LCLS-II LLRF Documentation Sandeep Babel. 2 LLRF Documentation/Budget/Schedule Most Documentation and Budget exists – need to assimilate, review and put.

Slides:



Advertisements
Similar presentations
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Advertisements

Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Overview Interfaces Planning.  One PC to control 2 cavities in one cryo-module  Standard PLC and hardware components  Expected PLC cycle time 2ms.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
Capture Cavity 1at A0 SIMCON2.1 with MATLAB  closed loop with max gain ( 250 )  RMS amplitude noise ≈ 0.07%  RMS phase Noise ≈ 0.2°  closed.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
Control configulation for S1G module operation H. Hayano version 1.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
Zheqiao Geng 6/5/2012 Plan for Evaluating LLRF Deployment Solution at LCLS-II.
Robotics & Engineering Design Projective Management Chin-Sung Lin Eleanor Roosevelt High School.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
Proposed TDR baseline LLRF design J. Carwardine, 22 May 2012.
QA Methodology By Rajib Roy Independent Consultant Qcon.
1 LCWS10 Beijing S1 Global RF Prep (S. Fukuda) 29/3/ S1-Global RF Preparation KEK S. Fukuda Content Time Schedule of S1 Global in KEK Achieving Goal.
CASE1 Computer-Aided Software Engineering Advanced Software Engineering COM360 University of Sunderland © 2000.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Computer Software Types Three layers of software Operation.
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
1 The Cost & Schedule to Accomplish the Transition Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
Fermilab LCLS-II Cryomodule QA/QC Model and Software Tools ESS Cryomodule Workshop, 16-Oct-2014 Jamie Blowers Head of Machine Shop and Quality & Materials.
Project X ICD-2 Low Level RF Brian Chase Project X Collaboration Meeting September 11-12, 2009.
Director’s Review of the Project X Cost Range Estimate: Low Level RF Brian Chase Project X Director’s Review March 16, 2009.
LLRF developments at DESY Holger Schlarb on behalf of the LLRF team LLRF Workshop 2015 Shanghai,
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
2 Introduction ● Goals/deliverables: – Developed applications that will support LLRF controller work, operation and commissioning efforts as well as other.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
ESS LLRF and Beam Interaction
A Brief intro to Project Management What can it do for you
RF Systems and Controls for the LERF CM Tests
SCT Project Management Issues
S1G Experiment Schedule Plan
RF cell Anders Sunesson RF group leader
Modern Systems Analysis and Design Third Edition
LLRF Research and Development at STF-KEK
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Overview and System Design for ESS LLRF Systems
ILC LLRF Status Ruben Carcagno, Brian Chase
LLRF systems status update
Test plan of ESS HB elliptical cavity
ESS RF Development at Uppsala University
XFEL cavities and cryomodules measurements at AMTF
LLRF and Beam-based Longitudinal Feedback Readiness
Modern Systems Analysis and Design Third Edition
Software Development Process
C75 LLRF Cost and Schedule
Low Level RF Status Outline LLRF controls system overview
4Laser RF Diagram.
Modern Systems Analysis and Design Third Edition
Low Level RF Status Outline LLRF controls system overview
Krzysztof Czuba ESS LLRF Quarterly Meeting
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Undulator Cavity BPM System Status
Status of the ESS High Power RF Systems
RF introduction Anders Sunesson RF group leader
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
4. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP)   4.4 Development and implementation of the WIGOS.
LCLS-II Operations in LERF
By Wilmer Arellano Summer 2013
Presentation transcript:

LCLS-II LLRF Documentation Sandeep Babel

2 LLRF Documentation/Budget/Schedule Most Documentation and Budget exists – need to assimilate, review and put in format

3 LLRF Documentation – on LCLS-II Project Templates  Immediate [ 2-3 Months]  LLRF R&D SOW - 1 Document Only [ Information is scattered over multiple documents ]  Modelling and Simulation  Cavity Tests  Cryomodule Tests  Slow and Fast Piezo Tuners  Vector Sum  RF Station R&D  Functional Requirements Document – Almost there  LLRF ESD – Not Sure if this exists  Field Control Chassis  LO generation/Down Converter  Piezo Tuner Chassis/Stepper Motor  Master/ Phase Reference lIne  Interface Control Document [ Global Controls – Timing/MPS/Fast Feedback/Safety Systems/Cryo] – 1 Document [ Curt has already started this]  Interface Control Document [Facilities – Electric/Water] – 1 Document – can be combined with Global Controls ICD  Overall Block Diagram - Does not exist  Interface to other Control Sub systems  LLRF internal Block Diagram  Later as the project progresses [ 8-9 Months maybe or earlier ]  Field Control Chassis Prototype Test plan  Field Control Chassis Prototype – CMTS Integration Plan  Complete CMTS System Prototype Checkout Test Plan  ??  Even later [18-20 Months maybe or earlier]  Production of Field Control Chassis and other Components – SOW  Cable Plant/Rack Profiles etc  Checkout/Commissioning  ?? Ideas/plans exist, but some are not on paper. Need to Review/Release Docs ASAP !!

4 More LLRF Documentation !! Schematics/PCB Documentation Firmware Documentation Software [Linux Kernel Drivers] EPICS Database Documentation All LCLS-II LLRF Documents has be to reviewed and released by official process.

5 LLRF Budget and Schedule [ Next 1 Month]  One Resource Loaded Schedule in MS project with milestones Granularity of tasks can be discussed  One Top level Budget showing Major Activities Already exists – Need to verify the latest numbers and see if it agrees with P6

6 Thank you !!  Priority to MS Project Resource loaded Schedule/Budget in the next month  Priority to Documentation like FRS, SOW and ICD in the next 2-3 months