NYISO Capacity Markets: Function, Performance, and Future Presented to: Joint Technical Conference on New York Markets & Infrastructure Docket No. AD14-18-000.

Slides:



Advertisements
Similar presentations
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Advertisements

EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Brookfield Renewable Energy Group. Focusing on Renewable Power Generation and Transmission Conceptual discussion how to integrate renewable resources under.
Transmission Independence and Investment Pricing Policy for Efficient Operation and Expansion of the Transmission Grid FERC Docket Nos. AD and.
1 July 15, 2007Alcoa Energy Regulatory Affairs NARUC / FERC Demand Response Collaborative Perspectives of a Large End Use Participant of NYISO Programs.
Discussion of Inter-RTO Seams Issues Presented by: Midwest ISO and NYISO Independent Market Monitor David B. Patton, Ph.D. Potomac Economics October 7,
Highlights of the 2004 State of the Market Report New York Electricity Markets David B. Patton, Ph.D. Potomac Economics Independent Market Advisor May.
Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
Resource Adequacy in PJM
NARUC-FERC Demand Response Collaborative Meeting NARUC Fall Meeting Anaheim, CA T. Graham Edwards President & CEO November 11, 2007.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Bruce Mountain Director Market power and generation from renewables: the case of wind in the South Australian electricity market Presentation to IAEE 35.
LTTR, FCM, RPM, MRTU: Do More Acronyms Mean Better RTO Markets? An Overview of Various RTO Capacity Constructs and their Impact on Load.
Connecticut’s Energy Future Connecticut Energy Advisory Board Conference Hartford, Connecticut December 2, 2004 Kevin Kirby Vice President, Market Operations.
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
The Convergence of Market Designs for Adequate Generating Capacity Peter Cramton and Steven Stoft 24 March 2006.
A Capacity Market that Makes Sense Peter Cramton & Steven Stoft 18 March 2005.
BOSTON CHICAGO DALLAS DENVER LOS ANGELES MENLO PARK MONTREAL NEW YORK SAN FRANCISCO WASHINGTON Governors’ Wind Energy Coalition November, 2011 Competitive.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
Gas & Power Coordination: Growing Pains in Time of Transition Mark Stultz, BP Natural Gas Supply Association OPSI Annual Meeting Chicago, Illinois October.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Competitive Wholesale Power Market: Capacity Market
1 PRR 776 in the Context of the ERCOT Market Design Eric S. Schubert Regulatory Affairs Advisor BP Energy Company.
RISK & CAPACITY INVESTMENT INCENTIVES IN ELECTRICITY MARKETS Peter Jackson Department Of Management University Of Canterbury.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
20 September 2015 GAZ DE FRANCE ESS Introduction of Gas Reserve Arrangements Mark Bailey Gaz de France ESS.
NGEIR Technical Conference Presentation May 16, 2006.
LMP Electricity Markets: Market Operations, Market Power, and Value for Consumers EMRI Symposium American Public Power Association February 5, 2007 Presented.
Demand Response in Midwest ISO Markets February 17, 2008.
George A. Godding, Jr. Director, Management and Communications Office of Market Oversight and Investigations Comments are the speakers and do not necessarily.
Overview of the Capacity Markets in the United States 2008 APEX Conference in Sydney, Australia October 13-14, 2008 Hung-po Chao Director, Market Strategy.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
1 Aggregate Supply CHAPTER 11 © 2003 South-Western/Thomson Learning.
1 Capacity Markets Investment in Generation Capacity Payments October 31, 2005 J. W. Charlton.
Colombian Firm Energy Market: Discussion and Simulation Peter Cramton (joint with Steven Stoft and Jeffrey West) 9 August 2006.
1 Independent Market Monitoring in the Midwest ISO Presented to: Federal Energy Regulatory Commission David B. Patton, Ph.D. Independent Market Monitor.
Electric Energy Issues and the Region Connecticut Business and Industry Association Stamford, Connecticut December 2, 2004 Kevin Kirby Vice President,
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
Transmission Reliability Program Review Market Monitoring Tools Bernie Lesieutre and Bob Thomas Lawrence Berkeley National Laboratory Cornell University.
PJM©2012www.pjm.com PJM’s Experience with Capacity Markets Terry Boston President & CEO PJM Interconnection Power Across Texas September 21, 2012.
Review of CAISO Wholesale Electricity Market Trends APEX Sydney Conference California Electricity Wholesale Market Trends October 13, 2008 Anjali Sheffrin,
An update on the Market Development Program Phil Bishop New Zealand Electricity Commission Presentation to the EPOC Winter Workshop 3 September 2009.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
New Keynesian School Nominal Rigidities. Some Keynesian models rely on the failure of nominal wages and prices to adjust to their new market clearing.
The Operation of the Electricity Markets Brent Layton Talk at EMA Central Electricity Forum 6 th April 2006.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
PJM © 2006 The Institute for Regulatory Policy Studies Illinois State University Conference May 12, 2006 Jeff Bladen PJM Interconnection.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
To Buy or To Build Is it really one or the other? APPA New Generation Workshop Portland, Oregon August 1, 2007.
Wholesale Electricity Markets: Opportunities and Challenges Howard HaasUSAEE October 27, 2015.
The RGGI Auction Allocation Process: Concerns and Recommendations Presented by James H. Savitt, Ph.D To The RFF Auction Workshop in NYC 20 July 2006.
IMM Report on MISO South Integration Presented by: David B. Patton, Ph.D. Independent Market Monitor Presented to: Entergy Regional State Committee April.
Connecting the Dots in New England: NEPOOL’s IMAPP Initiative
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
SPP-Entergy Market Power Analysis
The Future of Demand Response in New England
Benefits of New England’s Proposed Capacity Market
Generation Expansion Daniel Kirschen
Long-term Capacity Market
Market Design in New England
Presentation transcript:

NYISO Capacity Markets: Function, Performance, and Future Presented to: Joint Technical Conference on New York Markets & Infrastructure Docket No. AD By David B. Patton, Ph.D. President, Potomac Economics November 5, 2014

Together with NYISO’s energy and reserve markets, the capacity market in New York serves a pivotal role in facilitating long-term resource decisions. We have been evaluating the performance of the capacity markets in New York, New England and the Midwest over the past 14 years. This presentation will address the following topics: The Need for Capacity Markets Evaluating the Performance of a Capacity Market Performance of the NYISO Capacity Market Recommendations for Improvements Selected Technical Conference Questions and Issues Overview of Presentation - 2 -

Market-based investment in wholesale electricity markets is ultimately facilitated by the markets’ economic signals, including: Energy and ancillary service net revenues during non-shortages; Energy and ancillary service net revenues during shortages; and Capacity market net revenues; Long-run equilibrium is achieved when the combination of these expected revenues covers entry costs of the marginal resource. “Energy-only markets” include the first two revenue streams (because they lack a capacity market). Energy-only markets will sustain some level of resources. However, they will generally not produce sufficient revenues to facilitate the investment/retirement decisions needed to satisfy the RTO’s planning requirements. In other words, there is “missing money”. Capacity markets exist primarily to provide the missing money. The Need for Capacity Markets - 3 -

Planning reserve requirements exceed capacity levels that an energy- only market would provide (assuming efficient shortage pricing). Why? First, the “1 day in 10 year” reliability standard implies a value of lost load of $100,000 to $200,000 per MWh. Therefore, additional revenues are needed to prompt the higher level of investment(and slower retirements) needed to satisfy these targets. Second, the higher planning margins result in more supply, which reduces the frequency of shortages (and associated shortage revenues). Third, RTOs take costly reliability actions that tend to reduce real- time prices such that they do not reflect the full value of energy. Lastly, some planning requirements cannot be readily reflected in the real-time market and thus will not be reflected in its shortage pricing. Why is There “Missing Money” in Electricity Markets? - 4 -

To most efficiently provide the “missing money”, capacity markets have been developed to allow competition to establish price signals to facilitate the actions necessary to satisfy the planning requirements. The NYISO capacity market is an example of a fundamentally sound RTO capacity market design; Suppliers submit offers to supply capacity for various time periods (e.g., monthly, seasonally). Under competitive conditions, the offers should reflect the minimum payment needed to continue to operate (i.e., “going-forward costs”); A sloped demand curve reflects the marginal value of capacity in providing reliability to the NYISO system. Clearing pricings are established where supply offers intersect the demand curve. A well-functioning market, these clearing prices will facilitate efficient long-term decisions, including new investment, retirement and maintenance decisions. The Role of a Capacity Market - 5 -

Capacity market performance should be judged by the outcomes it has facilitated and whether the outcomes have been efficient. What outcomes are expected in a well-functioning capacity market? Capacity enters when and where it is needed. Capacity retires when it is no longer economic or needed. Market power is not exercised. Capacity prices are transparent and predictable over the long-term. The centralized capacity market need not do everything: A well-functioning spot capacity market will facilitate efficient forward contracting by providing an efficient predictable price signal. The centralized capacity need not establish forward contracts. A spot capacity market should not hinder public policy initiatives that address factors not reflected in or priced in the capacity market. Evaluating the Performance of a Capacity Market - 6 -

Based on these criteria, the NYISO capacity market has performed relatively well. The outcomes have been consistently competitive with very little capacity withheld from the market. The market has facilitated new investment when and where it has been needed to satisfy NYISO’s planning requirements. – –NYISO has never been short of its planning requirement market- wide or in its load pockets. More than 12,000 MW of new capacity has been developed in New York over the past 14 years, which has included merchant generation, merchant transmission, and investment with forward contracts. Retirement decisions have generally been efficient. However, the delay in defining the Southeast New York capacity zone likely led to some inefficient retirements and hindered investment in that area. Evaluating the Performance of a Capacity Market - 7 -

Factors Contributing to the Good Performance of the NYISO Capacity Market A sloped demand curve that reflects the reliability value of additional capacity above the minimum requirement, which: Provides efficient spot capacity prices that reflect the prevailing supply. Improves price stability, which facilitates investment by reducing risk. Reduces incentives to withhold capacity by raising the opportunity costs of withholding (foregone revenues) and decreasing its price effects. Locational requirements that reflect the fact that transmission constraints cause RTOs’ planning needs to vary locationally. NYISO’s locational market allows prices to efficiently signal the value of capacity in local areas based on the supply and demand in each area. Market power mitigation measures to ensure that outcomes are competitive. Supply-side: to prevent withholding that would increase prices. Buyer-side: to prevent uneconomic investment intended to lower prices. Transparent spot capacity prices facilitate efficient forward contracting.

Although the NYISO capacity market is performing relatively well, we have recommended incremental improvements in two key areas. Refinements in the Mitigation Measures Improvements in the mitigation measures will keep them effective and ensure that they do not hinder efficient investment. Our buyer-side recommendations include: A competitive entry exemption. Modifying key assumptions in the exemption analysis, including the assumed entry date and the status of mothballed units. Improving the offer floor applied to mitigated units. Our supply-side recommendations include: Enhance the pivotal supplier test in NYC so that it matches the rule for the new capacity zone. Recommendations for Improvements - 9 -

Dynamic Locational Framework When planning needs arise because of new deliverability constraints, it is highly beneficial for: Capacity prices to immediately reflect these needs; and Capacity prices to not reflect these needs when the deliverability constraints are no longer binding. Locational needs can arise or disappear quickly as resources enter or retire, or as transmission is built. A dynamic framework should facilitate actions by participants in advance of the locational prices emerging based on the expected changes in supply, demand, or the transmission network. A dynamic framework reduces the potential that reliability contracts may be needed in the future to address unpriced reliability needs. Recommendations for Improvements (cont.)

Should the NYISO capacity market provide a longer revenue certainty period (e.g., 3, 5, or 10 years)? This is not necessary. The NYISO’s spot capacity market facilitates bilateral contracting that can provide revenue certainty. Does the existing NYISO capacity market appropriately incent investment as compared with three-year forward market designs in other capacity markets (e.g., PJM, ISO-NE)? Yes, based on the past results in New York. There is little evidence that awarding a one-year capacity contract three-years ahead would better motivate investment. A “lock-in” provision may motivate investment, but we are concerned that such provisions may raise costs over the long-term. However, the NYISO is studying these issues and we look forward to reviewing their results. Technical Conference Questions: Meeting Reliability Objectives

Are long-term bilateral contracts a feasible alternative procurement mechanism for New York (e.g., California model)? Bilateral contracts complement the NYISO capacity market, but are not a reasonable substitute. Contracts do not provide transparent price signals and cannot facilitate efficient decisions by suppliers. Bilateral contracts as a substitute for the capacity market would shift substantial risk from suppliers/investors to NYISO’s customers. Are changes to NYISO’s capacity market necessary to better ensure resource performance during peak demand conditions? The primary incentive for good resource performance is NYISO’s real- time pricing (shortage pricing in particular). Resources that are unavailable during peak periods incur tremendous costs or lost profits, particularly when they contribute to a shortage. The NYISO is evaluating whether incremental changes in the capacity market may be beneficial. Technical Conference Questions: Meeting Reliability Objectives

Why are Reliability Support Services (RSS) agreements needed? Reliability agreements are generally needed when the locational market needs do not fully reflect an RTO’s true reliability needs. RSS contracts have generally been used in New York for relatively narrow local needs that can be addressed by very few suppliers. What is the effect of RSS agreements on the ability of the NYISO capacity market to efficiently meet the intended goal of incentivizing investment in resources and infrastructure? The effect on the market efficiency is are minimal if the agreements are with lowest cost supply option for satisfying the local need. Are there other market and infrastructure impacts of the use of RSS agreements? Markets could be impacted if the use of RSS expands beyond the current isolated local needs. The dynamic local framework we recommend would tend to limit the expanded use of RSS agreements. Technical Conference Questions: Meeting Reliability Objectives

Are changes to the capacity market needed to account for fuel availability/firmness of fuel, or to differentiate the value of capacity resources based on the “firmness” of fuel arrangements? The real-time energy market should play the primary role in providing these incentives. Efficient shortage pricing greatly rewards: – –Non-gas units that can run during gas shortages; – –Resources with back-up or firm fuel supplies; Hence, RTOs should ensure real-time market efficiently rewards such characteristics before modifying the capacity markets to do so. The proposed changes in NYISO’s real-time shortage pricing will improve these incentives. The NYISO is evaluating whether additional changes in the energy or capacity may be warranted. Technical Conference Questions Meeting Public Policy Objectives

The NYISO market design has been very effective in facilitating investment and maintaining adequacy. Buyer-side mitigation measures could be improved to ensure that they do not impede economic investment. The locational market framework should be more responsive to changing system conditions. We have not recommended NYISO pursue mandatory forward procurement. Stability in the design and operation of the capacity market is critical. Investors must be able to project capacity revenue over the life of their resources. Instability raises investment risk that will cause investors to require higher prices to enter. Final Thoughts