Gate Rehabilitation – Phase 1 NS09, NS10 and NS12 Contract C98045C03 Prebid Meeting – Technical Presentation May 9 th, 2013.

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT 2 Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.
Advertisements

Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Visalia WCP Trickling Filter Upgrade Project 1994/1995 Trickling Filters, Pump Station and Flow Control Box Modifications.
USER MAINTENANCE.
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
2011 MF LRG New Orleans, LA Mobile Facilities Engineering FRC Southwest, North Island Design of MF Configurations Lloyd Bjurman, Lead Pete Vicencio, Electrical.
Fluid Power Hydraulic Cylinders
LOCKOUT TAGOUT Introduction Each year nearly 150 people die because there was a failure to control energy.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Interest Approach Identify the major systems of an engine.
- Flexible Hoses- Ring Housing - Nitrogen Tank-Collection Cylinder - High Pressure Water Tank- Flow meter - Gas Regulator- Water Filter - Pressure.
GIBSON ISLAND WATER SYSTEM CAPITAL IMPROVEMENT PROJECT Public Information Meeting June 5, 2012.
Presentation to Barclay Owners November 21, 2013 Window Replacement Project Information Session.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Advanced hydraulic solutions
Hydraulics.
Gas Transmission Pipelines
LOCKOUT / TAGOUT How to Effectively & Efficiently Control Hazardous Energy LOTO Presentation – Worker, 9/2004.
One Corps Serving the Armed Forces and the Nation Navigation Lock and Dam Inspection and Emergency Repairs Workshop April 2006 Mel Price – Auxiliary.
Welcome.. Guide Continue Welcome to the BIM Execution Planning Guide Tool. When prompted, please provide the appropriate information. If there are questions.
Pre-Construction Phase 1 - Job Site Conditions Work Plan -2.
ESTIMATING By Laith Jacob.
Delivering LNG to remote sites to service pipeline interrupts on a temporary basis.
Pipe Fittings. Purpose of Pipe Fittings  Plumbing fittings have different shapes which allow rigid straight pipe to change both direction and diameter.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
LOCKOUT / TAGOUT Employee Training Thomas McGee, L.C. 920 Main Street, Suite 1700 Kansas City, MO (816) * Toll Free (800)
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
Cylinder Head Motorcycle Engineering (021) Overhaul Cylinder Head (SK-KD – 04)
Company Profile. EMPIRE SOLUTIONS EXPERIENCE With more than 10 years of experience dedicated to the roofing, energy conservation, corrosion control, painting.
Greenman-Pedersen, Inc. Coatings Group Review of Maintenance Prioritization Schemes from Three Transportation Authorities Christopher L. Farschon, P.E.,
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
General Conditions of the Contract for Construction Articles 19 through 24 October 6, 2008.
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
What is Fluid Power? Fluid power is energy transmitted and controlled by means of a pressurized fluid, either liquid or gas. The term fluid power applies.
 Journeyman  Management  Specialization  Teaching  Owning a business.
EUROPE CONTRACTING. EUROPE CONTRACTING Company Presentation  International Activity Activity in Romania Projects in Romania Quality Management Health.
ROAD PAVEMENT FORUM RECENT EXPERIENCES ON PPGS PROJECTS HISTORY 1993 RPF (BMLC) PPGS Task Group Formed 1994CAPSA Resolution to promote concept 1996Initial.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
OUR PASSION: Earthmoving & Mining Machines Plant Maintenance Fabrication Erection.
Week 3. Electrical Code 1. all electrical outlets run off a pigtail from main line 2. Each Circuit is wired directly into circuit panel - no junction.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
Brentwood of Palatine Condominium Board Meeting Financials – Budget discussion Approval of Minutes / Resolutions Gate status – Alternatives pending.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Electrical Safety Craig Shurson CSP, ARM Regional Loss Control Coordinator Hortica - The Florists Mutual Company.
Maintenance Training Series INDUSTRIAL HYDRAULICS A training program designed for individuals who want a comprehensive study of industrial hydraulics.
AG Mechanics Fall Semester Review. 1.1 Define terminology 1. Agricultural mechanics – a broad area of knowledge and skills related to performing construction,
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
By John Templeton.  Definition- the science that deals with the laws governing water or other liquids in motion and their applications in engineering;
An introduction to… Lockout Tagout. Aim Every year thousands of workers get killed or injured while performing repairs or maintenance on industrial equipment.
BS0502 Flood Protection Erie Street Valve Chamber Platform TS-2575 Prebid Meeting – Technical Presentation May 8 th, 2013.
Town of East Greenbush Waste Water Treatment Plant Project Monthly Update – September 2014.
Pipe Fittings Purpose of Pipe Fittings  Plumbing fittings have different shapes which allow rigid straight pipe to change both direction and diameter.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
IDENTIFY THE MAJOR SYSTEMS OF AN ENGINE!. NEXT GENERATION SCIENCE/COMMON CORE STANDARDS ADDRESSED! CCSS.ELA Literacy.RST.9‐ 10.3 Follow precisely a complex.
Engineering II – August 2016
Deferred Maintenance Deferred Maintenance
Pipe Fittings.
Pneumatic and Hydraulic
INDUSTRIAL HYDRAULICS
PROJECT MANAGEMENT 2 Chu Eu Ho
Forging new generations of engineers
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Pinole-Hercules Water Pollution Control Plant Upgrade Project
New Specifications for 2017
Forging new generations of engineers
CYLINDER CASE FIG 601 P1 204.
Illinois Waterway 2020 Consolidated Closure
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Gas Transmission Pipelines
Fluid Power System Maintenance and Troubleshooting
Presentation transcript:

Gate Rehabilitation – Phase 1 NS09, NS10 and NS12 Contract C98045C03 Prebid Meeting – Technical Presentation May 9 th, 2013

Site Locations Three Work Sites NS09 Junction N. 3 rd & W. McKinley NS10 Junction N. Water & E. St. Paul NS12 Junction N. 31 st & W. Hope

Gate Rehab Work Includes: Gate operator removal, transportation to rehab facility, disassembly, examination and diagnosis for rehabilitation or replacement Rehabilitate operator if feasible, including new position & proximity switches, piston cup and tube end seals, piston rod and tie rod replacement, and cleaning/recoating exterior cylinder surfaces Replace operator if rehabilitation is not cost-effective Preventive maintenance and lubrication of the gates Power cleaning/preparation and coating of interior support steel. Accumulator work Rehabilitate and/or replace Construct concrete support curbs to raise accumulators Replace all exposed hydraulic piping, hoses, fittings and valves Replace all exposed electrical conduit, junction boxes and conductors Perform operational readiness and functional acceptance testing

Gate Rehab Work Example

Gate OperatorAccumulator

Operator Support SteelGate & Stem Lubrication

Electrical Conduit & Wiring

Coordinate site access and service interruptions with Resident Engineer and Veolia Special access requirements at NS09 Junction Chamber with Aloft Hotel & Condos Veolia contractor safety training required Lockout / tagout required at removed gate operators Flow control plan requires, in part, one gate to remain in service throughout duration of the work NS12 work is restricted to dry-weather season (October to May) 10-year defects and workmanship warranty required on new and rehabilitated gate operators Contractor to coordinate staging requirements 15% S/W/MBE and One Apprenticeship is required Gate Rehab Constraints

NS09 Site Access

NS09 Junction Chamber

NS10 Site / Junction Chamber

NS10 Junction Chamber

NS09 Site Access / J unctio n Chamber

NS12 Junction Chamber

Bid Structure Solicits lump sums and unit prices for both rehabilitation and replacement Cumulative sum used as a basis for lowest responsive bid Contract amount based on sum of replacement items If Owner chooses rehabilitation over replacement, a credit will be made equal to the difference between the amounts bid for replacement and rehabilitation

Questions?