Cross-Country Sit Ski Cody Barnett Betsy Camp Josh Metzler Robbie Quesada Mark Scheel Alex Triplett.

Slides:



Advertisements
Similar presentations
Sales Call Plans Set Objectives Design Sales Call Flow
Advertisements

Program Management Office Department of Innovation & Technology City of Boston Kickoff Meeting.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
IRENE SHVIKTAR VICE PRESIDENT, MARKETING FRONT RANGE ACTION SPORTS.
Migration MIGR-02. David Cervelli Managing Consultant Strategic Systems Group (SSG) June 2007 Preparing for an Implementation.
Pedestal BaseTiller Strut Track Platform ACKNOWLEDGMENTS Final Achievements Project Overview The goal of this project is to re-design, build, and test.
Presenters: Michael Dixon Ben Gheliuc Group Members: Haidar Al Gharash Daniel Gheliuc Fue Her Zach McCurter Capstone Advisors: Faryar Etesami Evan Thomas.
P10057: Delivery and Scale-Up of a Monitoring Device for Human Smoking Behavior Ryan Miller – Project Manager Chris Oxley – Lead Engineer Ryan Enyeart.
1 Walk-in slide. 2 How to Manage a System Upgrade The Good, The Bad and The Ugly of Conversions David Cervelli Managing Consultant April 25, 2006.
Development and Quality Plans
SA Capstone Requirements and Design Week 10 SYST Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
USA GYMNASTICS MASSACHUSETTS Meet Director’s Meeting June 9, 2011.
Project Management Donald Hsu, Ph.D. Dominican College
Project Management Key Concepts “In the Business World, everyone is paid in two coins: Cash and Experience. Take the experience first; the cash will come.
CIS 499 Senior Seminar IT project management. Exercise. Write a testable problem statement in subject verb format. Who? Are the people going to use this.
Team Members: Thong Truong Paul Lucas Khoi Nguyen Asgedom Grehiwot Mircea Bec Meshari Ebrahim Faculty Advisor: Dr. Faryar Etesami Industrial Adviosr :
. Client : Dr. Lynn Beck Department of Economics.
IAAF AND LOCAL APPROACHES TO MEDIA OPERATIONS GAISF Media Workshop, Beijing, April 2007.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Project Status Report Presenter Name Presentation Date.
GROW Partner Fair 18 January 2006 Workshop on Contracts and Finance GROW Secretariat Alison Partridge and Sally Kneeshaw – Contract Manager.
Basic Approach Development driven by time boxing May sacrifice requirements in order to keep schedule (time boxed) Steer project as you go based on user.
Capstone Team -Andre Nylund -Chris Grewell -Craig Lechtenberg -Fadel Al Jutail -Matt Melius -Mufeed Yacoub Team Advisor -Dr. Raul Bayoán Cal.
[Date] Next Review [Date] [Agency] Project Review 1.
| BSIS Power To Arrest Class: | William Kitchen| Founder Of JJSPA.
Cross-Country Sit Ski Cody Barnett Betsy Camp Josh Metzler Robbie Quesada Mark Scheel Alex Triplett Academic Advisor: Dr. Hormoz Zareh Industry Advisor:
Abstract Combines are used in fields to perform the complex operations necessary to effectively harvest crops. The swath width detection system would assist.
Classification of types of tourism
Long-Term Planning Process Draft for Discussion Purposes.
Do Now When designing an airplane, what do you think are the most important factors you need to consider to make the airplane fly? List AS MANY things.
Business Project Plan Presenter Name | Company Name.
Launch meeting < Customer name >
Cross-Country Sit Ski Progress Report Cody Barnett Betsy Camp Josh Metzler Robbie Quesada Mark Scheel Alex Triplett Academic Advisor: Dr. Hormoz Zareh.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
Project Close Out Insert project name Presented by: name and title Date.
Program Management Team Framework Strawman Vancouver June 2001 Sprint PCS ®
Blaenau Gwent and Caerphilly Integration March 2012 Update.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
TEAM ADAPTIVE REC Members Advisors Dale Calnek Jerel Hutapea Chang-Won Park Casey Radtke Academic: Dr. Sung Yi Industry: Jennifer Armbruster Todd Bauch.
- ARL Position Description Bank -. Welcome and Greeting Brian W. Keith Associate Dean, Administrative Services and Faculty Affairs Brian W. Keith Associate.
Group 18 Chen Zhang Client: Professor Frank Yin Sept. 30, 2015 Smart Walker Project PRELIMINARY PRESENTATION.
Harnessing Your Projects: Using Project Management Techniques and Basecamp in Libraries Presented by: Barbara Lewis Coordinator for Digital Collections.
BioRainbow Development Process Description. Development Process Overview We use combination of MSF development technology ( Extreme.
Financial System Upgrade Agency Change Champion Deployment Session March 16 th, 2006.
Work Plan Work Plan Management (Document 21)
PRIORITISATION FOR SCHOOL SPORT SUPPORT
Software Project Management
Agenda Item 2: Catch up session 15 May 2017
CUCSA Workgroup Chair Orientation
Dr. Marcos Esterman Faculty Guide W. Casolara Project Leader
Presenter Name | Company Name
Presenter Name | Company Name
Presenter Name | Company Name
Evacuation Chair Safety Training
Evacuation Chair Safety Training
Presenter Name | Company Name
Building Coordinators
Cross-Country Sit Ski Progress Report
[Project Name] Project Report
Presenter Name | Company Name
Performance Portfolio
Presenter Name | Company Name
[Project Name] Project Report
“In Paint” Communication Kick-off meeting Patrizia Di Mauro
Presenter Name | Company Name
<Project Name> Milestone Summary Report
Evacuation Chair Safety Training
P17082 Integrated System Build & Test Review
Presenter Name | Company Name
Presentation title. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Praesent eu risus cursus, aliquet mi vel, varius purus. Nulla efficitur, nisl.
Presentation transcript:

Cross-Country Sit Ski Cody Barnett Betsy Camp Josh Metzler Robbie Quesada Mark Scheel Alex Triplett

Agenda Project Description Customers Schedule Milestones Key PDS Risk Management

Introduction What is a sit ski? – Equipment used by disabled athletes to ski Downhill – Bi – Mono Cross Country

Project Description Design and build cross country sit ski for PSU Adaptive Rec – Accommodate varying levels of user disability – Accommodate varying size of user

Customers External Customers – PSU Adaptive Recreation Department – PSU Students participating in Adaptive Rec group trips Internal Customers – Capstone Team – Professor Etesami-Capstone Project Coordinator

Project Schedule Milestones Start DateFinish Date Design December 1April 15 Manufacturing April 5May 16 Testing May 17May 31 Final Delivery June 8

Key Product Design Specifications Fully Adjustable – Foot/back rest – Seat angle Can support a maximum user weight of 280 lb Ergonomic/comfortable Ski weight <20lb Mates with traditional skis and bindings

Risk Management Tipping Uncontrolled Descent Pressure Sores/Rubbing Bindings/Skis Damage and Wear Over Budget

Questions