H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.

Slides:



Advertisements
Similar presentations
Solomon William KAMUGASA
Advertisements

MDI alignment progress The pre-alignment of the QD0’s Niels van Bakel, Bram Bouwens, Hubert Gerwig, Lau Gatignon, Harry van der Graaf, Henk Groenstege,
Metrology and pre-alignment of the components of CLIC in the PACMAN project S. W. Kamugasa, V. Vlachakis CLIC Workshop January 2015 CERN, Geneva,
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
LHC Collimator Survey Train Concept / Development / Status Patrick Bestmann CERN BE/ABP/SU IWAA /09/2010 Remote Controlled Measurements in the LHC.
H. MAINAUD DURAND CLIC ACTIVE PRE-ALIGNMENT SYSTEM: PROPOSAL FOR CDR AND PROGRAM FOR TDR.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
A Laser Based Alignment System for the CLIC project
CLIC. Hélène MAINAUD DURAND| SU pendant LS1 day| | INDICO | page 2 Activities CLIC LAMBDA project (Laser Alignment Multi-Based Design.
Pre-alignment solutions applied to girders 1/19 Sylvain GRIFFET, 06/07/2010.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
PACMAN Workshop OUTLINE Introduction ESR 3.1 Challenges - Stability budget and Precision Mechanical Design - Precision Assembly of MBQ and BPM - System.
1/9 Hélène Mainaud Durand Sylvain GRIFFET, 28/11/2011 BE/ABP-SU/ Adjustment of 4 Drive Beam Quads positions on TM0 CLIC girders EDMS Document No
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
H. SCHMICKLER Alignment challenges for a future linear collider.
H. MAINAUD DURAND, BE-ABP/SU, 23/04/2010 STATUS OF THE CLIC PRE-ALIGNMENT STUDIES.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
CLIC alignment studies OUTLINE CLEX Alignment of the components Impact of beam on sensors readings Long term stability of the supports (girders, DB quad)
Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
D. Missiaen Summaries of the discussion. 2 H. Mainaud Durand The iris diaphragm laser alignment system for Spring 8 storage ring magnets Align multipoes.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
RUDE Vivien With the help of Hélène MAINAUD-DURAND And Mateusz SOSIN BE/ABP/SU CLIC MODULE September 19, 2011 Présentation REPORT OF THE CURRENT TESTS.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
Short range alignment strategy in CLEX and first results CLIC Workshop January 2015 on behalf of : Hélène Mainaud-Durand, Mateusz Sosin Mathieu.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 July 17,
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
SUM ESR ESR ESR ESR ESR ESR ESR ESR (TBC)
Introduction to the PACMAN project A study on Particle Accelerator Components’ Metrology and Alignment to the Nanometre scale OUTLINE Scientific goals.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
CLIC08 Workshop, CERN October 2008 PRE-ALIGNMENT STUDY STATUS AND MODEL FOR THE BEAM DYNAMICS SIMULATIONS TS/SU/MTI Thomas TOUZE Hélène MAINAUD DURAND.
PACMAN : technical objectives Hélène Mainaud Durand.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
CLIC survey and alignment studies 1 CTC meeting, 13 th January 2009 STARTSLIDE CLIC Survey and alignment studies Jean-Pierre QUESNEL, Hélène MAINAUD DURAND.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
H. MAINAUD DURAND Studies on active pre-alignment for the CLIC project.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team oWPS versus cWPS OUTLINE Introduction oWPS cWPS Results of inter-comparison tests
Remote Measurement and Alignment Applications for Survey and Alignment P. Bestmann for BE/ABP/SU
ALIGNMENT OF THE NEW TRIPLETS
Alignment systems in ATLAS: Monitoring of the bedplates
on behalf of the CLIC active pre-alignment team
PACMAN impact on future module design
TEST MODULE WG Cradles for CLIC module supporting system
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Module roadmap to end of 2017
TZ32 tunnel H. MAINAUD DURAND, BE-ABP/SU CTC 07/07/2009.
List of changes and improvements for the next generation CLIC module
Need for Alignment Position of off-momentum proton w.r.t. beam
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Installation plan for LAB modules
Towards a common mechanical interface
Alignment challenges for a future linear collider
Presentation transcript:

H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies

2 OUTLINE Problem and solution proposed Review of the 4 WP created: o Description o Status o Next steps Summary

3 Problem and solution proposed Problem Within +/- 0.1 mm (1  ) Active pre-alignment Beam based alignment Beam based feedbacks Within a few microns Active pre-alignment = Determination of the position of the components in a general coordinate system thanks to alignment systems Re-adjustment thanks to actuators + The zero of each component will be included in a cylinder with a radius of a few microns:  14 µm (RF structures & MB quad BPM)  17 µm (MB quad) Adjustment required: step size below 1 µm Mechanical pre-alignment PRE-ALIGNMENT (beam off)

4 Problem and solution proposed Solution proposed Several components will be pre-aligned on supports or girders: Configuration of girders and supports: Reference of alignment: overlapping reference lines

5 Problem and solution proposed Solution proposed Sensors & actuators are associated to each support / articulation point of girder: As a summary: For CDR:- straight reference = stretched wires - sensors = Wire Positioning Sensors (WPS)

6 Problem and solution proposed Priorities One solution feasible From the performance point of view Compatibility with other systems & integration Affordable Alternative solutions To qualify the first solution To replace the first solution Criteria: -Cost -Easy to integrate -Performant -Easy to install -Easy to maintain -Low sensitivity to environment (humidity, pressure, T°) -High resistance to radiation -High resistance to magnetic fields -Low sensitivity to EMC

7 Problem and solution proposed Description of WP

8 Task 1 : development of sensors and actuators Sensors (introduction) Requirements: Biaxial measurements (radial & vertical) Range : > 3 mm Resolution < 0.2 μm Repeatability: < 1 μm Accuracy: < 5 μm over the whole range 3 solutions under development: cWPS = capacitive Wire Positioning Sensors oWPS = optical Wire Positioning Sensors RasDif / RasNik Strategy in all cases: Validation on individual setups and calibration benches Inter-comparison on two beam modules in lab & accelerator environment

9 Task 1 : development of sensors and actuators Sensors : cWPS Main characteristics (from the manufacturer) Resolution: 0.1 μm Range : +/- 5 mm (along two axes) Repeatability: 1 μm Wire: carbon peek Not so simple to verify these characteristics !!! Improvement of the mechanical interface Development of a very accurate linearity bench Development of an « absolute » bench Trying to have a place with a temperature stable within ± 1ºC Status Linearity depends of the generation of carbon peek wire used: < 5μm over the whole range (better in middle range) Repeatability in installation < 1 μm Interchangeability < 1μm Accuracy not better than 50 µm Next steps Improve linearity and accuracy Perform studies concerning the impact of temperature on the sensor

10 Task 1 : development of sensors and actuators Sensors : oWPS Main characteristics (from the manufacturer) Resolution: < 0.1 μm Range : +/- 5 mm (along two axes) Repeatability: 1 μm Accuracy : < 5μm Wire: Vectran Not so simple to verify these characteristics !!! Development of a very accurate linearity bench Vectran wire used invisible to infra red light and not anti-static Status Qualification of the Vectran wire with irradiation tests Development of a silver plasma coated Vectran wire Development of a very accurate linearity bench to be qualified through CMM measurements Next steps Determine linearity & accuracy of oWPS Develop Rad hard version

11 Task 1 : development of sensors and actuators Sensors : RasChain 2 possibilities: RasNik versus RasDif Status: Test setup to validate RasNik & Rasdif on 4 m First results: jitter and refractive bending of light  thermal shielding needed Preparation of sensors for two beam modules Next steps Installation at CERN and inter-comparison

12 Task 1 : development of sensors and actuators Actuators Validation on individual setups Validation on mock- ups Requirements: Stroke : > 3 mm Resolution < 0.5 μm Repeatability: < 1μm Latest results, next steps: see presentation on cam movers, AWG8, 28/09/11 Development of specific actuators = linear actuators = cam movers

13 Task 2 : tunnel metrology Development of laser based alternatives In collaboration with NIKHEF : o Design of a long range solution RasDif o Inter-comparison in TT1 (140 m) / TZ32 tunnels (500 m)  Relative comparison this autumn LAMBDA project (Laser Alignment Multipoint Based – Design Approach) o First simulations performed: angular orientation & repeatability of shutter should be better than 0.2 mrad & 12 µm, in order to detect a micrometric displacement o Next steps: validate the concept on short distance, without vacuum

14 Task 2 : tunnel metrology Consolidation of stretched wire solution Knowledge of static geoid A theoretical study demonstrated that a determination of gravity field with an accuracy of 0.01 mm over 200 m was possible provided dense astro-geodetic and gravimetric measurements Confirmed by measurements performed every 10 m but extremely fastidious Deflectometer under validation on 12 m, to be extended on 100 m Other issues Modelization of the sag of a stretched wire Impact of air currents How to install easily and rapidly a wire stretched over 500 m?

15 Task 3 : active pre-alignment of two beam modules Validation of the whole strategy of pre-alignment on short distances CMM measurements (dimensional control, pre-alignment of components on their supports, fiducialisation), but STATIC Issue: measure 2 m long objects within a few microns In combination with measurements from Laser Tracker, measurements arm or micro triangulation in lab and tunnels (control after transport, during tests,…) Laser tracker: AT 401 Micro triangulation Romer arm Simulations, based on real performance of AT401: Each fiducial of one module determined at a precision of 6.5 μm Each component of one module determined at a precision of 6.8 μm Next steps Validate the strategy on two beam module prototypes

16 Task 3 : active pre-alignment of two beam modules Validation of the whole strategy of pre-alignment on short distances Design of articulation point, and associated sensors interfaces See presentation by Mateusz Sosin AWG7+ AWG8, 29/09/11

17 Task 4 : active pre-alignment & monitoring in MDI See presentation “BDS alignment progress”, AWG8, 28/09/11

18 Summary 4 WP proposed concerning R&D for Survey and alignment of CLIC : oDevelopment of sensors and actuators oDevelopment of alignment systems on long distance for tunnel metrology oQualification on two beam modules oCase of MDI area Even if feasibility issues are nearly demonstrated, a lot remains to be done: oWorking at the micron level is non standard, and requires to solve a lot of problem before tackling the measurements themselves:  Stable environment conditions  Etalon or references oAmong the priorities:  Improve the performance of different types of sensors and perform their qualification according to pre-defined criteria  Consolidate the stretched wire method  Develop alternatives to qualify the stretched wire and/or to replace it  Validate the fiducialisation strategy on the two beam modules prototypes as well as short range pre-alignment

19 Thank you very much for your attention!