SHORT DELAY BLASTING IN UNDERGROUND MINING

Slides:



Advertisements
Similar presentations
LOCATING PRINCIPLES and LOCATORS
Advertisements

Coal The goal of coal mining is to economically remove coal from the ground. Coal is valued for its energy content, and since the 1880s is widely used.
Tunnelling Methods.
Mine explosions Introduction Worst explosions Yearloss of livesPlace Germany Japan Japan India Yugoslavia USA.
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
Design Optimization of Longwall Chain Pillars
VENTILATION FOR SINKING VERTICAL, SUB-VERTICAL AND DECLINE SHAFTS Derek Walters Turgis Consulting.
 Waves of energy that travel through the earth after rock has been elastically deformed 1. The crust layer is stressed and begins to deform 2. If the.
7.1 Rocks Move Along Faults
CM 197 Mechanics of Materials Chap 20: Connections
AUTOMATIC LATHES These are machine tools in which components are machined automatically. The working cycle is fully automatic that is repeated to produce.
A Comparison of Numerical Methods and Analytical Methods in Determination of Tunnel Walls Displacement Behdeen Oraee-Mirzamani Imperial College London,
FOUNDATION DESIGN.
FOUNDATION.
EARTHQUAKES BY: 10 GRADE. WHAT IS AN EARTHQUAKE ? Simply, earthquakes are the rumblings, shaking or rolling of the earth's surface. It is usually what.
Stiffness Ratio Stiffness Ratio = B H / B where B H is Bench Height B is the Burden Target Stiffness Ratios 3 to 4 is normal range > 4 does not improve.
Amrit Prakash Jonko 08MN23.  A method of mining whereby high value ore is mined in such a manner as to make the low-grade ore left in the mine incapable.
Metallurgy Mining of Ores Ore Concentration or Dressing Metal Extraction.
Force on Floating bodies:
Vibrations from blasting
Under The Earth. Introduction Why Underground? Reserve is deep, uneconomical to remove the overburden Underground: All kinds of design you can imagine.
University of Saskatchewan Geological Engineering GEOE Introduction to Mineral Engineering.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Mining And its environmental impact. What determines the type of mining? Underground v.s. Surface Mining v.s. Solution Underground v.s. Surface Mining.
Weathering - when rocks are exposed to air, water, certain chemicals, or biological agents that degrade the rock  Physical weathering - the mechanical.
First Step is Selection of Burden B = 0.67 * D e * (E/S gr ) 0.33 –D e is hole diameter in inches –S gr is the specific gravity of rock where water =
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
Introduction Trapped Plasma Avalanche Triggered Transit mode Prager
Using Konya’s Method to Identify Blast Design Problems An overview of the Havablast 4 Spreadsheet.
Faults Earthquakes begin on a fault plane movement will not proceed smoothly away from the fault due to Changes along the length and depth of the fault.
Designing Basic Blasting Shots Part I ©Dr. B. C. Paul 2000 Note – The topics covered in these slides represent the author’s summary of information familiar.
Designing Basic Blasting Shots Part II ©Dr. B. C. Paul 2000 Note – The topics covered in these slides represent the author’s summary of information familiar.
BLASTING FOR REDUCED ROCK DAMAGE AND CONTROLLING STABILITY
0 Mining Methods Block 150 Level 330 Level 300 Level 270.
Basic Blasting Patterns ©Dr. B. C. Paul 2000 Note – The concepts contained in these slides represent the author’s view of information commonly held among.
Retaining Walls I. *Introduction
Predicting Fragmentation ©Dr. B. C. Paul 2000 Note – This series of slides portrays the author’s summary of knowledge commonly held by people well studied.
Weathering - when rocks are exposed to air, water, certain chemicals, or biological agents that degrade the rock Weathering and Erosion.
Mineral Mining. Take a ride inside a mine video – Warm Up Video.
Tectonic Activity Earthquakes o Introduction o Causes of Earthquakes o Measuring Earthquakes o Effect of Earthquakes.
Senior Design 2009 Projects Overview. General Format Week Day 1 – Outline Work to Be Accomplished During the Week Week Day 2 – Work Day / Special Lecture.
Ground Vibrations and Air Blasts: Causes, Effects and Abatement.
Chapter 27 Minerals and the Environment. Mining Removal of minerals & fossil fuels from the Earth’s crust.
SHAPER, SLOTTER & PLANER SUBMITTED TO PROF. DEEPAK SHARMA SUBMITTED BY ANKIT SHARMA ME-I (III YEAR)
DASARI SURESH ASST. MANAGER (MINING)  What is fragmentation ?  Fragmentation is the process of breaking the solid in-situ rock mass into several smaller.
Section 2.  Exploring rock for mineralization is the first step in finding an ore deposit.  Rock samples are taken from exploration areas and analyzed.
Vibrations and Waves Physics – 5 th 6wks. Vibration – a repeated back-and-forth motion, around a fixed position. (a wiggle in time) Wave – a rhythmic.
Faults Earthquakes begin on a fault _________ movement will not proceed smoothly away from the fault due to Changes along the _________and ________ of.
Modernization of Track for High Speeds. Modernization Transport more passengers/goods at high speed, safe, economic.
“LATERAL EARTH PRESSURE”
SARVAJANIK COLLEGE OF ENGINEERING & TECHNOLOGY
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
Controlled Blasting In Cutting.
THE CENTRE LATHE - 'FACING OFF' A very basic operation is called ‘facing off’. A piece of steel has been placed in the chuck and the lathe cutting tool.
WEL COME. DRILLING AND BLASTING Index  Introduction of Drilling and its Necessity  Terminology use for drilling  Selection of drilling method  Selection.
BELLRINGER What do you know about different types of waves? How many different types can you think of?
DRILLING Dept. of Mech & Mfg. Engg..
CALL/WHATSAPP
AUTOMATED DRILLING IN UNDERGROUND MINES
EXCAVATION, LATERAL RESTRAINMENT FOR IT AND DEWATERING
CASE STUDY ON VERTICAL CRATER RETREAT MINING
EARTHING.
Arch205 Materials and building construction 1 foundation
Arch205 building construction foundation
Soil Mechanics-II Soil Stabilization and Improvement
Drill cuts used in underground mines
Mining.
Rock Trenching vs. Blasting Methods
McCaw School of Mines Vocabulary
Large Air Systems – Sales Training
Presentation transcript:

SHORT DELAY BLASTING IN UNDERGROUND MINING 113MN0493 M BALA SUBRAHMANYAM

CONTENTS INTRODUCTION ARRANGEMENT OF DELAY DETONATORS WHY WE ARE DOING MOVEMENTOF ROCKS WITH AND WITH OUT DELAY DETONATOR WHERE SHORT DELAY IS USED PERFORMANCE OF SHORT DELAY PATTERNS USED IN OPEN CAST AND UNDERGROUND MINING A typical arrangement for blasting in VCR methods of mining REFERENCES

SHORT DELAY BLASTING A method of blasting in which the detonation of several explosive charges takes place in a specified  sequence over certain intervals of time, usually  measured in milliseconds. The idea of short delay blasting was put forth and realized in the USSR. By the engineer in 1934 during the sinking of mineshaft; later, it was introduced in the USA (1945) and Great Britain (1949).

DELAY DETONATOR FIG 1: SOURCE http://www.kayakujapan.co.jp/en/sale/denkiraikan.html

ARRANGEMENT OF DELAY DETONATORS FIG 2:source http://gsi.ir/General/Lang_en/Page_25/DataId_2485/Action_BodyView/Drill,.blast.prac tices.to.improve.blasting.efficiency.at.Murgul.copper.mine.html

WHY WE ARE DOING THIS ? Reduced consumption of explosive as blasting is more efficient due to availability of a free face for each row of round of shots . (i.e. blasting due to No.1 delay detonator gives a free face for the blasting effect of shots fired by No.2 detonator) In short delay blasting, the initiation of each subsequent charge or group of charges occurs in an area of the rock mass that is under stress as a  result of the preceding explosion, thus increasing  the useful blast effect

. The use of shortdelayblasting increases intensity of fragmentation of the medium by the blast Reduces disruption of the rock mass outside the crushing zone,provides localized disintegration of the  rock mass, and decreases the seismic effect of the blast. In addition, short delay blasting makes possible control of the direction of movement of the crushed rock providing collision and additional crushing of the fragments. .

With out Delay detonator If the delay between the rows is too short, the rock from the back rows tends to take an upward direction instead of a horizontal. FIG 3: https://miningandblasting.files.wordpress.com/2009/09/discussion-on-firing-pattern-in- blasting.pdf

With Short delay detonator control of the direction of movement of the  crushed rock is achieved. FIG 4: https://miningandblasting.files.wordpress.com/2009/09/discussion-on-firing-pattern-in- blasting.pdf

CONDITIONS WHERE SHORT DELAY IS USED In shafts withhazardous gas and dust conditions,  shortdelay blasting makes possible the firing of an  entire set of blast holes in one stage instead of several, with instantaneous blasting (charging an d blasting of sumper holes and ventilation, chargi ng, and blasting of auxiliary holes).

PERFORMANCE OF SHORT DELAY Short-delay blasting is performed by means of shortdelay electric detonators or, when blasting with a detonator fuse, by means of pyrotechnic delay mechanisms (relays).   Singlerow and multirow shortdelay blasting arrangements are use The  principal singlerow shortdelay  blasting arrangements are sequential  row blasting  in which the charges are detonated one by one  from  one end to the other.

Single row and Multi row short delay And consecutive-counter blasting in which the detonation proceeds from the centre  of a row toward its flanks. Providing head-on collision of the fragments and formation of a pile against the  centre of the face. In cases of a large face, the method can be repeate- d, forming several collision centres along the front  (wave arrangement)

DRILL PATTERNS WITH SHORT DELAY BLASTING FIG5 : https://miningandblasting.wordpress.com/

MULTI ROW SHORT DELAY The principal types of Multi row short delay blasting are sequential row blasting in which the charges are detonated consecutively (for example, 20 milliseconds between charges and, so that the moments of detonation of adjacent charges do not  coincide, 30 milliseconds between rows).

Short Delay Series detonators are designed for opencast and underground mines, for driving tunnels, shaft sinking and in quarries where multi shot rounds are required. Long Delay Series detonators are designed for underground mining for driving shafts and tunnels, blasting raises and shaft sinking. They are used for stopping in metal mines, trenching and other blasting applications. The longer delay period allows sufficient rock movement before firing the consecutive shot.

Patterns used in open & underground mines for short delay blasting FIG 6: https://sites.google.com/site/copperminingphotofromindia/explosives-andblasting-in-mines/blasting-principles-for-open-pit-mining

FIG 7: BENCH BLAST PATTERN In open cast mines we use this pattern for Short delay blasting

A typical arrangement for blasting in VCR methods of mining. Under ground Blasting provides a good over view for a Varity of underground blast design A typical arrangement for blasting in VCR methods of mining. FIG 8: http://technology.infomine.com/reviews/Blasting/welcome.asp?view=full

Vertical crater retreat Vertical crater retreat (VCR), also known as Vertical retreat mining, is an open stoping, bottom-up mining method that involves vertically drilling large-diameter holes into the ore body from the top, and then blasting horizontal slices of the ore body into an undercut A system of primary and secondary stopes is often used in VCR mining, where primary stopes are mined in the first stage and then backfilled with cemented fill to provide wall support for the blasting of successive stopes.

FIG9: https://queensminedesign. miningexcellence. ca/index FIG9: https://queensminedesign.miningexcellence.ca/index.php/File:Pic44 88.jpg Holes are drilled vertically from the top drift through to the bottom drift.  Holes are charged such that blasting of horizontal slices of the ore body occurs, progressing from the bottom drift to the top drift.

Vertical crater retreat The most common drill hole diameter used in VCR mining is 165mm Blasted ore is collected at the draw points using LHD vehicles, and then transported to ore passes, sometimes to be crushed, before it is transported to surface for processing Upon completion of the ore extraction, the stope is often backfilled from the top drift, providing rock stability for upcoming blasts. This process is repeated until the ore body is mined.

VCR is a suitable mining method for ore bodies that exhibit the following characteristics Requirements '    'Orebody Dimensions                                            Steeply-dipping orebodies (>45º), with widths of no less than 12-15m, OR Very large both vertically and horizontally [2]                 Grade VCR is not a selective mining method, therefore the ore grade should be low to medium, and it should be relatively uniform throughout the entire orebody [2]                 Depth VCR mining can occur at any depth. 

REFERENCES www.encyclopedia2.thefreedictionary.com/short-delay + blasting Deshmukh D.J(2012),Elements of Mining Technology, Vol- 1,Denett & co, Nagpur, Pg 8.24-8.27. Samir Kumar Das, EXPLOSIVES & BLASTING PRACTICES IN MINES, Lovely Prakashan, Dhanbad, Pg. 42-45 www.msha.gov/S&HINFO/TECHRPT/BLAST/SHORTDEL.pdf https://miningandblasting.files.wordpress.com/2009/09/discus sion-on-firing-pattern-in-blasting.pdf http://www.researchgate.net/publication/237723752_SHORT- DELAY_BLASTING_IN_UNDERGROUND_COAL_MINES

REFERENCES http://gsi.ir/General/Lang_en/Page_25/DataId_2485/Action_BodyVi ew/Drill,.blast.practices.to.improve.blasting.efficiency.at.Murgul.cop per.mine.html http://www.kayakujapan.co.jp/en/sale/denkiraikan.html https://queensminedesign.miningexcellence.ca/index.php/Vertical _crater_retreat https://queensminedesign.miningexcellence.ca/index.php/File:Pic4 488.jpg

THANK YOU