Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Carbon Reduction Commitment AEA is the Government adviser contracted to develop the CRC scheme Stephen Boyle, Principal Consultant, Climate Change and.
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
National Grid: Gas Transmission System Operator
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
The variable cost approach to pricing John Thomas Deputy Director, Economic Regulation Office of Rail Regulation, UK 9 July 2004.
20 September 2015 GAZ DE FRANCE ESS Introduction of Gas Reserve Arrangements Mark Bailey Gaz de France ESS.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
18th May 2009 energynetworks.org 1 A PRESENTATION BY ERIKA MELÉN OF THE ENERGY NETWORKS ASSOCIATION Report from the ENA/ERA Theft of Energy Working group.
Impending Audit Landscape for Data Centres John Booth Carbon3IT Ltd
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
LDZ Shrinkage - a National Grid Overview Chris Warner Mod 0194/RG 0208 June 2008.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Information provision for winter 09/10 Jenny Phillips – GNCC Strategy & Support Manager.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
10 November 2015 GAZ DE FRANCE ESS Modification Proposal 0086 “Introduction of gas demand management reserve arrangements” 1 st June 2006 Phil Broom and.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Transmission Planning Code – Design Margin Update Transmission Workstream, 4 th February 2010.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Shrinkage Forum Tuesday 8 March 2011, 31 Homer Road.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EEC3 – The Way Forward Presentation to NIA Annual Conference 12 December 2006 By Iris Rooney, Defra.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas SO Incentives For 1 April 09 Transmission Workstream 3 July 2008.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
National Grid - Key Challenges Beijing 24 October 2005 Alan Smart Optimisation & Risk Manager UK Transmission.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
Meter Error – NTS Revenue Flows Gas TCMF – 2 nd December 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
Www2.nationalgrid.com/bsuos An Introduction to Balancing Services Use of System Charging (BSUOS)
Background Current balance of LDZ System and Customer charges
Gas System Operator Incentive Review
Review of System Alerts
SO Incentives Consultation
An Introduction to Balancing Services Use of System Charging (BSUOS)
SO Incentives from April 2010
Gas SO Incentives Rollover
Proposed Environmental Incentive
Presentation transcript:

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Gas Forum - March 2013 System Operator (SO) Incentives David Wildash

2 Incentives overview Operating Margins – Reputational Greenhouse Gas – Financial Residual Balancing – Financial (+£2m / -£3.5m pa) Demand Forecasting (D-1) – Financial (+£10m / -£1.5m pa) 2013/142014/152015/162016/172017/182018/192019/ /21 Shrinkage – Financial ( +/- £7m pa) Data Publication - Reputational (D2-D5) - Financial UAG - Reputational Maintenance - Both Maintenance (+/- £1.5m pa) D2 - D5 (+£10m / -£1.5m pa) Downside only, No collar

3 NTS Shrinkage  Incentivises minimisation of the energy costs associated with operation of the network including  Compressor fuel, UAG and CV shrinkage  Cost target made up of volumes multiplied by price benchmarks  Changes from current scheme:  45% sharing factor  Forecast volumes from a methodology – forwards and prompt procurement  Updated price benchmarks:  9 months ahead of quarter for forwards procurement  Week-ahead for ‘prompt’  Reduced fixed swing allowance (£2m per annum)  Current environmental adjustment removed  Pass through of environmental costs (EUETS & CRCEES) and other electricity supply & trading costs 8 Year scheme: Annual Cap +£7m, Collar -£7m

4 UAG – Unaccounted Gas  Existing reputational incentive maintained in the RIIO-T1 period  Undertake UAG Projects  Meter validation witnessing  Data analysis  Publish UAG Report  Every 6 months 8 Year scheme: Reputational

5 Residual Balancing  Aims to ensure National Grid balance supply/demand each day, with minimal impact on markets  Scheme is unchanged from current incentive  Two elements designed to ensure that balancing actions are economic and efficient  Price performance Measure (PPM) - Defined as the price differential between any National Grid trades, measured as a percentage of the System Average Price (SAP)  Linepack performance Measure (LPM) - Incentivises National Grid to minimise any changes between starting and closing NTS linepack over a gas day 8 Year scheme: Annual Cap +£2m, Collar -£3.5m

6 D-1 Demand Forecasting  Incentive on accuracy of day ahead demand forecast  Current scheme target on a percentage of daily demand  New scheme is a volume target of 8.5mcm/d  Additional short cycle storage adjuster capped at a further 1mcm  Annual adjustment reduces in impact by 50% per year  Performance weighted to daily demand  Performance is more significant on high demand days 8 Year scheme: Annual Cap +£10m, Collar -£1.5m

7 Demand Forecasting D-2 to D-5  Incentive on our accuracy of four demand forecasts (D- 2, D-3, D-4 and D-5)  Performance is weighted to daily demand  Fixed target of 16mcm/d  Performance equal to the average error of the four demand forecasts Annual D-2 error (weighted) Average error +++= Annual D-3 error (weighted) Annual D-5 error (weighted) Annual D-4 error (weighted) 2 Year scheme: Annual Cap +£10m, Collar -£1m

8 Maintenance  New area of incentivisation in response to customer feedback  Provision of indicative maintenance information (publish on NG website where possible) earlier (up to 3 years ahead)  Use reasonable endeavours to  Agree changes to plan with affected customers  Raise awareness of the Minor Works Agreement  Publish a report on website by 1 June summarising Maintenance undertaken in previous year  Provide changes information (including customers impacted) to Ofgem to enable updated ‘changes’ scheme from April Year scheme: Reputational

9 Maintenance – Changes scheme  Minimisation of National Grid initiated changes to April Maintenance plan  Customer initiated changes are not included in the incentive  Scope: changes (including reductions) and cancellations of Maintenance Days at direct connects and NTS Connected System Exit Points (CSEPs)  Target fixed for two years reflective of workload (14.5% of Days) in the April maintenance plan  Incentive gain/loss: £50k per change compared to benchmark 2 Year scheme: Annual Cap +£0.5m, Collar -£0.5m

10 Maintenance - Days Use Scheme  Minimisation of maintenance days used  Scope: ILI (In line inspections) and valve operations only  Target:  ILI benchmarks for short (up to 10km) and long (greater than 10km) runs multiplied by actual workload  Valve operations annual benchmark  Incentive gain/loss: £20k per day, compared to benchmark 2 Year scheme: Annual Cap +£1m, Collar -£1m

11 Greenhouse Gas Emissions  Minimisation of venting from NTS compressors  Now a downside only scheme  Each year will see a 3% reduction in our current target:  2013/14 = 2,917 tonnes  2014/15 = 2,829 tonnes  2015/16 = 2,744 tonnes  Venting calculated over the course of a year including:  Starting a compressor  Purging a compressor  Depressurising a compressor; or  The leakage of gas through a seal around the shaft of a compressor 3 Year scheme: Downside only, no collar

12 Operating Margins - OM  Under our Safety Case we are required to procure OM services  Gas available to the system to deal with system stresses both pre-emergency and in an emergency  Reputational incentive:  Obligation to procure OM in an economic and efficient manner  Obligation to publish an annual OM report after procurement exercise  Obligation to promote competition in the procurement of OM 8 Year scheme: Reputational only

13 Data Publication Incentive  Financial incentive replaced with a reputational scheme  Covers forward looking market information and operational data e.g. Winter Outlook 8 Year scheme: Reputational only

14 IAE / Uncertainty Mechanism  Enables an incentive to be revisited. Triggered by Ofgem but NG & industry can submit evidence that a trigger has been met  Triggers for ‘shallow’ SO incentives:  Hitting, or expectation of hitting cap or collar for 2 consecutive years  Legislative or regulatory change, force majeure or emergency  Material events (>£5m impact on incentive revenue)  For Residual Balancing: material impact of wind on CCGT behaviour

15 Future Focus – Delivering SO outputs Enhancing customer satisfaction Enhance competition in OM provision Incentive to reduce number of Maintenance Days used Increasing accuracy of Forecasts Increased engagement with our customers Reducing Emissions Efficient planning of maintenance Optimising energy procurement strategies

Contact Details for Gas SO incentives  For any follow up questions on Gas SO incentives: Or  Contact: David Wildash ( )  Contact: Juliana Pollitt ( ) 16