Gamma Irradiation Facility RFortin_163726 PH-DT-DI GIF Users Meeting April 30, 2009 Richard G. Fortin 1 / 10 Upgrading to a GIF++

Slides:



Advertisements
Similar presentations
Overview of the GlueX Tagger and Photon Beamline..
Advertisements

Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Discussion on cosmogenic taggers With some thinking by : M.Weber, F.Pietropaolo, A.Guglielmi, M.Ne.
Status at DORIS Hall Argus was removed by end of march Argus Parts (except 4 heavy pieces) shipped to Hall 1 Rails of electronics hut have to be extended.
Active Collimator Test in Hall B Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting September ,
Beam Position Stabilization Using an Active Collimator in Hall D at Jefferson Lab Richard Jones, University of Connecticut, for the GlueX collaboration.
GLAST LAT Project Test Beam Meeting, June 6, 2006 S. Funk 1/6 PS Positron Simulations Stefan Funk June 6, 2006.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Gas systems for GIF++ 14/02/2015 Ernesto Regaño 1.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
GIF++ ACCESS SYSTEM Dorothea Pfeiffer GIF++ Project Meeting Thanks to: V. Martins De Sousa Dos Rios, D. Vaxelaire, D. Haasler.
LST Storage and Testing at SLAC in the SLD Hall Available space Available Infrastructure Needed Infrastructure Time Line People Money Carsten Hast (SLAC)
REPORT VISIT SAPHYMO Dorothea Pfeiffer GIF++ Project Meeting
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
Irradiation Facilities at CERN for RD-51 Micro-Pattern Gas Detectors (RD-51) Workshop Nikhef, Amsterdam, April Mar CAPEANS CERN.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
CMS Muon detectors for the GIF++ DRAFT Needs discussion within CMS Muon community A. Sharma.
R+D for future accelerators at Santiago Pablo Vázquez IGFAE-USC Instituto Galego de Gísica de Altas Enerxías Universidade de Santiago de Compostela.
GIF++ gas systems 11/07/2014Ernesto, Roberto PH-DT-DI gas service1.
GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 29/06/12R. Fortin PH-DT-DI1 Procurement of the 10TBq 137.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
STATUS REPORT WP7 Facilities and Component Analysis for Detector R&D Activities and Status Resources and Expenditures Work plan Mar CAPEANS 3/11/08 M.C.
Precision Drift Chambers for the ATLAS Muon Spectrometer
Introduction to Irradiation Facilities 1. Challenges at LHC and Why we need Irradiation Facilities (Mar CAPEANS) 2. PH Department Proton and Neutron Facilities.
Thomas Jefferson National Accelerator Facility SensL 6-Oct CHL-2 12 GeV CEBAF Upgrade magnets and power supplies Two 1.1GV linacs Enhanced capabilities.
Thomas Jefferson National Accelerator Facility Page 1 Overview Talk Content Break-out Sessions Planning 12 GeV Upgrade Software Review Jefferson Lab November.
Hall A Installation Review John J. LeRose 2/25/2009.
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
8/4/2015R. Guida PH-DT-DI1 Info 1)Air conditioning system Status: Adrian Fabich contacted CV and he is waiting for info. Today I’m going to meet experts.
Overview on the Proposal for a new GIF, August Page 1 Overview on the Proposal for a new GIF Summary of the document distributed to the users and.
GIF++ gas system Outline:  Beam and cosmic trigger  Gas distribution panels  Gas detection (present and final layout)  Conclusions 14/1/2015R. Guida,
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
Presented by V.Kokila I.Nancy. Telemetry & monitoring A system that reliably and transparently conveys measurement information from a remotely located.
Overview of the BNCT neutron beam line facility in NRI Rez (Prague) Most pictures taken from presentation of J.Burian/NRI – Milano09 1 NRI = Nuclear research.
GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 22/08/12 Project #5R. Fortin PH-DT-DI1 Status of procurement:
30/4/2010Mar CAPEANSDT Steering Board meeting White Paper R&D WP7 Facilities and Component Analysis for Detector R&D.
GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 25/07/12 Project #4R. Fortin PH-DT-DI1 Status of procurement:
GIF++ implementation Adrian Fabich, Sylvain Girod, Dorothea Pfeiffer, EN-MEF-LE GIF++ 3rd users’ meeting, 11th July 2013.
CERN accelerator chain (operating and approved projects)
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
Procurement of the 10TBq 137Cs Source, Irradiator and Filters GIF 137Cs at start: 740 GBq Other characteristics of 137 Cs remain: Half-life: y Beta.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
High Energy Neutron and Proton Irradiation Facilities at TSL Alexander Prokofiev, , 6th LHC Radiation Workshop 1.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
Stefano Bianco for the Frascati and Napoli groups June 29, 2012 In collaboration with Richard Fortin - PH-DT-DI CERN AIDA ENVIRONMENTAL SENSORS STATUS.
The Next Generation of a Gamma Irradiation Facility GIF++
WANG chuanzhen PENG wei XIAO min LI Chunsong (SQHL)
SKANSKA Backup Water Supply – Lessons Learned
WP8 – Improvement and equipment of irradiation beam lines
Irradiation Facilities Questionnaire
Triple-GEM setup at the GIF++
Why We Arrived With Windows Upgrade Support ?
New Progress in Irradiation Processing Industry and Technology
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
S. Stepanyan (JLAB) HPS collaboration meeting May 3 – 5, 2017 JLAB
Gep/SANE this week – quick overview
SOLID Collaboration Meeting
Status of ELI Beamlines
Presentation transcript:

Gamma Irradiation Facility RFortin_ PH-DT-DI GIF Users Meeting April 30, 2009 Richard G. Fortin 1 / 10 Upgrading to a GIF++

Gamma Irradiation Facility RFortin_ PH-DT-DI GIF Users Meeting April 30, 2009 Richard G. Fortin 2 / 10 The Gamma Irradiation Facility in hall 190

Gamma Irradiation Facility RFortin_ PH-DT-DI GIF Users Meeting April 30, 2009 Richard G. Fortin 3 / 10 Lateral collimator window Irradiator The irradiator, lateral collimator and lead filters.

Gamma Irradiation Facility RFortin_ PH-DT-DI GIF Users Meeting April 30, 2009 Richard G. Fortin 4 / 10 Tight floor space inside the bunker

Gamma Irradiation Facility RFortin_ PH-DT-DI GIF Users Meeting April 30, 2009 Richard G. Fortin 5 / 10 50% more space to maneuver large detectors  Short installation time Use short cables (15m)  Single or multiple source ( 137 Cs or 60 Co ) (0.7, 7 or 14 TBq)  Have the same lead curtains with more powerful motors High energy Beam (200 GeV) Cosmic triggering by 2 RPCs (outside the blockhouse)  * TTC or BST or GMT Monitoring of local climatic conditions Status of wishes for GIF++ * Timing, Trigger and Control (TTC), Beam Synchronous Timing (BST), General Machine Timing (GMT)

Gamma Irradiation Facility RFortin_ PH-DT-DI GIF Users Meeting April 30, 2009 Richard G. Fortin 6 / 10

Gamma Irradiation Facility RFortin_ PH-DT-DI GIF Users Meeting April 30, 2009 Richard G. Fortin 7 / 10

Gamma Irradiation Facility RFortin_ PH-DT-DI GIF Users Meeting April 30, 2009 Richard G. Fortin 8 / 10

Gamma Irradiation Facility RFortin_ PH-DT-DI GIF Users Meeting April 30, 2009 Richard G. Fortin 9 / 10

Gamma Irradiation Facility RFortin_ PH-DT-DI GIF Users Meeting April 30, 2009 Richard G. Fortin 10 / 10 Amersham Switzerland (GE Health care )(US): Cegelec (FR): ammagraphie/gammagraphie.asp Nordion (CA): Gamma Service Medical (DE): Potential candidates for the supply of the next Irradiator: