RPCs for the W measurement in PHENIX Chong Kim Korea University Japan-Korea PHENIX collaboration workshop, Nov. 27, 2012 for the PHENIX collaboration.

Slides:



Advertisements
Similar presentations
Commissioning the PHENIX RPC Forward Trigger Upgrade Michael Daugherity Abilene Christian University for the PHENIX Collaboration.
Advertisements

1 Run 9 PHENIX Goals and Performance John Haggerty Brookhaven National Laboratory June 4, 2009.
1 Dayabay RPC Detector Zhang Jiawen Outline  Motivation  RPC introduce  RPC for Daya Bay  Efficiency and noise  Module structure  Module.
ARNAB BANERJEE Variable Energy Cyclotron Centre, India.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
IJAZ AHMEDNational Centre for Physics1. IJAZ AHMEDNational Centre for Physics2 OUTLINES oLHC parametres oRPCs oOverview of muon trigger system oIdea of.
ATLAS RPC: Cosmic Ray Teststand at INFN Lecce G. Chiodini, M. Bianco, E. Brambilla, G. Cataldi, R. Coluccia, P. Creti, G. Fiore, R. Gerardi, E. Gorini,
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
LHeC : Muon Systems L. Pontecorvo.
Status of W analysis in PHENIX Central Arm Kensuke Okada (RBRC) For the PHENIX collaboration RHIC Spin Collaboration meeting November 21, /21/20091K.Okada.
PHENIX RPC in China Li Ye Shouyang Hu Xiaomei LI China Institute of Atomic Energy
The Progress of PHENIX RPC Production in China Shouyang HU Xiaomei LI Shouyang HU Xiaomei LI Science and Technology on Nuclear Data Laboratory China Institute.
PHENIX Detector Upgrade for Triggering Fast Muons from W-Boson Decays Using RPC Technology Xiaochun He, Georgia State University For PHENIX Collaboration.
Performance of PHENIX High Momentum Muon Trigger 1.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Recent DHCAL Developments José Repond and Lei Xia Argonne National Laboratory Linear Collider Workshop 2013 University of Tokyo November 11 – 15, 2013.
PHENIX Detector Upgrades M. Grosse Perdekamp University of Illinois RHIC Spin Collaboration Meeting, LBL, November 20 th 2009 o Overview o VTX, FVTX, Muon-Trigger,
Spin J. Lajoie1 The PHENIX Muon Trigger Upgrade Outline: A (Brief) Spin Physics Motivation Antiquark Spin Contribution with W +/- bosons The PHENIX.
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
1 Test on RPC Veto Detector Model —— Anticoincidence Detector for Daya Bay Neutrino Exp. Speaker: Jiawen Zhang 5 June 2006.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
The W program at PHENIX R. Seidl (University of Illinois and RBRC) for the PHENIX Collaboration Workshop on Parity Violating Spin Asymmetries BNL, April.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
Status summary of RPC R&D for INO ICAL detector B.Satyanarayana, TIFR, Mumbai Satyajit Jena, IIT Bombay, Powai For INO Collaboration.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
February 13, 2008RPC2007-Mumbai1 RPC Production for Fast Muon Trigger System for Byungsik Hong Korea University for the PHENIX Collaboration.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
PHENIX Measurement of Parity-Violating Single Spin Asymmetry in W Production in p+p Collisions at 500 GeV Stephen Pate (for the PHENIX Collaboration) New.
Performance of the PHENIX Muon Identifier Introduction Calibration with cosmic rays Performance in Au+Au collisions Summary Hiroki Sato, Kyoto University.
Performance of PHENIX High Momentum Muon Trigger.
First measurement and future prospects for measurements of single spin asymmetries in W production with the PHENIX experiment at RHIC Young Jin Kim for.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
1/27/2016 R.Seidl: status of simulation1 W muon analysis in PHENIX Status of the background understanding, signal, smearing and asymmetries R.Seidl (RBRC)
10/27/2005J. Lajoie - PANIC '051 The PHENIX Forward Upgrade Topics: A (Brief) Spin Physics Motivation Antiquark Spin Contribution with W +/- bosons The.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Performance of PHENIX High Momentum Muon Trigger.
PHENIX W-Boson Trigger Itaru Nakagawa RIKEN/RBRC On behalf of RPC/MuTrig-FEE Collaboration.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
Reduction of Background in Observation of W Decay Using the Forward Vertex (FVTX) detector at PHENIX Abraham Meles New Mexico State University APS April.
Overview of the sea quark polarization measurements of PHENIX at RHIC DIS April 12, Rusty Towell Abilene Christian University on behalf of the PHENIX.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
October 19, 2007Heavy Ion Meeting1 RPC Upgrade for PHENIX Byungsik Hong Korea University.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
Reduction of background in observation of W – decay using FVTX tracker Abraham Meles New Mexico State University DNP2012 – Newport Beach, CA. Oct 25, 2012.
Performance and Aging Studies of BaBar RPC’s Henry R. Band University of Wisconsin for the BaBar IFR-RPC group RPC 2005 VIII Workshop.
The CMS Muon System BAN Yong, Peking University 2006/12/12 IHEP, Beijing, China Outline: CMS-Muon system: introduction China’s contribution to CMS Muon.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
RPC production and performance Chong Kim Korea university RHIC spin workshop, Seoul National Univ.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
(University of Sofia “St. Kliment Ohridski”)
Production ad Quality control of RPCs for the CMS muon barrel system
CMS muon detectors and muon system performance
PHENIX RPC R&D EFFORT Beau Meredith
Han Jifeng BESIII MUON GROUP IHEP, CAS
RPC and LST at High Luminosity
RPC Production for Fast Muon Trigger System for
Performance of a Multigap RPC prototype for the LHCb Muon System
Sea Quark Polarization Measurement via W → μ at PHENIX
11th Pisa meeting on advanced detectors
Resistive Plate Chambers performance with Cosmic Rays
Run 12 Sea Quark Polarization:
Presentation transcript:

RPCs for the W measurement in PHENIX Chong Kim Korea University Japan-Korea PHENIX collaboration workshop, Nov. 27, 2012 for the PHENIX collaboration

Outline 1.PHENIX RPCs 2.Ongoing activities and Preparations for Run 13 3.Summary 2/24

3/24 RPC 3 MuTRG RPC 1 35 cm thick SS310 absorber PHENIX forward muon trigger upgrade for W program SS310 (Stainless Steel) absorber: reduce low-p hadron’s punch through MuTRG: fast determination of high momentum tracks (tracking) RPCs: provide timing information and rough position information (timing + tracking) 1. PHENIX RPCs

4/24 PHENIX muon trigger RPC Bakelite double gap RPC Based on CMS endcap RPC technology and expertise Fast time response: 1 ~ 2 ns for MIP Gas mixture: - 95 % C 2 H 2 F 4 (R134A, base gas for avalanche mode RPC) % i-C 4 H 10 (isobutane, photon quencher) % SF 6 (electron quencher) - ~ 40 % relative humidity Cu foil (2 mm) Mylar sheet Module frame (Al) PHENIX RPC requirements  Most conditions are same to those for the CMS endcap RPCs Time resolution≤ 3 ns Average cluster size≤ 2 strips Efficiency > 95 % Rate capability0.5 kHz/cm 2 Average noise rate < 10 Hz/cm 2 # of streamer mode < 10 % 1. PHENIX RPCs

5/24 Station 3 (16 half octants) A half octant (3 RPC modules) RPC3 Module C Module B Module A 2.05 m 4.93 m 0.54 m RPC station 3 One side (N or S) of RPC station 3 is composed of 16 half octants An half octant is composed of 3 RPC modules (type A, B, and C) Each module is a double-gap RPC which satisfies PHENIX requirements RPC 3 1. PHENIX RPCs

6/24 Module assembly flow Lay down a Mylar sheet & Cu foil on the bottom module frame Put lower gap & Attach service lines (H.V, gas) Prepare readout strips & Place it on the lower gap Put upper gap on the strip & Attach service lines Put a Mylar sheet on upper gap & Wrap the cu foil Close module frame Production of a module for Station 3 Fully assembled RPC detector module Before wrap the Cu foil Connect CPE cable to the H.V cable (upper gap) Connect gas tubes to the upper gap Put upper gap on the readout stripPut readout strip on the lower gapPreparing readout strip (attach signal cables)Connect CPE cable to H.V cable on the bottom RPC gapConnected gas tubePlace lower gap into Cu foil & Connect Polyethylene gas tubesLay down Cu foil on the Mylar sheet (+ frame) Assembly of module C 1. PHENIX RPCs

7/24 Module QA Before assembly (Gap QA) Spacer pop check Gas leakage check HV hold Dark current After assembly (module QA) Noise rate check Cosmic ray test QA (Quality Assurance) for a detector module: Before assembly: spacer condition, gas leakage, HV hold and dark current After assembly (test by cosmic muons): noise rate, total & strip efficiency, time resolution & cluster size RPC cosmic ray test stand - event display cosmic ray trigger scintillators RPC readout strip planes cosmic ray trajectory 1. PHENIX RPCs

8/24 Noise rate: RPC HV = 9.5 kV, PHENIX RPC FEE threshold = 160 mV Noise rate (Hz/cm 2 ) Raw TDC : 1 unit = 100 ns/44 = 2.41 ns Time resolution vs. HV Efficiency of a module (%) vs. HV with different thresholds Cluster size of a module vs. HV with different thresholds Operation voltage PHENIX requirements Module QA results 1. PHENIX RPCs

9/24 Integrated result of half-octants QA AT FACTORY Average noise rate: 0.37 Hz/cm 2 ↔ PHENIX requirement: < 10 Hz/cm 2 1. PHENIX RPCs

10/24 Integrated result of half-octants QA AT FACTORY RPC3 S Average noise rate: 0.25 Hz/cm 2 ↔ PHENIX requirement: < 10 Hz/cm 2 1. PHENIX RPCs

11/24 RPC3N - installation (Nov. 11 th, 2009)RPC3S - installation (Sep. 22 nd, 2010) Full integration to the PHENIX DAQ system was completed during Run PHENIX RPCs

12/24 RPC1 90 cm 67 cm Octant 34 cm RPC station 1 Composed of 16 octants for both sides (8 octants for one side) Each octant is a double-gap RPC Two types of octants (A1, A2) for one side: geometrical condition was considered RPC 1 1. PHENIX RPCs

13/24 1. PHENIX RPCs

14/24 RPC1N - installation (Sep. 22 nd, 2011) RPC1S - installation (Dec. 07 th, 2011) 1. PHENIX RPCs

15/24 3D Event display Relative efficiency measurement (St 3 and St 1): ε = # of hits on RPC / # of projected μ track on RPC Hitmap of MuTR and RPC3 (Matched to RPC3 geometry) Muon Track Associated hits Raw hits Timing distributions of RPC3 2. Ongoing activities and Preparations for Run 13

16/24 Improvement in efficiency calculating method is underway Both RPC3 and RPC1 efficiency study is ongoing Efficiency vs. Half OctantsEfficiency vs. Positions Run (pp200GeV, official) : example of ongoing efficiency study, p > 3 GeV (NOT final: contains a lot of fakes!) 2. Ongoing activities and Preparations for Run 13

17/24 Efficiency vs. Run by Module type, for all pp 200 GeV Runs (NOT final!) 2. Ongoing activities and Preparations for Run 13

18/24 Absolute efficiency measurement by using Hodoscope (St 3) RPC3 MuID MuTR ! LocationDesign of Hodoscope D. Jumper (UIUC) 2. Ongoing activities and Preparations for Run 13 Efficiency by Hodoscope (NOT final)

19/24 M. Sarsour (GSU) 2. Ongoing activities and Preparations for Run 13 St 1 efficiency measurement by using cosmic muons RPC1 MuTR St 1 Track extrapolated from MuTR St 1 to RPC1 (NOT final)

20/24 M. Leitgab (UIUC) and PHENIX thechs 2. Ongoing activities and Preparations for Run 13 Additional shielding plan 1)Shielding lower Half-Octants vs. backsplashes from DX magnet By using 144 steel bricks, each 5.1×10.2× kg (300 total ordered) Stacked in 7.6 (cm) high, 40.7 wide, 3 rows Gives layer of steel in 61.0 (cm, in z) × 15.2 thick × (x) Fill any additional spaces with spares/scrap steel Figure made by R. Seidl, used by M. Leitgab, and quote by C.Kim Plots made by Ralf Seidl, used by M. Leitgab, quoted by C. Kim Figure by D. Lynch

21/24 2. Ongoing activities and Preparations for Run 13 M. Leitgab (UIUC) and PHENIX techs Additional shielding plan

22/24 F. Giordano, D. Jumper (UIUC) and PHENIX techs 2. Ongoing activities and Preparations for Run 13 RPC1 temperature control Temperature control: Very little space remains when Muon arms are in Run position Install thermocouples (2 per side) for monitoring Install blowers (2 per side) to increase air flow Thermocouple calibration and Blower installation is underway

23/24 2. Ongoing activities and Preparations for Run 13 F. Giordano, D. Jumper (UIUC) and PHENIX techs Gas recirculation Former gas circulation method suspected makes impurities in flowing gas Performed all 3 test by using 2 spare RPC1 octants for 2 weeks: no effect Case 1 test ongoing by using prototype RPC1 without linseed oil coating Preparing for check gas itself by using gas analyzer Case 1Case 2Case 3

24/24 PHENIX RPCs for the forward muon trigger system Provides timing and additional position information All of stations were produced, tested, and installed Ongoing activities and Preperations: Efficiency measurement for both stations by using real data and cosmic muons… Additional shielding, temperature control, gas recirculation tests, timing shift control, dead/hot channels management, put ‘watchdog’ process in MuTrig for misalignment in several RPC1… Not an ideal we-are-ready-to-go state, but we’re closing to it step by step 3. Summary

Thanks!

Backup B/1 Spin crisis: DIS result at 1980s: proton spin is not a simple sum of its constituent quarks Component-by-component approach: quarks/antiquarks, gluons, and their angular momenta → ½ = ½ΔΣ + ΔG + L z W measurement at PHENIX: Full flavor separation of quarks/antiquarks Measure the polarization of the quark by leptons decayed from W boson A L W : single spin asymmetry p: beam polarization (Max. 70 % for 500 GeV pp) N L(R) (W) : # of events contains the muons from W with corresponding helicity (L or R) ΔΣ = ± for Q 2 = 10 and ≤ x ≤ 1

Backup B/2 PHENIX Run 12 - pp 510 GeV remark Statistics: more than 30 pb -1 for vtx ≤ 30 cm Beam polarizability: larger than 60 % Newly integrated detectors: RPC1 and FVTX

Backup B/3 Muon Hadron Muon Tracker (MuTr) Muon ID (MuID) PHENIX muon arms (before upgrade) Acceptance < |η| < Δφ = 2π Muon Tracker (MuTR) - 3 stations of CSCs Muon ID (MuID) - 5 gaps of larocci tube in x & y directions - Total 80 cm thick steel absorber (plates) Muon tracking and triggering - Tracking by hit positions from each station - Most hadrons are absorbed before reaching last gap of the MuID - Current 1 st level rejection factor (RF): ~ 100 (MuID based 1 st level trigger)

Backup B/4 Simulated muons into Muon Arms (2000 pb -1, with PYTHIA 5.7) MuID base trigger (before trigger upgrade) W measurement at PHENIX muon arms √s = 500 GeV σ = 60 mb L = 1.5 x cm -2 s -1 → 3.0 x cm -2 s -1 (after luminosity upgrade) Total interaction rate: 9 MHz DAQ limit: 2 kHz Required 1 st level rejection factor (RF): 4500 Dedicated trigger system is required: → Forward muon trigger upgrade After trigger upgrade

Backup Momentum selectivity through online sagitta measurement Uses MuTr station 1, 2, 3 and RPC station 1, 3 Implement trigger using fast, parallel logic on FPGA’s Beam related background rejected by RPC’s timing information RPC 1 RPC 3 B/5

Backup MuTRG ADTX MuTRG MRG Level 1 Trigger Board MuTr FEE Resistive Plate Chamber (RPC) (Φ segmented) B 2 planes 5% 95% Trigger Interaction Region Rack Room Optical 1.2Gbps Amp/Discri. Transmit Data Merge MuTRG RPC FEE Trigger events with straight track (e.g. Dstrip <= 1) RPC / MuTRG data are also recorded on disk B/6

Backup B/7

Backup B/8