets, Regulatory Specialist, Colorado Department of Public Health and Environment

Location

Lowry Today

Lowry Environmental Issues Typical of Military Base or Small City Fuel tanks, coal storage areas, groundwater plumes, landfill, etc. Air Force investigations started in 1989 BRAC Cleanup Team (BCT) (CDPHE, AF, EPA) investigations began in early 1990s

Lowry Environmental Process : Development occurred on property reviewed and approved for transfer by the BCT Cleanup was to be complete in 2000 In 2002, cleanup of groundwater and landfill cap privatized Air Force retained responsibility for soils cleanup

Northwest Neighborhood

Colorado is Notified The asbestos materials found are associated with building debris. Insulation, roofing, or tile materials—construction debris. Asbestos found in isolated pockets; scattered on the surface; and randomly distributed across the surface due to grading. Asbestos materials appear to be from Air Force buildings that were demolished in the 60’s/70’s.

Asbestos Debris

State Response Short-term: determine if immediate action needed to be taken. Were there immediate risks to the residents? Construction temporarily halted Dust controls required Long-term: determine the extent of contamination and if remediation would be necessary

State Issued Compliance Advisories Advisories directed the builders, LRA and Air Force to: Halt all excavation and soil disturbing activities in the Northwest Neighborhood Employ emissions controls Develop soil sampling and response plans Conduct limited indoor sampling

Soil Sampling

Asbestos Cleanup Costs Extensive soil sampling and removal of any detectable asbestos down to 2 feet Cost to LRA and homebuilders $15 million Not covered by environmental insurance Parties seeking reimbursement by Air Force National precedent for Air Force

LRA Perspective Caught between two conflicting agencies: AF and CDPHE Managing community relations and media coverage Concerns about stigma and property values

Lessons Learned Avoid surprises with thorough investigations Expect the unexpected—you will find previously unknown contamination Have a plan for responding to a “surprise” Make sure the military is on board with your plan and will accept and assume responsibility for cleanup This may avoid disagreements between the regulators and the military about the scope and extent of cleanup

Lessons Learned Have technical oversight during excavation to identify contamination—so you don’t exacerbate it! Notify the military as soon contamination is discovered Don’t disturb it further – the DoD may argue that not the result of their activities Document it Military obligated to come back under CERCLA 120(h) – secure this agreement and process up front

Solution: Lowry Privatization Risk management approach--plan for unknowns, expect surprises Development industry needs managed risk (builders, lenders, insurances, etc.) Integrate environmental cleanup with development Environmental insurance for asbestos, cost overruns and unknowns Secured funding and property transfer