Central Houston, Inc. Houston Downtown Management District 909 Fannin, Suite 1650 Houston, Texas 77010 713-650-3022/713-223-2003 Operations

Slides:



Advertisements
Similar presentations
BUILDING EMERGENCY ACTION PLAN
Advertisements

Emergency Evacuation Zayed University, Dubai Campus.
Westar Energy Emergency Preparedness and Restoration TFR Meeting June 26, 2012 Jim Tyler Director, Distribution Services.
A Brief Overview of Emergency Management Office of Emergency Management April 2006 Prepared By: The Spartanburg County Office of Emergency Management.
Facilities Management Post Hurricane Building Assessment and Recovery June 28, 2007.
MU Building Emergency Coordinator Training
Emergency Guidelines SOEST Fiscal Office August 20,
Joe Turner, PE Disaster Recovery Engineer. DIVISIONS AND DISTRICTS.
@TxSchoolSafety Continuity of Operations Planning Workshop Devolution & Reconstitution.
TRANSPORTATION & EMERGENCY PREPAREDNESS CHECKLIST National Resource Center for Human Service Transportation Coordination (NRC)
1 Continuity Planning for transportation agencies.
Phone: Fax: Emergency Mgmt.: Fire Safety: 15 Edgewood Avenue Atlanta, Georgia website:
Welcome! 1 Safe Harbor - Safe Schools, LLC - all rights reserved 2012.
SHELTER IN PLACE DRILL TRAINING Preparation for April 2008 Drill.
Emergency Evacuation.
Building 90 BET Meeting S.Synarski 6/11/14. Agenda Reminder: Sign up for Lab Alert (2 min) October Drop, Cover, Hold, Evacuate Drill: Oct 16, 10:16am.
PELLET PLANT LAY DOWN TRAFFIC MANAGEMENT POLICY COMMUNICATION.
EMERGENCY EVACUATION TRAINING for BUILDING DIRECTORS Preparation for Fire Evacuation Drills.
Topics of Discussion:  Introduction  Identify & describe the protocols & processes for: Lockouts Sheltering in Place Lockdown Evacuation  Active Shooter.
Educational Field Services 30 CFR Part CFR Part Training Responsible Persons Emergency Evacuations.
Phone: Fax: Emergency Management: Fire Safety: 15 Edgewood Avenue Atlanta, Georgia website:
Kanawha County’s Emergency Preparedness Plan. Planning is bringing the future into the present so you can do something about it now. Alan Lakein Time.
EMERGENCY NOTIFICATIONS & LOCKDOWN Denton, Dallas, Houston
ENP Study Group Disaster Planning Session #6 BROUGHT TO YOU BY: THE FLORIDA NENA EDUCATION COMMITTEE.
Organizational Tabletop Exercise 1 Hurricane Scenario (Community-Based Organizations) Date | Location.
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
HOMELAND SECURITY ADVISORY SYSTEM. Established after the terrorist attacks on America September 11, 2001.
A Major Business Disruption A Strategy for Minimising the Downtime Anthony Hegarty Mitigating Risks.
Communications in the Face of Crisis Lesley Bruinton Tuscaloosa City Schools.
1 Hurricane Irene Emergency Planning and Response Metropolitan Transportation Authority Peter Stuebe Deputy Director Metropolitan Transportation Authority.
04-1 u Chapter 4 –Protective Actions Haz Mat Incident Considerations.
ASSURANCE PINNACOL ASSURANCE Wants you to know about : EMERGENCY/DISASTER PREPAREDNESS.
SETON HALL UNIVERSITY STAFF ORIENTATION: EMERGENCY PROCEDURES SETON HALL UNIVERSITY STAFF ORIENTATION: EMERGENCY PROCEDURES.
Developing Plans and Procedures
 MSU Port Arthur Maritime Industry Plan o Port Conditions  MSU Port Arthur Hurricane Plan o Hurricane/Severe Weather Response Operations  Sector Houston.
SAFETY AND SECURITY PRESENTATION Armstrong Jim Quinn, Principal Andrea DePiro, Assistant Principal Ken Baine, Security Planning Officer.
6/24/2015.  I am…  The purpose of this exercise is to provide you with an opportunity to practice and evaluate, response concepts, plans, and procedures.
A Brief Overview of Emergency Management Office of Emergency Management September 2004 Prepared By: Marybeth Solesbee, CEM.
Facilities Incident Notification. Reporting Requirements All employees are required to report immediately any incidents, accidents, or major equipment.
Disaster Preparedness Are you prepared?. Effective Disaster Plans  Your plan should outline the basic preparedness steps needed to handle the anticipated.
City of Houston Office of Emergency Management houstonoem.org Houston’s Hurricane Preparedness and Response Michael Walter Public Information Officer.
Houston Police Department Central Business District Hurricane Preparedness Plan.
EXPECT THE UNEXPECTED Prepare Your Business for Disaster.
Government Engineering College, Bhavnagar.. Government Government has responsibility to: Develop, test, and refine emergency plans Ensure emergency.
HURRICANE PREPAREDNESS & RESPONSE Michael Walter Public Information Officer.
Medical Center Hospital Plain Language.  Medical Center Hospital has a system for responding to the following events:  Evacuation  Fire  Hazardous.
Central Houston, Inc. Houston Downtown Management District 909 Fanin, Suite 1650 Houston, Texas / Operations
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
Evacuation Procedures City Council October 20, 2015.
Safe Schools Program Campus Orientation August 15, 2016.
TENANT TRAINING HURRICANE SEASON 2016 NATIONAL SAFETY MONTH Along with the start of Hurricane Season, June is observed by the NSC as National Safety.
Emergency Shoulder Use for Evacuations
Safe Schools Program Campus Orientation
Town of Emerald Isle’s Emergency Operations Plan
EMERGENCY OPERATIONS PLANS
DISASTER MANAGEMENT.
District’s Plan for Disaster Preparedness.
Weather Decision Procedure Director of Operations
Weather Decision Procedure
MCPS School Safety and Security Presentation
TENANT TRAINING HURRICANE SEASON 2018
JSC Hurricane Plan We use standard Incident Command System protocols to manage storms (essentially a storm specific organization is formed) Level 5 (Jun-1.
Building Emergency Evacuation Plan (BEEP) Training for Building Emergency Coordinators and Alternates.
Introduction A variety of situations may create the need to evacuate a University building including fires, natural disasters, and alarm activations.
Training Responsible Persons Educational Field Services
City of Bayport Flood Public Information Meeting
FIRE/ EXPLOSION/ BOMB THREAT QRC
TENANT TRAINING HURRICANE SEASON 2019
Building Emergency Evacuation Plan (BEEP) Training for Building Emergency Coordinators and Alternates.
Introduction A variety of situations may create the need to evacuate a University building including fires, natural disasters, and alarm activations.
Presentation transcript:

Central Houston, Inc. Houston Downtown Management District 909 Fannin, Suite 1650 Houston, Texas / Operations

Minimize asset loss, injury, damage from an emergency event. reduce interruptions to business, residents and governmental activities Collaborate with regional emergency management actions.

Houston Downtown Management District – Responsible for maintaining a comprehensive contact list for Downtown stakeholders, businesses and partners Public Works & Engineering - Responsible for clearing debris from streets and restoring traffic control lights. METRO – provides scheduling as well as the most up to date information on both METRO bus, Park & Ride and METRO RAIL service issues HPD – control ingress/egress, coordinate street/sidewalk closings to ensure safety and expedite repairs. City of Houston Office of Emergency Management – Operates Houston Emergency Center (HEC)

Public Works & Engineering Debris removal Street and Light Repair HPD Determine Street Closures Determine Street Closures Evacuation of CBD Managing CBD Access following Event Evacuation of CBD Managing CBD Access following Event METRO Bus Bus METRORAIL Operations METRORAIL Operations Park & Ride Park & Ride DECC communicate all available and critical information to stakeholders, businesses and all partners

VOLUNTARY RELEASESHELTER IN PLACE  Voluntary Release - Situation may not require evacuation, but it may present circumstances where employers may wish to release employees early from the work site.  NOTE: Each employer is responsible for the decision for a voluntary release based upon information provided through Houston TranStar to local news and weather media. HDMD/ CHI will assist in these notifications through the Houston Downtown Management District Emergency Information Website ( phone and communication including information on METRO Transit and other service.  Shelter in place - This is the action of remaining indoors, restricting ventilation, and sealing outdoor access. This is implemented to prevent harm caused by evacuating through the hazard area.  Strictly follow all instructions given by local emergency authorities. Monitor local news media and follow the instructions of local emergency officials.  To reduce the possibility of toxic vapors entering, seal all entry routes as efficiently as possible.  Building superintendents should turn off all ventilation systems. Secure elevator operations to minimize air movement throughout the building.  Close as many internal doors as possible.

EVACUATION SHUTDOWN OF PROPERTIES  Evacuation - If a situation arises that requires emergency rapid evacuation of all or a portion of downtown, affected building managers will be contacted by CHI/HDMD, Fire, or Police authorities. The action requested will depend on the nature of the emergency. Affected building managers will be directed to implement their phased emergency evacuation plans. Evacuation is by walking, and not using vehicles.  NOTE: Any call for mandatory evacuation will be made by appropriate City of Houston or Harris County officials and broadcast through the official Emergency Alert System (EAS) (KTRH, KUHF 88.7, 740 AM).  Shutdown of Properties – This is a property decision other than in a mandatory evacuation situation.  Decision is made when/whether or not to close down property.  If it is decided to close the facility, HDMD should be notified and the City representative at the Houston Emergency Center (HEC) will be notified. HDMD will maintain a log of closed properties.  If personnel remain on site to shepherd the facility through an emergency event, HDMD should be provided with all emergency contact information. HDMD will make the information available to the City representative at HEC, and all partners at the Downtown Emergency Coordination Center (DECC).

72hrs - Prior To Storm Event HDMD communicates via website to begin prep 48hrs –Prior To Storm Event Secure and/or remove hazards, review current plan, finalize check - list Preparation Storm Arrival “Hunker Down” – Monitor building population, call 911 for outside assistance During Event 24 – 36 hrs After Storm – Assessment 36 – 72 hrs After Storm – Recovery 72 hrs After Storm – Resumption of Operation Response

Pre – Event (96 Hours) DECC partners will have a conference call to establish an event timeline Post – Event (winds less than 35 mph) DECC and partners gather for initial assessment Events other than hurricanes will be handled on a case by case basis, and DECC will activate if necessary

Property Management – Monitor safety of building population during the event Property Management - Continually monitor water conditions on streets placing sandbags if necessary Emergency responders are generally unavailable during landfall – will respond once conditions are safe HDMD – monitor all emergency activities and relay information to stakeholders and partners

12 – 24 HRS Damage Assessment report to HDMD to assess event impact(Can be found in Appendix D of emergency management plan 0 – 12 HRS HDMD will coordinate actions from the (DECC) Property Managers should ensure property is secure and Fill out Hurricane Damage Assessment Deployment of resources i.e. Public Works, HPD, METRO – City Of Houston Curfews likely

Hurricane Damage Assessment Report provides information to the Houston Emergency Center(HEC), and is utilized to gather resources that will help assist the Downtown District with recovery Property Managers should try to complete report with 24hrs after event

Damage Assessment Report, can be found on the emergency website: h.guz0T4F6.A9lYxgyR.dpbs

Damage Assessment Report, can be found on the emergency website Important: Please ensure to fill out Property Name & Address  Updated Contact Information

Keep abreast of all emergency activity by checking:

Contact Us  Forms & Surveys

Keep abreast of all emergency activity by checking: Copy of the HDMD Emergency Plan – complete with contact information

Also sign up for alerts from the OEM site

Sign up for alerts from OEM

You can also request a copy of the Preparedness Guide

Standby contractors (i.e. – glass, scaffolding, etc.) Standby structural engineering assessment capability Out of town standby resources Identification of contractors Emergency plan for property Review essential personnel and responsibilities Review contact lists (phone/ lists) Ride out teams and provisions Tenant communications Communication w/ HDMD Secure property (flying objects) Secure construction sites Building access/security post storm Equipment (barricades, sandbags, etc.) Attic stock (glass, plywood, etc.) Checklist can be found at

James Kennedy, Operations Manager Gary Cook, Senior Director of Operations (713) Office (713)