ESA UNCLASSIFIED – For Official Use MAPPS Software Review Board.

Slides:



Advertisements
Similar presentations
Project Management with VIVA PPM Tool (Project Portfolio Management)
Advertisements

Making the System Operational
Test Builder & Test Executor Sonja Vrcic Socorro, December 12, 2007.
Beatriz Martinez - SAT CFA Team 2 nd CFA Implementation Review ESAC, Madrid, 06 Jun 2013 CLUSTER FINAL ARCHIVE (CFA) Future developments.
Page 1GlobColour CDR Meeting – July 10-11, 2006, ESRIN All rights reserved © 2006, ACRI-ST Resulting Technical Specification.
A new Network Concept for transporting and storing digital video…………
SEP1 - 1 Introduction to Software Engineering Processes SWENET SEP1 Module Developed with support from the National Science Foundation.
Key-word Driven Automation Framework Shiva Kumar Soumya Dalvi May 25, 2007.
1 Project Planning with MS Project Kishore October 2002 Notes available in the presentation: To view notes download the presentation and select View->
These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.
Software Engineering 1 Evolutionary Processes Lesson 11.
Systems Analysis and Design in a Changing World, 6th Edition
Solar Orbiter SOWG 5| Richard Carr| Low Latency Pipeline Hosting and Delivery Architecture | Slide 1 ESA UNCLASSIFIED – For Official Use Solar Orbiter.
Package design and the Iterative process model. What is a package? Classes are not sufficient to group code –Some classes collaborate, implying dependencies.
, TargetProcesswww.targetprocess.com1 TargetProcess:Suite Agile Project Management System Powers iterative development Focuses on Project Planning,
Introduction to Continuous Integration Mike Roberts.
Miser-C MISRA-C Compliance Checker Ian Biller, Phillippe Dass, Bryan Eldridge, Jon Senchyna, Tracy Thomas Faculty Coach: Professor Michael Lutz Project.
12.
June 19, Outcome of the CERN meetings Preparing the upgrade R&D proposal M. Shochet.
Eurostat D.1 SdmxSource SDMX RI User Group Luxembourg, September 2013.
13 ° COSMO General Meeting Rome VERSUS2 Priority Project Report and Plan Adriano Raspanti.
SOPS: The Science Operations Planning System for the first ESA Lunar Mission SMART-1.
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
ATLASSIAN JAPAN Neeraj Jhanji August 21, 2006 JIRA & Confluence Demonstration Event.
Epiphany Partners Corporation HealthTechNet ClerePath TM Solution July 21, 2006.
End HomeWelcome! The Software Development Process.
District and Subordinate Courts Application Software Standardization.
ALMA Integrated Computing Team Coordination & Planning Meeting #2 Santiago, January 2014 Control Group Planning Rafael Hiriart, Control Group Lead.
Lecture 3 Managing the Development Project SFDV Principles of Information Systems.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
European New HST & MMI Demo Nacho León María Arévalo Jonas Haase Jesús Salgado Deborah Baines Bruno Merín ESAC 20 January 2015.
Software Status Sonja Vrcic Socorro,
1 Software tools for GLC studies Akiya Miyamoto KEK 20 April, 2004 Representing ACFA-Sim Group
Software Configuration Management (SCM). Product Developer Disciplines One view of the world is that there are three types of activities are required.
PACS NHSC Data Processing Workshop – Pasadena 10 th - 14 th Sep 2012 HIPE Introduction and Setup for SPIRE David Shupe, NHSC/IPAC on behalf of the SPIRE.
Reduce Development and Testing Time on Embedded Space Programs With Auto- Generated Code Software Engineer Northrop Grumman Electronic Systems Matthew.
Jan 28, 2005Elizabeth_Gallas D0_Trigger_Database 1 D0 Trigger Database Status Elizabeth Gallas Fermilab CD/D0CA Margherita Vittone, Vijay Murthi, and Steve.
1 Object-Oriented Analysis and Design with the Unified Process Figure 13-1 Implementation discipline activities.
1/106 December 2001Rosetta SOWG Status of the Rosetta Project TestBed (PTB) P. van der Plas Modelling and Simulation Section ESA/ESTEC ESA/Estec 6 December.
A Road Map for PODS Utilizing ArcGIS Location Reference for Pipelines (ALRP)
Software Requirements Specification. Requirements Specification: An Overview Basic goal: To understand the problem as perceived by the user. Activities.
MND review. Main directions of work  Development and support of the Experiment Dashboard Applications - Data management monitoring - Job processing monitoring.
MAPPS-SCM Software Configuration Management. MAPPS-SCM System Services MAPPS Mission Analysis and Payload Planning System Geometry and Trajectory Simulation.
Jan 7, 2002E. Gallas/Trigger Db1 Trigger Database and Trigger Configurations and Trigger Issues Elizabeth Gallas, Jeremy Simmons (Fermilab - Computing.
P. Mokashi IES Team Meeting, SwRI 29 May IES (SwRI) Develop sequences (flight and EQM test) Develop tables, macros and patches if necessary Test.
Background  EM16 SGS+TEC met with FD 1 year ago  Both sides agreed that there was a “performance gap:  SGS prepared a TN with 2 main options to bridge.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
ESA UNCLASSIFIED – For Official Use Background for Downlink Plug-in MAPPS User-Group Meeting.
GW ToDo A Task Manager CSCI 6442 Project Spring, 2016.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
ESA UNCLASSIFIED – For Official Use MAPPS Software Review Board.
Increment 2 Development Plan - License Checker 2.0 Jing Jing-Helles
Spacecraft Monitor & Control Working Group (SM&C WG) CCSDS SM&C WG.
SUPPORT THE WARFIGHTER MPE Reference Architecture Development Kick-off Meeting Deputy Director Architecture & Interoperability Office of the DoD CIO Thomas.
Development Project Management Jim Kowalkowski. Outline Planning and managing software development – Definitions – Organizing schedule and work (overall.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Analysis. This involves investigating what is required from the new system and what facilities are available. It would probably include:
1 MAPPS Software Review Board MAPPS SRB – part II ESAC, Madrid, Spain 3 rd June 2016 ESA-ESTEC - “MAPPS Software Review Board” – MAPPS SRB - Part II, ESAC,
Introduction to CAST Technical Support
RSOC Overview at SWT #26, 11/12 June 2009
Instrument Teams to SOC Test Specifications
TeXlipse [I1] Iteration
Rosetta Science Ground Segment Overview
Maintaining software solutions
Applied Software Implementation & Testing
Software life cycle models
Software visualization and analysis tool box
Epic Roadmap July-Dec 2019 Non Linux Platform Support July-Dec 2018
Integration Project Task
Overview Activities from additional UP disciplines are needed to bring a system into being Implementation Testing Deployment Configuration and change management.
Presentation transcript:

ESA UNCLASSIFIED – For Official Use MAPPS Software Review Board

SRB_Technical| C Borrett | ESAC| 10/12/2014 | TEC-SWG | Slide 2 ESA UNCLASSIFIED – For Official Use Overview 1.Roadmap up to next SRB 2.Conflicts & Risks 3.Manpower allocations

SRB_Technical| C Borrett | ESAC| 10/12/2014 | TEC-SWG | Slide 3 ESA UNCLASSIFIED – For Official Use Roadmap Overview 1.One feature release of MAPPS every month, starting end of Jan 2.Considering level of support plus maintenance issues a.Roughly 20%-30% is spent in project management, support, bug investigation and bug fixing across the 4 missions currently utilising EPS/MAPPS b.Requests for “quick” features to enable other work to progress (usually on the order of a few hours work, at most one day) 3.Year of the Planning Module! 4.Number of issues deferred to next SRB / not allocated versions due to time limits 5.Again, no allocated time for documentation

SRB_Technical| C Borrett | ESAC| 10/12/2014 | TEC-SWG | Slide 4 ESA UNCLASSIFIED – For Official Use Issues not tackled 1.Planning DB specialisation a.Bepi support to MPS b.Solar Orbiter c.ExoMars additional plugins 2.Flight Dynamics URD support 3.Support to data model for Bepi

SRB_Technical| C Borrett | ESAC| 10/12/2014 | TEC-SWG | Slide 5 ESA UNCLASSIFIED – For Official Use Roadmap 1.Version Mid Jan 1.Solar Orbiter SOOP Kitchen GUI v1.0 available in time for SWG FN full time 2.Continuing Observation modifications (iterative with SOOP Kitchen) 2.Version 7.3 End of Jan a.AGM Support for multiple missions – BG 50% b.Overlapping / Minimum duration observation constraints – CB background task c.Planning Module Opportunity Analyser component starts (8- 12week task) 3.Team fulltime, FN supporting Solar Orbiter SWG a.BG time not covered?

SRB_Technical| C Borrett | ESAC| 10/12/2014 | TEC-SWG | Slide 6 ESA UNCLASSIFIED – For Official Use Roadmap 1.Version 7.4 Mid-Feb a.Timeline Visualisation integrated with Data Sampler – CB b.Spice attitude and orbit reader – FN / BG? c.Spice Attibute Writer – BG? d.Datapack generation of event state – CB e.SOOP Kitchen updates after SWG – FN f.Continue planning module – CB focus for month g.Derived pointings for MEX - PVP 2.Team full time a.BG time not covered? b.Maintenance and support not available

SRB_Technical| C Borrett | ESAC| 10/12/2014 | TEC-SWG | Slide 7 ESA UNCLASSIFIED – For Official Use Roadmap 1.Version 7.5 End of April a.PTR Blocks in Observations and ITL – CB b.Opportunity Analysis component first version (integrated Planning Module) – CB c.Ini file rationalisation – FN 2.Minimal support and maintenance

SRB_Technical| C Borrett | ESAC| 10/12/2014 | TEC-SWG | Slide 8 ESA UNCLASSIFIED – For Official Use Roadmap 1.Version 7.6 Mid May a.ExoMars FD Pointing modes (if available) FN / BG b.Update of flows – CB if possible, otherwise FN c.Observations without OBS_END – CB d.Updates of Opportunity Analyser - CB e.PTR Generation of Parameters BG (if not FD pointings) 2.Team full time, minimal support available a.BG time not covered

SRB_Technical| C Borrett | ESAC| 10/12/2014 | TEC-SWG | Slide 9 ESA UNCLASSIFIED – For Official Use Roadmap 1.Version 7.7 End of June a.Consolidation of envelopes/profiles – CB / FN b.Data volume envelopes/profiles – CB / FN c.Start of Planning Module Event Finder implementation CB / FN 2.Team full time, no support time available

SRB_Technical| C Borrett | ESAC| 10/12/2014 | TEC-SWG | Slide 10 ESA UNCLASSIFIED – For Official Use Roadmap 1.Version 7.8 – Mid August a.Provide EPS Statistics b.Solar Orbiter Command Slots (possible) - CB c.Generic Time formats d.Resolve output files to different events/time periods e.Event finder completed