ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March 2011 o IBL ATLAS Italia / Referee CERN, March 2 nd 2010 G. Darbo – C. Meroni INFN / GE – MI Agenda:

Slides:



Advertisements
Similar presentations
IBL Insertable B-Layer
Advertisements

IBL G. Darbo – INFN / Genova Roma, 5 September 2012 o IBL Stato e Richieste 2013 Riunione ATLAS / INFN Referee, 5 September 2012 G. Darbo – INFN.
M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Status of the ATLAS MM project
3 Oct Cost and Schedule Update Craig Ogilvie, Iowa State University Analysis of system risks Update schedule  Critical path.
Reviewer’s Mandate G. Darbo – INFN / Genova Sensor Review, 4 May 2011 o Sensor Review Slides for Jörn Talk IBL Sensor Review Kick-off Meeting CERN, May,
IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March 2010 o IBL interim-MoU Annexes Pixel Extended Institution Board CERN, March 1 st, 2010 NCP.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
ATLAS POH.P, G.D12/5/2009 IBL Update H. Pernegger, G. Darbo (PO 12/5/09) Organization and WG coordinator Schedule Decision Items Organization Tools & Meetings.
IBL Slides G. Darbo – INFN / Genova CSN1, 22 November 2010 o IBL Spare Slides Commissione I – 22 Nov 2010 G. Darbo - INFN / Genova.
Towards a TDR for the IBL G. Darbo - INFN / Genova AW, 24 February 2009 o Towards a TDR for the IBL ATLAS Upgrade Week CERN, 24 February 2009 Session:
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
The ATLAS Insertable B-Layer (IBL) Project C. Gemme, INFN Genova On behalf of the ATLAS IBL COllaboration RD11 Firenze July 2011.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
IBL MoU G. Darbo – INFN / Genova 24 April 2010 o IBL MoU ATLAS Upgrade Week DESY, April 24 th 2010 M. Nordberg, M. Nessi, C. Gößling, H. Pernegger Presented.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Pixel/IBL status and plans A.Rozanov A.Rozanov ATLAS-France
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July 2004 ATLAS Pixel at SLHC G. Darbo - INFN / Genova Talk overview: A table with different High.
1 H. Pernegger/CERNVertex 2011 ATLAS Insertable B-Layer Overview Vertex 2011 Rust, Austria H. Pernegger / CERN on behalf of the ATLAS IBL collaboration.
Reviewer’s Mandate G. Darbo – INFN / Genova Sensor Review, 4 May 2011 o Sensor Review Mandate IBL Sensor Review Kick-off Meeting CERN, May, 4 th 2011 G.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
ATLAS micromegas activities (MAMMA)
IBL - Opening G. Darbo - INFN / Genova AW, 25 February 2009 o IBL Introduction & Project Organization ATLAS Upgrade Week CERN, 25 February 2009 Session:
Reviewer’s Mandate G. Darbo – INFN / Genova Sensor Review, 4 May 2011 o Sensor Review Mandate IBL Sensor Review Kick-off Meeting CERN, May, 4 th 2011 G.
October RRB G. Darbo & H. Pernegger RRB – October 2010 o October RRB Slides for Marzio’s RRB talk CERN, October, 11 th 2010 G. Darbo & H. Pernegger.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July 2009 o IBL kick off meeting summary and issues ATLAS Upgrade Project Office.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
3D sensors for tracking detectors: present and future applications C. Gemme (INFN Genova) Vertex 2013, Lake Starnberg, Germany, September 2013 Outline:
15/09/20111 ATLAS IBL sensor qualification Jens Weingarten for the ATLAS IBL Collaboration (2 nd Institute Of Physics, Georg-August-Universität Göttingen)
Transition to cables Staves Services IP Underside of stave: IBL modules IBL Design.
ATLAS Upgrade Plans ATLAS Hardware – Challenges and Opportunities Norwegian CERN “Town Meeting” Bergen
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
IBL TDR G. Darbo / INFN Genova ATLAS CB – October 2010 o TDR of Insertable B-layer ATLAS CB, October 8 th 2010 G. Darbo / INFN - Genova Indico agenda page:
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
ATLAS Forward Project (AFP) Technical review outcome Review done on (morning) September 2013, see agenda
ATLAS Upgrade Report to the LHCC ATLAS Upgrade Report to the LHCC Phil Allport 25/09/12 Schedule Assumptions Phase-0 –IBL –Consolidation of Many Systems.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
Atlas Upgrade week - November 15 th, 2011M. Raymond – CERN/PH-ADO-PO 1 Introduction Many activities are planned to be performed during the shut down
NSW SG 10 Dec Nov 2014 S. Zimmermann, NSW SG 1.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
ATLAS Pixel Upgrade G. Darbo - INFN / Genova LHCC- CERN 1/76/2008 o Pixel/B-layer Developments LHCC Upgrade Session CERN, 1 / 7 / 2008 G. Darbo - INFN.
Manchester, 24/02/2010 G.-F. Dalla Betta The common floor-plan of the ATLAS IBL 3D sensor prototypes Gian-Franco Dalla Betta (Univ. Trento and INFN) for.
IBL Technical Aspects H. Pernegger / CERN.
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
Francesco Forti University and INFN, Pisa
Communications Share Point Collaborative WS:
Status of CO2 Cooling tests at CERN for Pixel phase 1
Update on ATLAS insertable B-layer
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March 2011 o IBL ATLAS Italia / Referee CERN, March 2 nd 2010 G. Darbo – C. Meroni INFN / GE – MI Agenda:

ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March Outline piani aggiornati IBL e loro approvazione da LHCC implicazioni della nuova schedula sui programmi IBL italiani modifica piano finanziario ed eventuali richieste urgenti alla CSN1

ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March IBL Speed-up Background FE-I4 success push up optimism: Quick move from R&D and prototyping phase to pre-production. LHC shutdown schedule: If we cannot make for 2013 is it still interest to have IBL in 2017, 2018? nSQP project If Pixel detector is taken to surface IBL installation is simplified. IBL community promptly reacted and made aggressive 2013 IBL installation schedule: Almost 2 years shorter than in TDR, no no explicit contingency in the schedule Some technology critical solutions need to be proven quickly Pixel Extended IB (IBL) endorsed the challenge of the new schedule IB is aware of the risks that any major technical delays can become a show stopper IB encourage the whole IBL community to focus strongly to the project with the support of all ATLAS. Go to definite MoU after June sensor review. Distribute to FA’s in summer. Project presented to LHCC in Sept.2010, answer to referee Dec Expected approval soon (no news, ATLAS management triggered for an answer).

ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March TDR / Speedup Schedules Speed up schedule Very aggressive in module – stave line fast exit from prototyping to pre- and production Success of FE-I4 pushes for minimum changes for final version (9/6/2011) Sensor pre-production of conservative and innovative designs started before decision and qualification of prototypes (Planar n-on-n and 3D). Sensor review and decision mid June Working on other speed ups No contingency built in

ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March IBL plan for 2013 : Key milestones MilestoneDate Sensor & FEI4 :FEI 4 V2 submission in June Preproduction sensors at IZM / Review Production batch 1 sensors (equivalent to installed) Production batch 2 sensors (spare for total of >2x installed) Sept 21, 2011 / June 2011 Nov 16, 2011 April 6, 2012 ModulesThin modules until July First module ready for loading 270 DC/540 SC modules completed All modules completed (including spares) Jan 30, 2012 June 28, 2012 Oct 4, 2012 StavesFlex until June & “Stave 0” until Oct First production flex batch available First 5 staves completed All bare staves + flex completed and qualified Dec 2, 2011 April 20, 2012 July 2, 2012 All staves (14 BL quality + spares) loaded and qualifiedNov 26, 2012 Integration Beam pipe received Integration staves to beam pipe completed in SR1 Final IBL surface tests completed and ready for installation August, 2012 April 30, 2013 July 1, 2013 Important for X0! Delays with this will delay the stave completion Key to start first IBL final modules Key to have production modules in time Demonstrate that staves fully work Have all staves in hand when we start intervention Install!

ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March ATLAS EB Support it, but keep Performance Speed up presented to ATLAS EB (25/2/2011) ATLAS EB supports it. It will be presented to ATLAS Week and CB next Friday. Speed up, but not sacrifice detector performance. Maintain TDR requirements Material budget < 1.54 % of X 0  Action: has put in place an “X 0 ” task force Critical: Module thinning qualification and aluminium Flex Hibrid Geometrical acceptance in Z > 97.4% … Remember that IBL will stay till HL-LHC (2021…) Integrated luminosity: 330 fb -1 (it will be more than before) NIEL dose: 5x10 15 n eq /cm 2, TID: 250 Mrad Peak luminosity: 2.2 x cm 2 s -1 Work on speedup schedule, but have checkpoints (end of 2011, …): Verify that IBL performance and physics reach are better with IBL than without: 2014 ÷ 2017 and 2018 ÷ … running periods. Watch status of milestones, specially on module and stave advancement Check if keeping schedule compromise performance.

ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March Sensor Pre-production Sensor pre-production CNM (3D): started first batch – processing 36 w, delivery 30/10/2011, second batch will start 4 weeks after the first one we can buy if we want). Masks same as prototype. FBK (3D): started first batch. Second batch is starting (we can buy if we want). Delivery of both batches end of June. Mask also the same as prototype and same wafer floorplan as CNM. CiS (Planar): mask layout finalizing. Thinning started (4-6 w), processing of wafers (16-18 w) will start (15/3/11) and pre-prd completed 31/7/11. Production For planar can be finished by the end of this year if started by summer For 3D, depend on yield (number of batches) – In discussion with CNM and FBK production plans meeting schedule. Constraints are 36 w (CNM)/ 20 w (FBK) FEI 4

ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March Resources for Speed-up (M&O-B/Project) Resource planning Spending profile: 1MCH more in Cash flow buffered by ATLAS Resources at Institute level: Cash flow for local orders Manpower re-planning Large common orders timeline Sensor Pre-production – 28/2/2011 (240 kCH) FE-I4 – 15/5/2011 (600 kCH) Sensor production – 30/6/2011 (>250 kCH) Bump-bonding (30/9/2011) (>500÷650 kCH, need to know) 1.05 MCH

ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March Impact on INFN Funding profile Common orders Note: the Sensor pre-production (36k€) is urgent for paying the contract with FBK (already started the work) Local procurements: Discussion started on Italian responsibilities: manpower + fund profile Need to see what we need with urgency (spring) INFN committed to: Bump-bonding qualification (MI/GE) -> urgent Sensors (UD) Stave mechanics (MI) PP2 (MI) -> cost increase Flex & Module production (GE) -> criticality in the flex, aggressive schedule for modules ROD (BO/GE) -> increase manpower Power supply procurement