Umberto Emanuele IFIC (CSIC-UV), Valencia (Spain) Status of Time Calibration System forKM3NeT.

Slides:



Advertisements
Similar presentations
Trigger issues for KM3NeT the large scale underwater neutrino telescope the project objectives design aspects from the KM3NeT TDR trigger issues outlook.
Advertisements

Kay Graf Physics Institute 1 University of Erlangen ARENA 2006 University of Northumbria June 28 – 30, 2006 Integration of Acoustic Neutrino Detection.
Status of the ANTARES Neutrino-Telescope Alexander Kappes Physics Institute University Erlangen-Nuremberg for the ANTARES Collaboration WIN´05, 6.–11.
Ciro Bigongiari. Schematic View 17/05/2011Ciro Bigongiari 2 Photon Path Optical Beacon Optical Module Sea water.
IMPACT OF WATER OPTICAL PROPERTIES ON RECONSTRUCTION: HINTS FROM THE OB DATA. A PRELIMINARY STUDY ANTARES Collaboration Meeting CERN, February 07 th -10.
H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION.
Kay Graf Physics Institute University of Erlangen TeV Particle Astrophysics II Madison, WI, USA August 28 – 31, 2006 Towards Acoustic Detection of UHE.
STATUS OF THE ABSORPTION LENGTH MEASUREMENT ANTARES collaboration meeting Clermont-Ferrand (France), May 17th-20th 1 H Yepes, JdD Zornoza, J Zuñiga, C.
Introduction to Fiber Optics
Paolo Musico on behalf of KM3NeT collaboration The Central Logic Board for the KM3NeT detector: design and production Abstract The KM3NeT deep sea neutrino.
Deep-sea neutrino telescopes Prof. dr. Maarten de Jong Nikhef / Leiden University.
The ANTARES experiment is currently the largest underwater neutrino telescope and is taking high quality data since Sea water is used as the detection.
Characterization of Silicon Photomultipliers for beam loss monitors Lee Liverpool University weekly meeting.
Hanoi, Aug. 6-12, 2006 Pascal Vernin 1 Antares Status report P.Vernin CEA Saclay, Dapnia On behalf of the Antares collaboration P.Vernin
Coincidence analysis in ANTARES: Potassium-40 and muons  Brief overview of ANTARES experiment  Potassium-40 calibration technique  Adjacent floor coincidences.
Francisco Salesa Greus IFIC (CSIC–Universitat de València, Spain) Representing the KM3NeT Consortium 4 th International Workshop on Very Large Volume Neutrino.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
Amsterdam 29 March 2011 Fernando Urbano IFIC (CSIC – Universidad de Valencia) KM3NeT Optical Calibration Laser Beacon and Nanobeacon Status.
INSTRUMENTATION NEEDS FOR THE CALIBRATION UNIT …AS A WORK DOCUMENT Pascale Keller KM3Net Meeting CPPM, january 2013 Inputs from : Miguel Ardid, Tassos.
S. Viola VLVνT 2015, Rome – 14/09/2015 Characterization and testing of the KM3NeT acoustic positioning system F. Simeone VLVνT 2015 – Rome, 14/09/2015.
1 N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Operation and performance of the NESTOR test detector.
Maintenance of the ANTARES deep-sea neutrino telescope 1 Marco Circella --- INFN Bari on behalf of the ANTARES Collaboration.
Report of the HOU contribution to KM3NeT TDR (WP2) A. G. Tsirigotis In the framework of the KM3NeT Design Study WP2 Meeting - Erlangen, May 2009.
Review of Positioning in ANTARES Dr. Lee F. Thompson Department of Physics and Astronomy University of Sheffield Special thanks to Vincent Bertin, CPPM.
Observation of Bioluminescence in ANTARES J. Brunner.
Experimental set-up for on the bench tests Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE/Photonis Multi-Channel.
Status of the Genova activity on a direction-sensitive optical module toward the KM3 detector M.Taiuti WP3 PYLOS 16/4/2007.
Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration.
Digital & Analog electronics for an autonomous, deep-sea Gamma Ray Burst Neutrino prototype detector K. Manolopoulos, A. Belias, E. Kappos, C. Markou DEMOKRITOS.
KM3NeT Pylos meeting, April, 2007 Some preliminary studies for the positioning calibration of KM3NeT Miguel Ardid Universitat Politècnica de València.
Acoustic Calibration for the KM3NeT Pre-Production Module Alexander Enzenhöfer on behalf of the KM3NeT consortium VLV T 2011 Erlangen, –
Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.
First results from the Biocams J. Brunner. Cameras on floor 1 and floor 5 together with an OM and an ADCP Floor 1 –80m above sea floor Floor 5 –270m above.
The ANTARES Project Sino-French workshop on the Dark Universe Stephanie Escoffier Centre de Physique des Particules de Marseille On behalf of the ANTARES.
1 A.Tsirigotus Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch The NESTOR O.M.
Time over Threshold electronics for an underwater neutrino telescope G. Bourlis, A.G.Tsirigotis, S.E.Tzamarias Physics Laboratory, School of Science and.
Time calibration system for the KM3NeT deep sea neutrino telescope S. Toscano, IFIC (Instituto de Física Corpuscular)
Time Calibration with Optical Beacons Pylos, Apr 2007 C.Bigongiari IFIC Pylos, Apr 2007 C.Bigongiari IFIC (CSIC – Universitat de València)
Ciro Bigongiari, Salvatore Mangano Results of the optical properties of sea water with the OB system.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Time Calibration of the ANTARES Neutrino Telescope 2 nd International Conference on Technology and Instrumentation in Particle Physics 08 – 14 June 2011.
Charles University Prague Charles University Prague Institute of Particle and Nuclear Physics Absolute charge measurements using laser setup Pavel Bažant,
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
PMT measurements in Antares Oleg Kalekin on behalf of Antares collaboration VLVnT 2011 Erlangen
ANTARES Status report  Experiment overview  Status of construction  Status of operation  Status of physics analyses Presentation at ICATPP’07. Oct.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Calibration of Under Water Neutrino Telescope ANTARES Garabed HALLADJIAN October 15 th, 2008 GDR Neutrino, CPPM, Marseille.
A. Tsirigotis Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Reconstruction, Background Rejection Tools.
Simona Toscano In the frame of KM3NeT consortium VLV T workshop - Toulon, April 2008.
Development of combined sensors for UHE neutrino detection Alexander Enzenhöfer ARENA 2010 Nantes,
Status and Advances on the Acoustic Positioning System for KM3NeT Giuseppina Larosa, IGIC-UPV KM3NeT General Meeting, Nikhef 28-31/03/2011.
VLVNT’08 - ToulonM. Ardid – Positioning System of the ANTARES Neutrino Telescope Positioning system of the ANTARES Neutrino Telescope Miguel Ardid (IGIC.
Isabella Amore VLV T08, Toulon, France April 2008 International Workshop on a Very Large Volume Neutrino Telescope for the Mediterranean Sea Results.
M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.
M. Circella, INFN Bari Time-calibration in NEMO VLVnT08 Time calibration in NEMO M. Circella, INFN Bari Time calibration The NEMO Phase 1&2 towers Time.
KM3NeT Optical Calibration Umberto Emanuele IFIC (CSIC – University of Valencia, Spain) WPF/L KM3NeT Meeting Nikhef 5 th - 7 th July
Marseille 29 January 2013 Diego Real IFIC (CSIC – Universidad de Valencia) Instrumentation for Optical Calibration: Laser Beacon and Nanobeacon.
Optical calibration from ten to hundreds of meters for the Neutrino Burst Experiment (a poor man’s Km 3 underwater neutrino telescope) NESTOR/NOA Spyridon.
Status of the NEMO tower validation Integration Tests Improvements Deployment program M.Anghinolfi- km3-day meeting )
Measurement of the group refractive index in the ANTARES site with the Optical Beacons at 3 wavelengths ● Introduction ● Method ● Measurement with Monte.
Pre-Production Models for KM3NeT
KM3NeT P.Kooijman Universities of Amsterdam & Utrecht for the consortium.
Deep-sea neutrino telescopes
White Rabbit in KM3NeT Mieke Bouwhuis NIKHEF 9th White Rabbit Workshop
TDR of PMT: Timing issues
ANTARES time calibration
on behalf of the NEMO Collaboration
Directional Optical Module Integration
Department of Physics and Astronomy,
Nanobeacon: A low cost calibration instrument for KM3NeT
Presentation transcript:

Umberto Emanuele IFIC (CSIC-UV), Valencia (Spain) Status of Time Calibration System forKM3NeT

Digital Optical Module (DOM) 31 PMTs/DOM - 40 DOM/Line 300 lines (in two separated groups) Digital Optical Module (DOM) 31 PMTs/DOM - 40 DOM/Line 300 lines (in two separated groups)

INTER D.U. Calibration : Laser Beacons - High intensity ( > 20 μJ ) and short pulses (< 1 ns) - Collimated beam -> Diffusion device needed INTER D.U. Calibration : Laser Beacons - High intensity ( > 20 μJ ) and short pulses (< 1 ns) - Collimated beam -> Diffusion device needed

Control Electronic board: Select the intensity of flashing Select the trigger (external or auto-trigger) Provides an external trigger signal Select the frequency of the external trigger Control Electronic board: Select the intensity of flashing Select the trigger (external or auto-trigger) Provides an external trigger signal Select the frequency of the external trigger Pulser: Auto-triggered – External clock not needed Controlled by one (or two) DC Voltage: - LED intensity and frequency non-correlated Pulser: Auto-triggered – External clock not needed Controlled by one (or two) DC Voltage: - LED intensity and frequency non-correlated

Two PVC made pieces: One piece glued to the glass sphere (fixed) The second one screwed (in) to the first one: Holds the LED + Electronics Protect the PMT from the Nano-Beacon Light Possibility of replacement Two PVC made pieces: One piece glued to the glass sphere (fixed) The second one screwed (in) to the first one: Holds the LED + Electronics Protect the PMT from the Nano-Beacon Light Possibility of replacement

A 15°opening angle is sufficient to illuminate OMs above the beacon even in perpendicular arrangement including potential misalignment 3m 40m

Summary for information: InstrumentsNumber needed DOM4 DIM2 Compass6 FFR2 Hydrophone5 Nanobeacon6 NDLM20 Piezo6 Tilt meter6 Temperaturesome autonomous real time Storey DOMs, 2 hydrophones Storey NDLM Storey NDLM Storey DOMs, 2 hydrophones Storey NDLM Storey NDLM Storey NDLM Storey NDLM Storey NDLM Storey NDLM Storey NDLM Storey NDLM+OFM Stoery NDLM Storey NDLM Storey NDLM Storey NDLM Storey NDLM Storey NDLM Storey NDLM Storey NDLM Spacer 280 NDLM Spacer 140 NDLM Base≤2 NDLM Dead weight0 NDLM+Base container

INTER D.U. Calibration : Laser Beacons - High intensity ( > 20 μJ ) and short pulses (< 1 ns) - Collimated beam -> Diffusion device needed INTER D.U. Calibration : Laser Beacons - High intensity ( > 20 μJ ) and short pulses (< 1 ns) - Collimated beam -> Diffusion device needed

 Titanium Container  Anti-Biofouling System  Connector  Slow Control Inteface  Sequence of Commands  Photodiode Signal  LASER  Attenuator

The Laser Beacon source is a diode pumped Q-switched Nd-YAG Teem Photonics laser which produces very short light pulses, ~ 400 ps (FWHM), of high intensity (~20 μJ) and at a wavelength of 532 nm (green). It is housed in a titanium container and can be fixed to numerous seafloor structures (for example secondary junction boxes or detection unit sea floor anchors) The Laser Beacon source is a diode pumped Q-switched Nd-YAG Teem Photonics laser which produces very short light pulses, ~ 400 ps (FWHM), of high intensity (~20 μJ) and at a wavelength of 532 nm (green). It is housed in a titanium container and can be fixed to numerous seafloor structures (for example secondary junction boxes or detection unit sea floor anchors)

GLASS ROD TITANIUM COVER MECHANICA L FIXING DIFFUSE R LASER BEAM -A voltage controlled optical attenuator -A linear polarizer followed by a liquid- crystal retarder and a second linear polarizer. -Since the light from the Laser Beacon is linearly polarized, the attenuation can be achieved with only one linear polarizer. -A voltage controlled optical attenuator -A linear polarizer followed by a liquid- crystal retarder and a second linear polarizer. -Since the light from the Laser Beacon is linearly polarized, the attenuation can be achieved with only one linear polarizer. The laser head has a built-in photodiode that provides the exact time of the laser light emission

TO BE TESTED few lasers would be enough to cover all detector

How will affect the LED light to the OM PMT? It does not damage the PMT The detected light is good enough for giving the temporal reference How will affect the LED light to the OM PMT? It does not damage the PMT The detected light is good enough for giving the temporal reference Measured in air Measured in water

How will affect the LED light to the OM PMT? It does not damage the PMT The detected light is good enough for giving the temporal reference How will affect the LED light to the OM PMT? It does not damage the PMT The detected light is good enough for giving the temporal reference RMS ~ 1 ns Trigger signal w.r.t. OM signal

Codes for the “TimeSlices” data format have to be optimized for the analysis. However first information is obtained from GuiBeacon code.

The feeding voltage of the NB is well correlated wit the OM rates At 280 – 300 meters light is observed Short runs (4 min) in ANTARES trigger setup give good statistic The feeding voltage of the NB is well correlated wit the OM rates At 280 – 300 meters light is observed Short runs (4 min) in ANTARES trigger setup give good statistic It is confirmed? It’s enough? Final analysis on photon and charge of the hits has to be performed Does the higher frequency of KM3NeT strongly reduce the duration of runs (~sec)? It is confirmed? It’s enough? Final analysis on photon and charge of the hits has to be performed Does the higher frequency of KM3NeT strongly reduce the duration of runs (~sec)? The Nanobeacon seems not to saturate/damage the OM

The Nanobeacon prototype was successfully tested on the CEA CLB: 1.- The I 2 C communication worked properly 2.- The internal trigger worked properly 3.- The external trigger provided through the CLB worked properly 4.- The geometry of the Nanobeacon was tested and some minor changes in the position of the holes was agreed. 5.- It was also agreed to change the trigger connector to a coaxial lemo in order to reduce the induced noise. The Nanobeacon prototype was successfully tested on the CEA CLB: 1.- The I 2 C communication worked properly 2.- The internal trigger worked properly 3.- The external trigger provided through the CLB worked properly 4.- The geometry of the Nanobeacon was tested and some minor changes in the position of the holes was agreed. 5.- It was also agreed to change the trigger connector to a coaxial lemo in order to reduce the induced noise.

Some Nanobeacons will be integrated in the Nemo Tower, in order to test: the integration inside of an OM glass sphere the computations of the range of the light as simulated using the specifications of the angular distribution of the light emitted by the LEDs and measurements the communications between the main control board and light emitting sources the reliability of the electronics in general Some Nanobeacons will be integrated in the Nemo Tower, in order to test: the integration inside of an OM glass sphere the computations of the range of the light as simulated using the specifications of the angular distribution of the light emitted by the LEDs and measurements the communications between the main control board and light emitting sources the reliability of the electronics in general

The integration of a Laser Beacon in NEMO Tower is under study. A Laser Beacon was built (with integrated the acoustic system) High pressure tests were performed A stand-alone rechargeable battery system was developed Supports have been built, in order to mount the Laser Beacon on the anchor A real setup test and corresponding validation by NEMO people is needed The integration of a Laser Beacon in NEMO Tower is under study. A Laser Beacon was built (with integrated the acoustic system) High pressure tests were performed A stand-alone rechargeable battery system was developed Supports have been built, in order to mount the Laser Beacon on the anchor A real setup test and corresponding validation by NEMO people is needed

Track reconstruction requires the knowledge of the relative arrival times of the Cherenkov photons at the PMTs and therefore only their time offsets. The time elapsed between the incidence of a photon on the photocathode of the PMT and the time stamping of the associated signal must be determinated. The main goal of the clock system is to provide a common signal to synchronize the readout of the OMs In situ measurement of the time offsets of all the OMs is performed with the Optical Beacon (OB) system (two kind of complementary devices): - LED beacons that emit blue light (470 nm) - Laser beacons that emit green light (532 nm) Track reconstruction requires the knowledge of the relative arrival times of the Cherenkov photons at the PMTs and therefore only their time offsets. The time elapsed between the incidence of a photon on the photocathode of the PMT and the time stamping of the associated signal must be determinated. The main goal of the clock system is to provide a common signal to synchronize the readout of the OMs In situ measurement of the time offsets of all the OMs is performed with the Optical Beacon (OB) system (two kind of complementary devices): - LED beacons that emit blue light (470 nm) - Laser beacons that emit green light (532 nm)

Time residuals should be characterized by mean values well centered at zero 24 storey 2 storey 9 storey 15 storey 21 Line 2 However, there is a linear delay due to the combination of Early photon + Walk effect Deviations from the straight line are used for calibration OM 0OM 1OM 2 storey LOB-ARS (ns)

LED mode l Rise tim e (ns) (n m) FWH M (º) Inten sity (pJ) AVAGO CB AVAGO CB NSPB5 00S AVAGO AB LED candidates have been tested in the laboratory, and four models were preselected. Following the recovery and redeployment of ANTARES line 12, these new models were incorporated in one of the LED optical beacons of the line and tested in situ. The selected LED was the NSPB500S, due to the higher range end the angular distribution. Based on these results, several NanoBeacons will be integrated in the forthcoming deployment of a pre-production KM3NeT DU LED candidates have been tested in the laboratory, and four models were preselected. Following the recovery and redeployment of ANTARES line 12, these new models were incorporated in one of the LED optical beacons of the line and tested in situ. The selected LED was the NSPB500S, due to the higher range end the angular distribution. Based on these results, several NanoBeacons will be integrated in the forthcoming deployment of a pre-production KM3NeT DU