Yampa River Structures Project WSRA grant application 2nd reading June 15, 2011 Prepared by Friends of the Yampa.

Slides:



Advertisements
Similar presentations
A sampling of stream and watershed improvement projects in the Lower Gallatin watershed.
Advertisements

Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Tour of Five Small Flood Control Dams in Iowa and Nebraska Rehabilitation Needs of Aging Small Flood Control Dams.
The Entergy facility is a boiling water reactor with a rated core thermal power level of 1912 MW, providing a gross electrical output of 620 MW. The facility.
1 Section 3 Program Kansas City, Missouri. 2 Background Information Department of Housing & Community Development was dismantled Prior to 2005.
Cuyahoga County Department of Development 2010 Municipal Grant Seminar June 4, 2009 Middleburg Heights Community Center.
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
CITY OF SAN MARCOS/TEXAS STATE UNIVERSITY 2015 WORK PLAN BUDGETED CONSERVATION MEASURES.
US Army Corps of Engineers BUILDING STRONG ® RIVER RESOURCES ACTION TEAM BOAT TRIP Upper Mississippi River (Pools 24, 25, and Mel Price) St. Louis District.
Mordecai Lincoln Dam & Hunters Pond, Scituate, MA
Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM Presented.
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
1 FEMA Flood Insurance Rate Map Update FEMA Public Meeting October 22, 2009.
Stevens-Rugg Brook: Diversion Structure Improvement Alternatives St Albans, Vermont.
Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Lake Como Rehabilitation City of Bloomer Joseph M. Dorava, PE - Vierbicher Associates Bloomer Community Lake Association and Bloomer Rod and Gun Club Public.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Tampa Comprehensive Plan Housing Element Affordable Housing Policies.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
NRCS Watershed Rehabilitation
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Blind Pass Project Update Bayous Preservation Assoc. February 9, 2011.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Noe Valley Town Square Proposed New Park Property Acquisition Presentation to the Recreation and Park Commission April 18, 2013.
Lakes District At Louisiana State University CAP 206 Project US Army Corps of Engineers New Orleans District.
Channel Modification Washington Dept. Forestry, 2004, Channel Modification Techniques Katie Halvorson.
Broadview Second Access. Parlette Annexation What has changed? Parlette has asked for reconsideration –Recitals in agreement are not operative provisions.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
Watercourse DPA District of North Vancouver Streamside DPA Development Permit Area for the Protection of the Natural Environment: Streamside Areas Public.
University of Kentucky College of Agriculture Landscape Architecture Franklin-Simpson County Greenways enhance the visual character and walkability of.
Lower Taylor Creek Restoration Project Property Acquisition Seattle City Council - Seattle Public Utilities and Neighborhoods Committee June 9, 2015.
1 Three Rivers Levee Improvement Authority Follow-up on Twelve Compliance Issues Raised on February 26, 2007 March 22, 2007.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Request for Environmental Services (RES) Missouri Local Programs How to Complete The Request for Environmental Services.
August 2013 Coastal Incentive Grant Program Cycle 17 Highlights Planning for Cycle 18 Coastal Advisory Council Annual Meeting July 31, 2014 Georgia Department.
Channel Rehabilitation Projects TAMWG - June ‘04 Trinity River at Hocker Flat 1/16/2003.
San Francisco Ocean Beach-Great Highway Erosion Control Project.
Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Brazoria County RESTORE Act Projects
Design and Implementation of Large Wood Structures at Twelvemile Creek Prince of Wales Island Tongass National Forest The Nature Conservancy TEAMS Enterprise.
University of Washington Institute for Hazards Mitigation Planning and Research Visions for Kimball Creek.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
Detroit 0% Interest Home Repair Loan Program 1 CITY OF DETROIT HOUSING & REVITALIZATION DEPARTMENT Program grant sub-recipient overseeing loan capitalization.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
1% Sales Tax Commission Board Meeting June 3, 2015.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
US Army Corps of Engineers BUILDING STRONG ® Miles City, Montana Section 205 Gwyn M. Jarrett - Project Manager Omaha District April 27, 2016.
Back River Flooding and Shoaling Citizens Committee Back River Flooding and Shoaling Citizens Committee August 15, 2007.
Downtown Stockton Marina & Joan Darrah Promenade July 29, 2008 Guaranteed Maximum Price for the Construction of the Downtown Marina and Joan Darrah Promenade.
Morelli Park Reconstruction and Expansion Project Public Hearing and Award of Construction Contract Stockton City Council and Stockton Redevelopment Agency.
Update on the Richland Creek Reservoir and Water Supply Program Paulding County, Georgia Board of Commissioners Workshop Briefing May 26, 2015.
Implementation of Housing Element Update of Housing Element City Council Meeting Tuesday, September 24, 2013.
Minsi Lake Dam Public Meeting October 3, 2016 Paul Urbanik, P.E.
Four Winds Condominium Association August 2, 2017
The Oakton Condominium Association September 12, 2017
Development Charge Public Meeting October 23, 2017
~ GARDINER WATERFRONT ~
Brian murphy and Emily valenzuela
Measure A Financial Oversight Committee August 7, 2013
Kootenai River Habitat Restoration Project 2017 Update
Water Quality Protection Zones
Meadow Lake Boulevard Street Extension Project
Stream Management Implementation Program Schoharie Watershed Advisory Committee Meeting October 24th, 2018.
SHOAL CREEK WATERSHED ACTION PLAN
Presentation transcript:

Yampa River Structures Project WSRA grant application 2nd reading June 15, 2011 Prepared by Friends of the Yampa

How much is being requested?

Who are the Friends of the Yampa  501(c)(3)  Est  Partner with City to build river features/projects in past.  Host annual Yampa River festival  Organize river clean ups, speaking engagements and participate in policy efforts.

What is the Yampa River Structures Project?  Regrading and replanting riparian zones  Increase habitat for fishery  Creating formalized river access points  Removing debris from the river  Repair/improve/enhance existing recreational structures  Installing a new recreational structure

What we’ve done since we April  Met with project engineer and excavator and have updated bids  Met with City of Steamboat Springs, Parks & Recreation and Division of Wildlife for review  Talked with Todd Dougherty at the CWCB regarding this grant for feedback which we’ve added into the grant application  Continued fund raising with positive results

Purpose of grant application?

Objectives of work  To enhance/preserve the natural character of the Yampa River in downtown Steamboat Springs through river rehabilitation improvements  To enhance the value of the River as a community amenity through access points and recreational use opportunities

How to reach the objectives  Contract with: –Boulder based, Recreation Engineering and Planning (REP) to design and engineer the work addressed –Steamboat Springs based Nordic Excavation (NE) to carryout excavation and build out of structures and identified habitat/river work

Task 1  Rebuild what is now a “sub-optimal” recreational feature [4j]  Improve and formalize the existing access point to the feature [4i]  Rehabilitate the eroding bank near the access by improving the riparian buffer zone [4i]  Place additional boulder cluster downstream of feature to increase fisheries habitat.  Includes preliminary design, permitting and final design

Design & Engineering Estimates Phase #DescriptionItem Total Price 1 Phase I (4i & 4j): Preliminary Design, permitting, final design. This includes base- mapping for a certain reach, hydraulic (floodplain) analysis for the reach, and permitting.$7, Yampa River Structures Project Construction Estimates Phase #DescriptionItem Total Price 1 Create formalized access point to river [4i]. Rehabilitate the eroding bank near the access by improving the riparian buffer zone [4i]. Phase I$5, Rebuild sub-optimal recreational feature [4j]. Repair existing feature with an updated configuration that meets the needs of the recreational intent of the feature. Place additional boulder cluster downstream of feature to increase fisheries habitat. Phase I$7,500.00

Task 2  Create a formalized access point, regrade and replanting of riparian buffer [4h]  Modify the recreational structure known as the Z-Hole which is minimally effective and traps sediment [4g]  Remove, rebuild and enhance the recreational structure identified as the Orange Peel Wave which currently has limited recreational value [4f].  Place additional boulder cluster downstream of feature to increase fisheries habitat.  Includes preliminary design, permitting and final design

Design & Engineering Estimates Phase #DescriptionItem Total Price 2 Phase II (4g & 4f & 4h) Preliminary Design, permitting, final design. This includes base-mapping for a certain reach, hydraulic (floodplain) analysis for the reach, and permitting.$7, Yampa River Structures Project Construction Estimates Phase #DescriptionItem Total Price 2 Add rocks to river right bank to stop erosion. Use flat canyon city rock to build new stairs for access point. [4H] $21, Repair, modify, & enhance recreational structure known as Double Z Wave. Includes rock acquisition & hauling, general excavation, placement, backfill, and pool excavation [4g] Phase II $8, Repair, modify, & enhance recreational structure known as the Orange Peel Wave. Includes rock acquisition & hauling, general excavation, placement, backfill, and pool excavation [4f] Phase II $7,000.00

Task 3 – final task  Concrete debris is scattered in the channel and along the northern (river right) bank of the river. It is a safety concern as well as aesthetic detriment and will be removed [4e]  Install and additional boating feature. There is sufficient space and channel gradient to accommodate it in this area [4d]. This would reduce high level of use at other play features and would improve overall recreational benefits to Yampa River Boating Park.  Place additional boulder clusters in select areas throughout river section to improve fisheries habitat.  Includes preliminary design, permitting and final design

Design & Engineering Estimates Phase #DescriptionItem Total Price 3 Phase I (4e & 4d): Preliminary Design, permitting, final design. This includes base- mapping for a certain reach, hydraulic (floodplain) analysis for the reach, and permitting.$7, Yampa River Structures Project Construction Estimates Phase #DescriptionItem Total Price 3 Removal of concrete debris lining bank creating a recreational safety hazard and aesthetic detriment [4e]. Phase III $2, Install recreational boating feature. Includes design, engineering, & rock acquisition & hauling, general excavation, placement, backfill, & pool excavation [4d]. Phase III $28,000.00

Timing  First reading April 20 th RT meeting  Second reading, tonight June 15th  With approval, send in to CWCB within month which is 60-days prior to September CWCB meeting Next Steps  Motion of support from Roundtable tonight  Pen a letter from Chair to CWCB  Submit Yampa River Structures Project grant with letter from Chair to Todd Dougherty at the CWCB

Questions?