Prepared for the Annuity Reserve Work Group By Steve Strommen FSA, CERA, MAAA May 1, 2013 POTENTIAL RESERVE METHODOLOGY.

Slides:



Advertisements
Similar presentations
LIBOR Finance 101.
Advertisements

Copyright © 2008 Prentice Hall All rights reserved 9-1 Capital Investment Decisions and the Time Value of Money Chapter 9.
© Mcgraw-Hill Companies, 2008 Farm Management Chapter 17 Investment Analysis.
Time Value of Money Interest –Market price of money Supply – lending rate Demand – borrow rate Difference – margin for lender –Makes values at different.
Intensive Actuarial Training for Bulgaria January, 2007 Lecture 2 – Life Annuity By Michael Sze, PhD, FSA, CFA.
CHAPTER 4 BOND PRICES, BOND YIELDS, AND INTEREST RATE RISK.
Chapter 21 Value at Risk Options, Futures, and Other Derivatives, 8th Edition, Copyright © John C. Hull 2012.
The VaR Measure Chapter 8
VAR.
Engineering Economic Analysis Canadian Edition
Chapter 8 Estimation: Additional Topics
The Representative Scenarios Method (RSM) Field Test Phase 1: Fixed Annuities Slides prepared by Steve Strommen, FSA, CERA, MAAA Blufftop LLC March, 2015.
Risk, Return, and Discount Rates Capital Market History The Risk/Return Relation Applications to Corporate Finance.
Market-Risk Measurement
Reserve Variability Modeling: Correlation 2007 Casualty Loss Reserve Seminar San Diego, California September 10-11, 2007 Mark R. Shapland, FCAS, ASA, MAAA.
Chap 9-1 Statistics for Business and Economics, 6e © 2007 Pearson Education, Inc. Chapter 9 Estimation: Additional Topics Statistics for Business and Economics.
Risk, Return, and Discount Rates Capital Market History The Risk/Return Relation Application to Corporate Finance.
Risk, Return, and Discount Rates Capital Market History The Risk/Return Relation Applications to Corporate Finance.
Slide 15-1 Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin Chapter Fifteen Leases.
1/49 EF 507 QUANTITATIVE METHODS FOR ECONOMICS AND FINANCE FALL 2008 Chapter 9 Estimation: Additional Topics.
Test 2 solution sketches Note for multiple-choice questions: Choose the closest answer.
BOND PRICES AND INTEREST RATE RISK
Intensive Actuarial Training for Bulgaria January 2007 Lecture 4 – Life Insurance Reserve & Minimum Capital By Michael Sze, PhD, FSA, CFA.
Final solution sketches Note for multiple-choice questions: Choose the closest answer.
Options, Futures, and Other Derivatives 6 th Edition, Copyright © John C. Hull Chapter 18 Value at Risk.
Value at Risk.
Chapter 6 Economic Concepts: Behind The Accounting Numbers Mark Higgins Chapter 6 Economic Concepts: Behind The Accounting Numbers Mark Higgins.
Irwin/McGraw-Hill 1 Market Risk Chapter 10 Financial Institutions Management, 3/e By Anthony Saunders.
©2003 McGraw-Hill Companies Inc. All rights reserved Slides by Kenneth StantonMcGraw Hill / Irwin Chapter Market Risk.
Integrating Reserve Risk Models into Economic Capital Models Stuart White, Corporate Actuary Casualty Loss Reserve Seminar, Washington D.C September.
FINANCIAL CONDITION REPORTING Ioana Abrahams 13 November 2009.
Final exam solution sketches Winter 2014, Version A Note for multiple-choice questions: Choose the closest answer.
Chapter 26 Capital Investment Decisions
The Reserving Actuary’s Role in Risk Assessment: Value Added by the Reserving Actuary in Identifying and Helping Mitigate Financial Risk Both on the Balance.
Chapter 20. Describe the importance of capital investments and the capital budgeting process.
Lecture 10 The Capital Asset Pricing Model Expectation, variance, standard error (deviation), covariance, and correlation of returns may be based on.
Financial Risk Management of Insurance Enterprises Finding the Immunizing Investment for Insurance Liabilities: The Case of the SPDA.
TOPIC THREE Chapter 4: Understanding Risk and Return By Diana Beal and Michelle Goyen.
1 Value at Risk Chapter The Question Being Asked in VaR “What loss level is such that we are X % confident it will not be exceeded in N business.
The Actuary’s Evolving Role in Enterprise Risk Management A Case Study 2001 Casualty Loss Reserve Seminar Barry A. Franklin, FCAS, MAAA Managing Director.
Topic 5. Measuring Credit Risk (Loan portfolio)
Engineering Economic Analysis Canadian Edition
5847 San Felipe, Suite 4100, Houston, Texas (713) (800) (713) (Fax) INVESTING IN RETIREMENT THE GAME HAS CHANGED … OR HAS.
Fundamentals of Futures and Options Markets, 5 th Edition, Copyright © John C. Hull Value at Risk Chapter 18.
Investment Analysis and Portfolio Management First Canadian Edition By Reilly, Brown, Hedges, Chang 6.
Value at Risk Chapter 16. The Question Being Asked in VaR “What loss level is such that we are X % confident it will not be exceeded in N business days?”
Valuing an Insurance Enterprise and Reserve Estimates Using Bootstrapped Statutory Loss Information William C. Scheel DFA Technologies, LLC
© 2008 Morningstar, Inc. All rights reserved. 3/1/2008 LCN Role of Immediate Annuities in Retirement.
Measurement of Market Risk. Market Risk Directional risk Relative value risk Price risk Liquidity risk Type of measurements –scenario analysis –statistical.
2009 Annual Meeting ● Assemblée annuelle 2009 Halifax, Nova Scotia ● Halifax (Nouvelle-Écosse) 2009 Annual Meeting ● Assemblée annuelle 2009 Halifax, Nova.
 Measures the potential loss in value of a risky asset or portfolio over a defined period for a given confidence interval  For example: ◦ If the VaR.
Value at Risk Chapter 20 Options, Futures, and Other Derivatives, 7th International Edition, Copyright © John C. Hull 2008.
Chapter 7 Financial Operations of Insurers. Copyright ©2014 Pearson Education, Inc. All rights reserved.7-2 Agenda Property and Casualty Insurers Life.
Options, Futures, and Other Derivatives, 5th edition © 2002 by John C. Hull 16.1 Value at Risk Chapter 16.
Options, Futures, and Other Derivatives, 4th edition © 1999 by John C. Hull 14.1 Value at Risk Chapter 14.
1 Ch 7: Project Analysis Under Risk Incorporating Risk Into Project Analysis Through Adjustments To The Discount Rate, and By The Certainty Equivalent.
Part Three: Information for decision-making Chapter Thirteen Capital investment decisions: Appraisal methods Use with Management and Cost Accounting 8e.
Aggregate margins in the context of level premium term life insurance Results of a study sponsored by the Kansas Insurance Department Slides prepared by.
Types of risk Market risk
Value at Risk and Expected Shortfall
Market-Risk Measurement
Casualty Actuarial Society Practical discounting and risk adjustment issues relating to property/casualty claim liabilities Research conducted.
Managing Underwriting Risk & Capital
Capital Budgeting Decisions
Types of risk Market risk
Insurance IFRS Seminar December 1, 2016 Darryl Wagner Session 17
Insurance IFRS Seminar December 1, 2016 Darryl Wagner Session 17
Value at Risk Chapter 9.
Valuation and Capital: Segregated Fund Guarantees
Presentation transcript:

Prepared for the Annuity Reserve Work Group By Steve Strommen FSA, CERA, MAAA May 1, 2013 POTENTIAL RESERVE METHODOLOGY

A PRINCIPLES-BASED APPROACH Starts with small set of scenarios for each assumption Includes “best estimate”, some good, some equally bad Probability weight assigned to each scenario Uses “Scenario Reserves” Present value of cash flows using scenario-specific assumptions Discounted using the portfolio earned rate in the scenario Final “best estimate” reserve is probability-weighted average of scenario reserves Capital and aggregate reserve margin are based on differences of scenario reserves from “best estimate”

CONSTRUCTING THE SCENARIOS

USING STATISTICS OF RANDOM WALKS Each time period is one step forward Sideways (up or down) step each period averages zero, but has std. deviation = 1

USING STATISTICS OF RANDOM WALKS

CONSTRUCTING THE SCENARIOS

CONSTRUCTING THE SCENARIOS SHOCKS MEASURED IN STANDARD DEVIATIONS

CONSTRUCTING THE SCENARIOS SHOCKS MEASURED AT PERCENTILE LEVEL

CONSTRUCTING THE SCENARIOS INTEREST RATES – USE SCENARIO SHOCKS IN THE GENERATOR

CONSTRUCTING THE SCENARIOS OTHER ASSUMPTIONS Assume we know the distribution function for each year for each assumption Simple illustration for a lapse rate with 5% “best estimate”:

CONSTRUCTING THE SCENARIOS For simplicity, if we assume the same distribution for each projection year, we get the following scenarios: Sets of scenarios like this can be generated at any number of std. deviations. (any probability level). One set could be at the level for reserves, one at the level for capital.

CONSTRUCTING THE SCENARIOS MORTALITY At least two separate aspects Random variation around the best estimate Can be handled much like lapse rates illustrated earlier Trend Need a “best estimate” trend, e.g. a projection scale Need a distribution for the annual mortality improvement factor in order to apply the methodology illustrated earlier. Scenarios would involve faster or slower improvement, based on percentage points in the distribution of annual mortality improvement rates.

CREATING THE SCENARIOS ELECTION RATES Election rates are sensitive to “money-ness” Degree of sensitivity is uncertain One could develop a probability distribution for a “sensitivity factor” Scenarios would vary by level of sensitivity factor Example: Define M = “moneyness” = (value of option) / (best est. reserve for contract) Define sensitivity factor S Scenario election rates = (best est.) + S(M-1) 2 Value of S is calibrated to desired percentile point on its distribution

CALCULATING THE RESERVE SAMPLE PRODUCT - SPDA WITH GLIB Current cash value = $100,000 Guaranteed minimum crediting rate = 2.5% GLIB roll-up rate = 5.0% Attained age 50 Best estimate scenario reserve = $95,000 These parameters are purely to set the stage for thinking about the calculation. All calculation results to be shown are purely illustrative and have not been developed from an actual model (yet).

CALCULATING THE RESERVE Choose a set of critical (sensitive) reserve assumptions, e.g. Investment returns Mortality Lapse GLIB option election rates For each assumption, generate 5 (or more) scenarios, e.g. 3 std. deviations worse than expected 1 std. deviation worse than expected As expected 1 std. deviation better than expected 3 std. deviations better than expected

CALCULATING THE RESERVE Calculate “scenario reserve” for each scenario for each assumption “Best estimate” is probability-weighted average “scenario reserve” This is an average over all assumptions, not each assumption separately Capital required for each assumption is excess of greatest scenario reserve for that assumption over the “best estimate”. Aggregate capital requirement is sum of amounts for each assumption, adjusted for correlation Aggregate margin can be based on the capital requirement Details to be covered later

Illustrative Reserve Calculation SPDA, Current Cash Value = $100,000 RiskScenario Scenario reserve Scenario weight Wgt. avg. scen. res. Capital required MortalityExtremely Good 93, ,112 - MortalityGood 94, ,112 - MortalityBest Estimate 95, ,112 - MortalityBad 96, ,112 1,388 MortalityExtremely Bad 99, ,112 3,888 = M LapseExtremely Good 94, ,112 - LapseGood 94, ,112 - LapseBest Estimate 95, ,112 - LapseBad 95, , LapseExtremely Bad 97, ,112 1,888 = L GLIB electionExtremely Good 93, ,112 - GLIB electionGood 94, ,112 - GLIB electionBest Estimate 95, ,112 - GLIB electionBad 97, ,112 1,888 GLIB electionExtremely Bad 100, ,112 4,888 = G InvestmentExtremely Good 94, ,112 - InvestmentGood 94, ,112 - InvestmentBest Estimate 95, ,112 - InvestmentBad 96, , InvestmentExtremely Bad 98, ,112 2,888 = I Combined total capital: 10,417 Reserve margin = PV of 6% of capital = 5,000 Total reserve : 100,112

CALCULATING THE AGGREGATE MARGIN CONFIDENCE LEVEL METHOD TAR is “best estimate” reserve + 3 std. deviations Aggregate reserve margin is 1 std. deviation, capital is 2 std. deviations Conceptual problem (my opinion) If reserve margin is not released when adverse event occurs, then capital of 2 std. deviations is not sufficient for 3 std. deviation event. Company is left with assets less than reserves and needs not only a capital infusion (obtainable from capital markets) but a reserve infusion from guarantee funds.

CALCULATING THE AGGREGATE MARGIN COST OF CAPITAL METHOD TAR is “best est.” reserve plus aggregate reserve margin plus capital Capital is 3 std. deviations (not 2) May be measured over shorter period, leading to comparable level Resolves conceptual problem of confidence level method (my opinion) Aggregate reserve margin is PV of “cost of capital” Cost of capital is e.g. 6% of annual projected capital requirement Capital requirement projection is required Projected capital can be estimated as % of projected best est. reserve or by 2 or 3 factor formula calibrated to initial capital Not uncommon for aggregate margin to be approximately half of capital for a long term contract (PV annuity factor ~ 8, and 6% x 8 = 48%) This is comparable to ratio of reserve margin / capital for the confidence level method

TESTING THE RESERVE Reserve adequacy testing (a.k.a. cash flow testing) would still be performed This could be transformed into a series of specified stress tests that combine adverse experience on more than one risk. As with cash flow testing today, the actuary would apply judgment when determining whether to increase reserves based on stress test results.