Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | www.townofchapelhill.org Proposed Resurfacing FY16 and FY17 (Spring/Summer 2016)

Slides:



Advertisements
Similar presentations
Speed Feedback Signs Traffic Engineering Division Board of County Commissioners February 11, 2014.
Advertisements

January 23, El Dorado County Development Projects 1.Carson Creek (D1) 2. Blackstone/Valley View (D2) 3. El Dorado Hills Business Park (D3) 4. Clarksville.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
Titusville to Edgewater Bike Loop PD&E Study
1 City of Fort Worth Capital Program Update Presented by Douglas Wiersig, P.E. Director Transportation and Public Works Department CMAA North Texas – August.
BDI 2013 Developers Conference New Construction New construction valuation for 2012 is $21,313,174. Largest single year total ever. 64 single family.
CAPITAL REGION TRANSPORTATION PLANNING AGENCY (CRTPA)
County of Fairfax, Virginia Department of Transportation 1 January 2015 Service Change Route 929 – Centreville Rd Buses will serve Park Center Drive and.
Hillsborough County Walk/Bike Action Safety Plan Hillsborough County MPO Prepared for: Prepared by: Hillsborough County Bicycle/Pedestrian Advisory Committee.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
HB 2 Process Update Policy Committee Meeting September 21, 2015.
Broward Complete Streets Technical Advisory Committee (TAC) Meeting Monday August 10, 2015.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
ENGINEERING & CONSTRUCTION DIVISION GERALD N. BRINTON, P.E. COUNTY ENGINEER / DIRECTOR OF ENGINEERING & CONSTRUCTION VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT.
Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Affordable Housing in Chapel Hill, North Carolina Loryn Clark Town of.
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2010/11 – 2014/15 Presentation to Board of County.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
Non-County Maintained Numbered Public Roads County Commissioners Work Session November 18, 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Department of Public Works Approval of a Journal Voucher Amending Projects in the FY 2011 Capital Improvement Program Budget and Appropriate $125,000 in.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
90% PLAN APPROVAL. Presentation Outline  Board Direction  90% Plan Modifications  Cost Estimates  Project Timeline  Recommendation.
Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Town Council Briefing Winter Storm Jonas: Jan
Comprehensive Operational Analysis (COA) Collier Area Transit February 8, 2012 Report Findings and Recommendation s.
Chapel Hill Parks and Recreation. “Networks of natural spaces which provide corridors connecting areas such as neighborhoods, parks, and schools.
Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Neighborhood Conservation District Public Information Meeting September.
Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Land Use Management Ordinance Update Planning Commission September 1,
Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Carolina North Annual Report (July 1, 2010 – June 30, 2011) Public Information.
MARCH 18, :00 A.M. CITY COUNCIL CHAMBERS 2016 TRAFFIC SUMMIT HOSTED BY: CITY OF LANSING DEPARTMENT OF PUBLIC SERVICE.
Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Complete Streets in Chapel Hill Public Input Work Session November 17,
Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | September 28, 2015 Land Use Management Ordinance Update.
City of Joliet 2014 Proposed Budget November 2013.
Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Summary of Ordinances 1.Street Activation – Frontages / Entrances 2.Maximum.
Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Carolina North Annual Report (July 1, 2009 – June 30, 2010) and Campus.
USDOT TIGER Grant Program Tower Road Complete Street Reconstruction.
Integrity Innovation Accountability Commitment to Excellence Teamwork Values Item 5O Approve the proposed sidewalk projects for construction using FY
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Greenways Commission Presentation “Planning ahead for better days” October.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork Values 1 ITEM 7G Ordinance No st reading, Establish a Municipal Stormwater.
2012 Pavement Management Update June 12, 2012 BoCC Work Session.
Public Works Infrastructure Update Public Works Department April 5, 2016.
2016 Mill and Overlay Project
Roadway Pavement Management Plan
PAVEMENT PRESERVATION
The Gainesville Area Chamber Infrastructure Investment Initiative
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Central Polk Parkway PD&E Study
D-O LRT Station Neighborhoods Update
Town of Clayton 2016 Pavement Condition Survey
City Council Work Session July 5, 2017.
Street Resurfacing Program
Infrastructure Investment Needs
Street Improvement Plan
STREETS & STORMWATER DEPARTMENT
SW Gage Blvd - Street Repair Project
Housing + Neighborhood Resource Summit
Home school assignment changes coming to the Druid Hills area!
Board Transportation Committee May 6, 2014
Pavement Performance Measures In Georgia
PASER Ratings for TwinCATS Planning Area
2014 Streets Resurfacing.
PLUM CREEK PARKWAY WIDENING AND PLUM CREEK PARKWAY/GILBERT STREET ROUNDABOUT PROJECT DESIGN APRIL 3, 2018.
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
LONDON GROVE TOWNSHIP PUBLIC WORKS 2019 PAVEMENT CONDITION REPORT &
Interlocal Cooperative Agreement FY 20
Presentation transcript:

Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Proposed Resurfacing FY16 and FY17 (Spring/Summer 2016)

Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Review and Approval Process Pavement Condition Evaluation

Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Alligator Cracking (7.9%) Reflective Cracking (0.0%) Block Cracking (4.9%) Pavement Distresses Rutting (3.0%)

Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Patching (9.0%)Ride Quality (14.6%) Bleeding (0.0%) Pavement Distresses Raveling (0.7%)

Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Review and Approval Process Pavement Condition Evaluation Priority Consideration Given to –Council and Community Interests –Multi-Modal Streets and Collector Streets –Projects that Leverage Funds and Return Coordination with Internal Staff and Other Entities Very Good Good90-81 Fair80-66 Poor65-51 Very Poor50-0

Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Coordination with Other Entities

Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Review and Approval Process Street Evaluation Priority Consideration Given to –Council and Community Interests –Multi-Modal Streets and Collector Streets –Projects that Leverage Funds and Return Coordination with Internal Staff and Other Entities Transportation and Connectivity Advisory Board TMT Review and Recommendations Council Approval for FY17 Resurfacing– June 13

Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | FY16 and FY17 Funding

Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Completed Projects Plum Ln. Highland Woods Rd. (Ronald McDonald House to Old Mason Farm Rd.) Approved Projects Ridge Rd. (Manning Dr. to Boshamer Stadium) Friday Center Dr. (Town-Maintained Portion) Rosemary St. (Henderson St. to Merritt Mill Rd.) Ramsley Subdivision and Chapel Hill Watch Connector Road

Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | FY16 Street Resurfacing STREETFROMTORATING Copperline Dr.Kildaire Rd. 47Very Poor Elliott Rd.Curtis Rd.Franklin St.58Poor N. Lakeshore Dr.Brookview Dr.S. Lakeshore Dr.28Very Poor Market St.Brookgreen Dr. 56Poor Holly Ln.Willow Dr.Cul-de-sac0Very Poor Multi-Modal Collector Estimated costs exclude curb and gutter and ADA improvements, unless otherwise noted. *Market Street cost includes traffic calming tables. **Holly Lane cost includes curb and gutter work.

Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | FY17 Street Resurfacing STREETFROMTORATING Edgewater Cir.Arlen Park Dr.Copperline Dr.52Poor Pebble Springs RdCul-de-sac 22Very Poor Ridge Rd. Boshamer Stadium Country Club Rd.62Poor Sage Rd.Fordham Blvd.Erwin Rd.47Poor Stateside Drive Martin Luther King Jr BlvdDead End21Very Poor Sprunt St. Meadowmont Ln.Old Barn Ln.40Very Poor Swift RunPerry Creek Dr.Cul-de-sac19Very Poor Country Club Rd.Raleigh Rd.Raleigh St.58Very Poor Multi-ModalCollector

Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Other Lowest Rated Streets STREETFROMTORATING 1Tenney CircleGlenburnieTenney Cir.20 2Blue Granite Ct.Pitch Pine Ln.cul-de-sac22 3Chesapeake Waycul-de-sac 22 4N. Columbia St.Longview St. 22 5Pinehurst Dr.Burning Tree DriveDead end22 6Nuttree Ln.Cobble Ridge Dr.Rossburn Way22 7Rosemary St.Hillsborough St.Boundary St.23 8Brookstone Dr.Homestead Rd.Northfield Dr.23 9West University Dr.Ransom St.Westwood Dr.24 10Crest Dr.Merritt Mill Rd.Johnson St.24 11Roberson St.Rosemary St.Mitchell Ln.25 12Columbia Place W.Columbia Place Dr.cul-de-sac26 13Shady Lawn Rd.Kenmore Rd.Boulder Ln.28 14Birch Cir.Hemlock Dr.cul-de-sac28 15Columbia Place Dr.N. Colmbia St.Columbia Place E.28 16Bolinwood Dr.Whistling Tree Ct.Hillsborough St.31 17Hemlock Dr.Cypress Rd.Long Leaf Dr.32 18Boundary St.Franklin St.Rosemary St.34 19Weaver Dairy Road Ext.Begin MedianRowe Rd.44 20Cameron Ave.Pittsboro St.Merritt Mill Rd.46 Multi-Modal Collector

Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Sage Road – PCR 47 Sage Rd – PCR 47 Elliott Rd. – PCR 58 Plum Ln Holly Lane – PCR 0 N. Lakeshore Dr. – PCR 28 Pebble Springs Rd. – PCR 22 Swift Rn. – PCR 19 Stateside Dr. – PCR 21

Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. |

Country Club Rd. – PCR 58 Market St. – PCR 56 Sprunt St. –PCR 40 Ridge Rd. – PCR 0 Edgewater Cir. – PCR 52 Copperline Dr. –PCR 47

Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Questions/ Concurrence?

Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Pavement Life Cycle

Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Declining Trend in Pavement Condition Rating Chapel Hill Pavement Condition Survey Results Estimated Cost for Routine Maintenance & Resurfacing Needs (in Millions)

Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. |

Achieve an Average Paving Cycle of 14 Years by FY22