Bruno Vullierme 16-18 Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.

Slides:



Advertisements
Similar presentations
Cryogenic system in P4: Possible options S. Claudet & U. Wagner LHC Workshop, “Chamonix XlV” January 2005 (Mostly for RF & beam scrubbing)
Advertisements

Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
Cryogenic Experts Meeting (19 ~ ) Helium distribution system for Super-FRS dipoles and multiplets MT/FAIR – Cryogenics and Magnets Y. Xiang,
RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
A. Perin, CERN, TE-CRG, 26 May Review of the cryogenic by-pass for the LHC DS collimators 26 May 2011 Modifications to the DFBs, DSLC and cryogenic.
Design pressure issues of Super-FRS dipole CrYogenic Department in Common System (CSCY), GSI, Darmstadt Yu Xiang, Hans Mueller* * Primay Beam Magnet Technology.
LHC Crab Cavities - Phase 1 - Schedule 2008 Mini Workshop - reminder Activities & Planning Planning Remarks 1 LHC-CC09, 3rd Crab Cavity Workshop - Session.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
September 19/20, 2007 SIS 100 Magnet cooling and cryogenic distribution.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
Experience with LEP (and LHC) cryo-modules Workshop on cryogenic and vacuum sectorisations of the SPL O.Brunner – November ’09.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
R. van Weelderen, LIUWG, IT upgrade phase I: Status of cryogenic scheme evolution (in work) Outline - Old & new layout - Design constraints.
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
Dimensions, pressures and temperatures of cryogenic circuits for the SPL U. Wagner TE-CRG.
The integration of 420 m detectors into the LHC
Can we change a magnet without warming-up a full arc ? Serge Claudet, With help from P. Cruikshank & J-P. Tock (Chamonix Jan’10)
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
TE-CRG Activities D. Delikaris, TE-CRG.
Cryogenic Cooling Schemes for the SPL U. Wagner TE-CRG.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Crab cavities – cryogenics for SPS and LHC LHC-CC13, 6 th LHC Crab Cavity Workshop – CERN, Geneva, Switzerland 9-11 December 2013 K. Brodzinski on behalf.
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
LHC Machine Advisory Committee Meeting no.19 QRL status 16 June 2006 G. Riddone, AT-ACR On behalf of the QRL team.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
Overview of the ESS Linac Cryogenic Distribution System
ColUSM #63 18 th September, 2015 D. Ramos, C. Mucher, L. Gentini, H. Prin, Q. Deliege, A. Bastard, J. Hrivnak.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
SIS 100 Vacuum chamber Recooler String system Components
Final Design Cryogenic and mechanical configurations
R. Panchal, GLN Srikanth, K. Patel, P. Shah, P. Panchal,
HFM Test Station Main Cryostat
SPS cryogenic proximity equipment and SM18 validation
BDS Cryogenic System RDR Status and EDR Plans
Hollow e- lens, Cryogenic aspects
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
CERN Cryomodule Requirements for Crab Cavities
ILC Cryogenic Systems Draft EDR Plan
The 11T cryo-assembly: summary of design and integration aspects
Cryostat design Mechanical design: Thermal screens: Specifications:
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
ILC Experimental Hall Cryogenics An Overview
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
ESS elliptical cryomodule
Presentation transcript:

Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION

Crab Cavity Integration Bruno Vullierme Cryogenics Installation Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 2 Crab Cavities Phase I, stated issues  Extension of main RF vs. specific cryogenic lines  Operating temperature, pressure  Heat loads  Cryogenic circuits and controls  Safety valves and protection  Overall installation effort and time line  Impact on the LHC during prototype tests and regular operation

Crab Cavity Integration Bruno Vullierme Cryogenics Installation Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 3 Crab cavities Phase I, context  The operating temperature of 2 K is preferred for 800 MHz superconducting cavity.  However, the physical constraints and the availability of the 2  30 mbar may limit the operating temperature to 4.6 K.  Cavity Losses 50 2 K or 4.6 K  Helium volume litre

Crab Cavity Integration Bruno Vullierme Cryogenics Installation Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 4 Extension of main RF lines for CC ?  First guess: it is not possible to simply extend the existing line feeding the ACS RF system in order to independently supply the Crab Cavity (CC) cryostat with 4.6 K: all the control valves required for the level and pressure control of ACS cryomodules are located on a dedicated Cryogenic Ring Line (so-called QRL) Service Module. CC ??

Crab Cavity Integration Bruno Vullierme Cryogenics Installation Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 5 Present QRL Service Module ACS

Crab Cavity Integration Bruno Vullierme Cryogenics Installation Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 6 Specific cryo-lines to QRL pipe elements ?  The preliminary study shows that there is not enough space to install additional standard (  800 mm) QRL service modules (integration problems due to space with respect to vault, to CC cryostat, position of possible slots).  Special QRL interface to CC cryostat is not considered. Section RB44 Section RB46

Crab Cavity Integration Bruno Vullierme Cryogenics Installation Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 7 OPTION 1 – New QRL Service Modules  The first option would be to replace both present QRL service modules for the RF system at P4 – and to modify both present QRL extensions to ACS RF system –  The required QRL service modules would be of new design, possibly with a double jumper, with a heat exchanger and 5 additional valves. The length excepted, no major design nor integration problem is expected.  The replacement of the 2 QRL service modules requires:  Removal and reinstallation of neighboring ACS cryomodules  20 critical cuts and welds on the 5 QRL headers  5 to 6 weeks for dismantling/installation (cryo only)  Nearly global pressure tests for both 3-4 and 4-5 LHC sectors  Cost for such QRL modifications : > 1 MCHF

Crab Cavity Integration Bruno Vullierme Cryogenics Installation Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 8 OPTION 1 – QRL Modification for 2 K  CC design pressure: 3.5 bar  CC operating pressure: saturated 2 K  Helium guard required on CC safety (sub-atmospheric) circuits  Additional cooling power of 50 2 K is available for CC

Crab Cavity Integration Bruno Vullierme Cryogenics Installation Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 9 New type of QRL Service Module Redesign required (length, Hx, valves…) ACS CC

Crab Cavity Integration Bruno Vullierme Cryogenics Installation Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 10 OPTION 2 – 4.6 K  The straightforward solution is to finally modify the supply and return lines of the QRL extension to one of the two ACS cryomodules, in order to connect the CC in parallel, via an additional set of valves.

Crab Cavity Integration Bruno Vullierme Cryogenics Installation Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 11 OPTION 2 – 4.6 K, integration  The present elbow region of the QRL extension to the ACS can be cut and replaced by a T-shape part (+ 4 control valves, + safety circuits, + 2 cryogenic lines with bayonets to CC cryostat)  Installation:  1 week, local pressure and leak tests only, not critical

Crab Cavity Integration Bruno Vullierme Cryogenics Installation Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 12 OPTION 2 – 4.6 K, main features  Design pressure of CC helium vessel: 3.5 bar  CC helium pressure, temperature: bar,  4.6 K  The CC required flow rate of g/s of helium at 4.6 K from QRL header “C “ should be available.  The flow coefficient of the existing QRL supply and return control valves can be increased (ACS + CC He flow rates ).  Controls: liquid helium level and pressure controls with dedicated control (and shut-off) valves.  Safety: non-return valves to QRL header “D”, possible pressure interlocks (QRL header “C”, QRL header “D”, ACS)  Possibility of using an additional circuit for helium return to the Warm Recovery Line via an electrical heater, during magnet quenches (i.e. pressurization of QRL header “D”).

Crab Cavity Integration Bruno Vullierme Cryogenics Installation Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 13 CC Phase I cryo-installation – Summary OPTION 1OPTION 2 Saturated liquid helium temperature2 K4.6 K Heat temperature50 W W Removal/reinstallation of ACS cryomodulesYes (time?)None QRL Service Module replacement Yes,  6 weeks None Installation of QRL Extensions to ACS and CC  2 weeks  1 week Nearly global LHC sector pressure testsYes (2 x 1 week)None Impact on LHC during prototype testsMarginalNot critical Impact on LHC during regular operationMarginalNot critical * Total installation time (QRL cryogenics only)  10 weeks  1 week Cost> 1 MCHF  150 kCHF