Laboratoire de Physique des Plasmas 20 TH CAA CROSS-CAL M EETING CLUSTER-STAFF REPORT 15-16 O CTOBER 2014 G ÖTTINGEN The STAFF Team Laboratoire de Physique.

Slides:



Advertisements
Similar presentations
Rosetta Magnetic Field PDS Review B. J. Anderson.
Advertisements

Parameters to choose the CCD The CCD test bench *Temperature range : -55 to +40°C. *Stabilization : < 0.05°C/hour. *5 temperature probes : CCD and electronics.
Status of data production and delivery. 2 17th CAA CrossCal Meeting – 25 March Status of dataset delivery 2.Status of data production pipeline.
CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,
STAFF Report. 1.Status of data delivery 2.Delivery Plan 3.Status of data pipeline 4.STAFF/FGM cross calibration 5.Conclusions 2 15th Cross-Calibration.
STAFF-SC / FGM Comparison I. Spectrograms comparison II. Average spectra comparison III. Wave Forms comparison IV. Noise Level Conclusions Cross_Calibration.
Virgo Open Data Plans October 27, 2011 Benoit Mours (LAPP-Annecy) On behalf of the Virgo Collaboration.
Software Engineering.
FGM report 10 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Chris Carr, Tim Oddy, André Balogh I mperial College London November 2009.
FGM report 9 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Paul French, Chris Carr, Tim Oddy, André Balogh I mperial College London March.
1 Scientific interests in cusp wave phenomena L aboratoire de P hysique des P lasmas Patrick ROBERT, CNRS / LPP 1.The hybrid AC/DC magnetometer team 2.Measurement.
11 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011 STAFF CAA products & Cross-Calibration activities Patrick ROBERT & STAFF Team 5) STAFF-SC CWF.
1 10th CAA Cross-Calibration meeting, Paris, 2-4 November 2009 STAFF/SC cross-calibration activities Patrick ROBERT, C. Burlaud & STAFF Team 2) The Calibrated.
0. Short reminder of STAFF-SC and STAFF-SA experiment I. status of open action items II. status of data production III. status of calibration IV. status.
CAA 12th Cross-cal meeting Toulouse Oct STAFF status report N. Cornilleau-Wehrlin,P. Robert, V. Bouzid, and STAFF team.
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
CAA 9th Cross-Calibration Workshop, Cambridge, England, 25th-27th March CLUSTER / STAFF ● status of calibration and archiving activities ● archiving.
CLUSTER/STAFF DATA at CAA. 11th Cross-Calibration Meeting, 7-9th April 2010, Goslar. C. Burlaud, P. Robert, O. Santolik, N. Cornilleau-Werhlin, P. Canu,
STAFF Report Patrick Robert, Rodrigue Piberne & STAFF team.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 GERB Ground Segment B.C.Stewart RAL.
1 12th CAA Cross-Calibration meeting, Toulouse, Oct 2010 STAFF/SC Calibration & Cross-Calibration activities Patrick ROBERT & STAFF Team, LPP 2)
Van Allen Probe Data Pathways SWG, September 23, 2014 D. G. Sibeck NASA/GSFC.
IPC Working Group 34 - Updates on IT support to the IPC Geneva November 6, 2015 Patrick Fiévet Head of IT Systems Section.
1 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011 STAFF CAA products & Cross-Calibration activities Patrick ROBERT & STAFF Team 5) STAFF-SC CWF.
STAFF Report Prepared by R. PIBERNE. 2 1.Status of software development 2.Status of Experiment Calibration / Cross Calibration 3.Status of dataset delivery.
CAA/CFA Meeting | CFA Team | ESAC | Octiber CFA Under Development CAA/CFA Meeting ESAC, Oct 11 th 2011 European Space AgencyCFA Team.
WHISPER action items Gábor Facskó, Jean-Gabriel Trotignon,Séna Kougblénou, Xavier Vallières, Guillaume Lointier LPC 2 E/CNRS, Orléans, France 10th CAA.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI SAM New Requirements from the SA1 Survey.
PEACE DAA Status Andrew Fazakerley, Iryna Rozum, Andrew Lahiff, Branislav Mihaljčić & the PEACE ops team 5 November 2009, DAA meeting, Paris, France MSSL.
1 CAA 2009 Peer Review, Jesus College, Cambridge, UK, March CAA Peer Review: Selected Recommendations.
DAA PEACE Status A. Fazakerley, B. Mihaljčić, I. Rozum, A. Lahiff, G. Watson, D. Kataria UCL Department of Space and Climate Physics Mullard Space Science.
ISIS Project Status Report May 18, 2006 Prepared by MAXIMUS, Inc Education Systems Division for the ABT Committee.
CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu EDI Status of Calibration and Archiving Activities.
CAA PEACE Status A.N. Fazakerley, I. Rozum, B. Mihaljcic.
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
Cluster Active Archive Status of DWP Activities Simon Walker, Keith Yearby, Hugo Alleyne ACSE, University of Sheffield.
FGM Report: Extended Mode Processing 22 nd Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox, Cary Colgan (summer.
Double Star Active Archive - STAFF-DWP Data errors and reprocessing Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin LPP.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
10th CrossCal Workshop, L'Observatoire de Paris, France Cluster Active Archive Status of DWP Action Items Simon Walker, Keith Yearby, Hugo Alleyne ACSE,
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
Laboratoire de Physique des Plasmas C ROSS C ALIBRATION STAFF R EPORT TH M ARCH 2015 L EIDEN Prepared by R. Piberne & R. Katra Laboratoire de Physique.
CIS Action Items 10 th Cross-Calibration Workshop Observatoire de Paris, Nov
1 CAA 21 th Cross Calibration Meeting, Leiden, th Mar 2015 CAA Cross Cal Meeting Mar 2015 Automated Pipeline Processing.
8th Cross-calibration Workshop CIS data delivery report Kinsale – October 2008.
FGM Report 17 th Cross Calibration Workshop Chris Carr, Elizabeth Lucek, Patrick Brown, Leah-Nani Alconcel, Barry Whiteside, Tim Oddy, Peter Fox, André.
Double Star Active Archive - DWP/STAFF 1 Double Star Active Archive STAFF/DWP Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin.
1 11 th CAA Cross-Calibration Workshop, Hotel die Tanne, Goslar, Germany 7-9 April 2010 CAA 11 th Cross-Calibration Workshop Hotel die Tanne, Goslar, Germany.
WHISPER report whisper team 16th CAA Cross-Calibration workshop Toulouse, France, 7-8 November 2012 CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE Laboratoire.
MSSL * A.N. Fazakerley, I. Rozum, N. Doss, B. Mihaljcic & the PEACE ops team PEACE CAA Action Items Status 11 th CAA Cross Calibration Meeting, 7 – 9 April.
CAA PEACE Status PEACE Operations Team Presented by Iryna Rozum MSSL Cross-Calibration Meeting, Uppsala, Sweden, April 2011.
1 CAA 20 th Cross Calibration Meeting, MPS, Gottingen 16th Oct 2014 CAA Cross Cal Meeting Oct 2014 Pipeline Automation Chris Perry.
WEC meeting TED status and WEC timing.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
DAA Status/Progress B. Mihaljčić, A. Fazakerley, N. Doss, G. Watson UCL Department of Space and Climate Physics Mullard Space Science Laboratory 18 th.
21st CAA Cross Calibration Workshop Leiden, March 2015 WHISPER report WHISPER team LPC2E/CNRS.
FGM Report 21 st Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox Imperial College London 24 March 2015.
14 th CAA Cross-calibration Workshop CIS archiving activities York October 5-7, 2011.
Double Star Active Archive - STAFF- DWP 1 K.H. Yearby, S.N. Walker, M. Balikhin University of Sheffield.
Cluster Active Archive
3 COMPONENTS OF MAGNETIC WAVES UP TO 4 kHz
Cluster Active Archive – Wideband data BM2 mode
1. Introduction: general information
20th CAA/DAA Cross Calibration Meeting
CAA-OR (End of Phase 1) CAA DWP Operations Review
H. Rème, I.Dandouras and A. Barthe IRAP, Toulouse, France
Cluster Active Archive 1st Operations Review May 16-17, 2006
Annual Report of the DWP Experiment 9th CAA Operations Review
10th CAA Operations Review Annual Report of the FGM Experiment
Presentation transcript:

Laboratoire de Physique des Plasmas 20 TH CAA CROSS-CAL M EETING CLUSTER-STAFF REPORT O CTOBER 2014 G ÖTTINGEN The STAFF Team Laboratoire de Physique des Plasmas Ecole Polytechnique, France

Plan 1.Team 2.Software Status 3.Deliveries 4.Calibration: on going 5.Calibration Issues 220th CAA Cross-Cal Meeting October 2014

STAFF Operation Team LPP - Palaiseau – P. Canu (PI), N. Cornilleau (deputy PI), – P. Robert retired on May 2014 – V. Bouzid now head of computer department at LPP Still 40% on CSDS software implementation at LPP – K. Musatenko, Cnes contract,operations, validation, CSDS production – R. Piberne CAA engineer obtained permanent position at LPP Will work 50% of time for Cluster, mainly CAA – Ralph Katra new CAA engineer since September 1 Still training on data production – Software development LESIA -Observatoire de Meudon (Staff-SA) - O. Alexandrova - Q. N. Nguyen. Institute of Atmospheric Physic, Prague - O. Santolik, B. Grison With great help of Keith Yearby and DWP team at Sheffield 20th CAA Cross-Cal Meeting October 20143

1. Status of software development STAFF-SC DWF, CWF-GSE,CWF-ISR2,CS, Graphics, HK All production software completed and running STAFF-SA L2 - Upgrade to new calibration tables and data free from negative values due to overflow in the auto products: completed and tested - Staff status included and on-board calibration data removed Last checks underway to validate status: small timing discrepancy between SC an SA value, now understood PPP: Small software upgrade to exclude periods without FGM data 420th CAA Cross-Cal Meeting October 2014

CAA Delivery Despite non optimal hardware configuration and team changes most of the planned activities and deliveries for this year have been fullfilled STAFF-SC: – Calibrated Waveform GSE fully delivered ( ) – Production chain for CWF in ISR2 completed and tested, production underway, delivered – Calibrated spectra reprocessed with upgraded production chain, fully delivered ( ) – Digital Waveform reprocessed and delivered ( ) Move common status to caveats STAFF-SA: – L2 up to Reproduction of full data set (PSD,SM,AGC) is a bit late, but has low priority. Should run in coming weeks after status validation – PPP up to Will be reproduced with upgraded FGM files and excluding periods without FGM 520th CAA Cross-Cal Meeting October 2014

3. Status of dataset delivery Product DWFDDDDDDDDDDDDDP CWF_ISR2DDDDDDDDDDDDDP CWF_GSEDDDDDDDDDDDDDP CSDDDDDDDDDDDDDP SC_SPECTRODDDDDDDDDDDDDP AGCDDDDDDDDDDDD PSDDDDDDDDDDDDD SMDDDDDDDDDDDD PPPDDDDDDDDDDDDD HKDDDDDDDDDDDDD CAVEATS DATASETS NOTSRPDDDDDDDDDDDD PSDNEGDDDDDDDDDDDD UNDEFINED_MFADDDDDDDDDDDDD CALIBRATIONDDDDDDDDDDDDD D = delivered [number indicates version] P = partial delivery R = (ongoing) reprocessing 620th CAA Cross-Cal Meeting October 2014

4. Delivery Plan Year of delivery Product SC DWF-End 2014 – 1st half 2015 SC Complex spectra-End 2014 – 1st half 2015 SC Images-End 2014 – 1st half 2015 SC CWF GSE-End 2014 – 1st half 2015 SC CWF ISR2-End 2014 – 1st half 2015 SA AGC / PSD / SM/ BE products New version st half 2014 End 2014 – 1st half 2015 SA Polarisation/Propagation1st half 2014End 2014 – 1st half 2015 House Keeping plots th CAA Cross-Cal Meeting October 2014

Calibrated data: On going 20th CAA Cross-Cal Meeting October The GI article CLUSTER STAFF search coils magnetometer calibration comparisons with FGM is published and available here: From Progress meeting: Many minor anomalies in delivered CWF – CS files, due to - Bad telemetry, bad status - Telemetry holes Which induced missing CWF,CS or non usable data These anomalies are seldom and short period. Bad data will be removed from CAA and reason for missing calibrated data will be justified in STAFF documentation

Calibration issues: Next step 920th CAA Cross-Cal Meeting October 2014 We begin to receive feedback from users of calibrated data Spurious lines ? Spin not fully removed Differences found between old calibrated data (sometimes published) and the new improved Calibrated WaveForm (CWF) …… Answers to these standard questions should be included in CAA documentation - Provide more details on the limit of use - Provide examples on the impact of the parameters used in CWF production and possible misinterpretation - Provide suggestions for getting better quality data with respect to studies

Calibration issues: next step -2 Most of the questions raised by CWF users were expected – Search-coils transfer function is frequency dependant and data are affected by strong spin induced signal coming from B – Signal processings used in calibration (window, FFT) induce edge effects – Producing good quality calibrated data requests stationarity (ie B vector,EM field) over the period of analysis (ie many spins) which is not typical of some Cluster studies. – New CWF significantly reduced edge effects but – The parameters used to produce CWF (window size for despin, filtering, …) is a compromise which will not fulfill all users-studies needs 20th CAA Cross-Cal Meeting October

Calibration issues: next step - 3 Initial proposal of STAFF team to CAA was to provide DWF (uncalibrated) and calibration software Provision of Calibrated Wave Form was a known compromise We have to overcome CWF limits by - Including clear warnings in the documentation – Providing our calibration software to CAA-CFA Patrick Robert suite of Fortran routines – Need some effort to implement for a standard user Consider running these sofware at CFA 20th CAA Cross-Cal Meeting October