Questions to automatic workshop. 13 BLs financed Another 5 under discussion MAX IV status: Injector linac running since May 2015 3 GeV ring under commissioning.

Slides:



Advertisements
Similar presentations
Control and IT Systems status and strategy ALBA, Piotr Goryl on behalf of Michał Ostoja-Gajewski, Krzysztof Wawrzyniak, Łukasz Żytniak, Tadeusz.
Advertisements

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Francis Perez ALBA Status.
July 01, Shutdown Machine Status:  NTF Treatments and Dosimetry as scheduled  Proton Source Commissioning and Studies RFQ Injector.
F. Fernandez 28/10/ Ferran Fernandez WAO2014 Operators training experience at the ALBA synchrotron light source.
DD1363 MVK Software Demo Guidelines Suggested Plan and Hints 1MVK Software Demo.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Linear Collider Machine Protection Issues M. Palmer Injection System Injector Damping Rings Bunch Compressor and Transfer Sections Main LINAC Beam Delivery.
Unit 3a Industrial Control Systems
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Nightly Releases and Testing Alexander Undrus Atlas SW week, May
Nagios Demonstration Tom Wlodek SLAC Tier2 workshop
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
B. Todd et al. 25 th August 2009 Observations Since v1.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Simulation and Experimental Results of SSRF Top-up Operation Haohu Li, Manzhou Zhang SSRF Top-up Workshop, Melbourne
ATF DR Overview Introduction Low emittance history Present status S.Kuroda ( KEK ) GDE Review 3rd Apr.2013.
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
Emulsion Development Activity C.Sirignano Opera CM - Mizunami - 20/01/2009.
Luminosity expectations for the first years of CLIC operation CTC MJ.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
New Corrector System for the Fermilab Booster E.J. Prebys, C.C. Drennan, D.J. Harding, V. Kashikhin, J.R. Lackey, A. Makarov, W.A. Pellico Fermilab, Batavia,
May 06, 2013 Photo by Greg Vogel. Thursday, April 18, some tunnel work had to be suspended and many planned jobs had to be postponed due to the flooding.
Debriefing of controls re-commissioning for injectors after LS1 TC 09 October 2014.
February 2010 ALBA Synchrotron Light Source Francis Perez.
Jean-Luc Biarrotte, SPL HOM Workshop, CERN, June 25-26, A few longitudinal BBU simulations (in the SPL case) J-Luc Biarrotte CNRS, IPN Orsay.
Automatic Machine Review Dec 2015 MAX IV Storage Rings Automation Pedro F. Tavares.
Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP Meeting Jan 3, 2012.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
Mountaintop Software for the Dark Energy Camera Jon Thaler 1, T. Abbott 2, I. Karliner 1, T. Qian 1, K. Honscheid 3, W. Merritt 4, L. Buckley-Geer 4 1.
WLCG Service Report ~~~ WLCG Management Board, 16 th September 2008 Minutes from daily meetings.
POST and The Boot Process
01/08/2009 AS-TAGL Mtg Global Design Effort 1 CesrTA Update Mark Palmer CLASSE.
1 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Status report SOLEIL September 2007.
1 Machine considerations and constraints for the Safe Injection Flag and Safe Beam Flag Jörg Wenninger AB-OP-SPS Introduction to ‘injection flags’ Machine.
ISU Workshop IV 4/5/07 1 OSG  ISU Brief History: ISU linux farm began producing B A B AR MC in 2001 (12 cpus, 200 GB) by 2005 had 41.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
Computer Technician POST and The Boot Process ©UNT in Partnership with TEA1.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
Status Report TOTEM Collaboration Meeting 17-NOVEMBER-2014
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: Low Level RF system group Thomas Schilcher :: Paul Scherrer Institut SwissFEL.
Communication Tools Used For Commissioning the 12 GeV CEBAF Accelerator Brian Freeman WAO (Mainz, Germany) October 2014.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Andreas Lüdeke, Trieste, 24. Sep., WAO '07 Operation Information Management at the Swiss Light Source Andreas Lüdeke of the Swiss Light Source at the Paul.
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
Solaris status Wojciech Kitka, on behalf of CS&IT group and whole Solaris team Touluse,
Status and Plans for InCA
R. Denz, A. Gomez Alonso, AT-MEL-PM
Python, PyTango + QT Designer Operations perspective on automation
Installation of an Instrument on a CERN machine
                                                                       TANGO Collaboration Experience for running a multi-site international software project.
“DREAMLINER” LINAC FEATURES NOVEL MODULAR UPGRADABLE LOCALLY FIXABLE
Planning the Experiment
Tango status at Elettra
Hot Checkout System for LERF Resuscitation
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Operations Department
Operations Department
Workshop on Accelerator Operations
Injector / Linac Installation Current Status
ThomX – Commissioning Meeting – 25/01/2018
Review of hardware commissioning
Summary of the maximum SCRF voltage in XFEL
Stuart Birch On behalf of Protection Systems Group
Presentation transcript:

Questions to automatic workshop

13 BLs financed Another 5 under discussion MAX IV status: Injector linac running since May GeV ring under commissioning 1.5 GeV installation started, commissioning fall 2016 BL commissioning starts early 2016 Lab inauguration June 2016

Is the present control system robust enough to form a basis for automation? Is it userfriendly enough for allowing non- experts to effectively handle the control system? What feed-backs are lacking to allow the rings and linac to operate continuously for a week without operator interventions under normal conditions (no black-outs, hard-ware failures)? Is the machine protection system good enough? Is the PSS good enough? Is error diagnostics sufficient? Is automatic cold start-up a realistic scenario? Comments on alarm system. Other stuff.