State of play of Corridor X Technical Secretariat Pan-European Transport Corridor X REPUBLIC OF GREECE MINISTRY OF INFRASTRUCTURE, TRANSPORT AND NETWORKS.

Slides:



Advertisements
Similar presentations
IMPLEMENTATION OF THE STANDARD GAUGE IN THE MEDITERRANEAN CORRIDOR. Cartagena- French border.
Advertisements

Mitja Kosec – Project Manager
OPERATIONAL PROGRAMME ON “TRANSPORT” 2007 – 2013 Vessela Gospodinova Deputy minister of transport Nearer and closer.
OPERATIONAL PROGRAMME ON TRANSPORT Nelly Yordanova Head of Managing Authority Structural Funds in Bulgaria: Possibilities in Environment, Infrastructure,
Role of State Role of State in implementation of major PPP road projects Panagiotis Patsiadas Deputy Head of Contracts & Bids Unit, International Project.
THE MODERNIZATION PROJECTS OF OSE’S RAILWAY NETWORK, WHICH ARE IMPLEMENTED WITH THE FINANCIAL SUPPORT OF EUROPEAN UNION FUNDS (EUROPEAN REGIONAL DEVELOPMENT.
ARISTOTELION UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
Meeting AECOM, AM SOP-T, CFR, JASPERS
Regional Transport Projects, Improving the Business Climate by Investing in Modern Transport. Role of the Governments and Opportunities for PPPs Southeast.
Montenegro Ministry of Transport, Maritime Affairs and Telecommunications Vienna Economic Forum »Invest in Montenegro. Invest in the Region « M I N I S.
THE TRANS-AFRICAN HIGHWAY NETWORK
Access to Intermodal Supply Chain Networks
Belgrade, 21. January 2010 Short information on Pilot project on time measurement of border procedures at Obrežje (SLO) – Bregana (CRO) border crossing.
11th meeting of the Steering Committee for Pan-European Corridor X Belgrade, Republic of Serbia
„Shaping the Future“ Federal Ministry of Transport, Innovation and Technology UN-ECE INLAND TRANSPORT COMMITTEE Working Party on Transport Trends and Economics.
Chairman: G. Patsiavos, Head of International Affairs Division, Greek Ministry of Transport and Communications Secretary: Ch. Taxiltaris, Professor Members:
8th Meeting of the Working Group for the improvement of border crossings along the Pan-European Corridor X Belgrade, Republic of Serbia
ARISTOTELION UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
ARISTOTELION UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
ARISTOTELION UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
Agenda Item 4: Activity Report – Progress since the last meeting of the Group Technical Secretariat Pan-European Transport Corridor X Aristotle University.
PAN-EUROPEAN TRANSPORT CORRIDOR PRODEXPO 2007 Athens, October M. Miltiadou, Transport Engineer Technical Secretariat Pan-European Transport Corridor.
Pan-European Corridor X: State of Play and Perspectives M. Miltiadou, Surveyor & Transport Engineer MSc Member of the Technical Secretariat of the Steering.
ARISTOTLE UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
MINISTRY OF TRANSPORT OF THE REPUBLIC OF LATVIA Implementation of Cohesion Fund Projects in Transport Sector Cohesion Fund Monitoring Committee 11 April.
Imagine the result European Infrastructure Friedrich Schneider, Executive Board Member August 4, 2010.
Presentation WG 2 Managing EU Funds on the Regional Level Republic of Albania Ministry of European Integration (MEI) Regional Conference EU Perspectives.
THE PORTUGUESE EXPERIENCE WITH “EU” FUNDING MECHANISMS.
Activity Report of the Technical Secretariat and the Steering Committee for Pan- European Corridor X Technical Secretariat Pan-European Transport Corridor.
Ministry of Transportation Ontario Road Builder’s Association October 20, 2011 Central Region Highway Program.
INFRASTRUCTURE COMPANY
10 th Cohesion Fund 1164/94/ISPA Monitoring Committee Meeting – 25 January 2012 GENERAL REPORT ON MEASURES managed by Ministry of Transport, Information.
Project Acronim: ZONES AND ROADS Project duration: 15 months Priority axis: 1. Enhancement of cross- border economic development Measure: 1.1. Economic.
HŽ Passenger Transport – overviewBUCHAREST HŽ PASSENGER TRANSPORT.
Operational Programme on Transport Coordination of Programmes and Projects Directorate December 2007 Ministry of Transport.
OP Transport 2007 – 2013 and JASPERS Ministry of Transport.
Road infrastructure in Bulgaria 1 Slovene – Bulgarian Business Forum, 12 th May 2010 Vasilka Kostadinova Director of Directorate “Implementation of EU.
Republic of Croatia and EGTC. Content – Croatia and EU FUNDS 2013/2014. – – Croatia and EU FUNDS 2013/2014. – Croatia and European Groupings.
STATE POLICY AND PERSPECTIVES FOR DEVELOPMENT OF THE RAILWAY INFRASTRUCTURE MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS REPUBLIC OF.
POTENTIAL AND ADVANTAGES FOR FOREIGN INVESTMENTS IN SERBIA Centre for Development, Restructuring and Privatization 2013.
BMVIT - Shaping the Future Federal Ministry of Transport, Innovation and Technology PAN-EUROPEAN TRANSPORT CORRIDOR X STEERING COMMITTEE MEETING Belgrade,
9 th Cohesion Fund 1164/94/ISPA Monitoring Committee Meeting – 29 June 2011 GENERAL REPORT ON MEASURES managed by Ministry of Transport, Information Technology.
H\projects\controls\ekdilosi\tecnoman\ ppt Prospects of drafting Prospects of drafting Black Sea Ring Highway Black Sea Ring Highway Master Plan.
SEETO Comprehensive Rail Network Development
28th November 2008, Brussels1 Railway Infrastructure Administration, state organization EFRTC General Assembly 28th November 2008Brussels, Belgium Infrastructure.
Mr Jonathan Scheele - Director for the Trans-European Network - Transport POLICY ON THE EXTENSION OF THE MAJOR TRANS-NATIONAL AXES Council Working Group.
Priorities in the sector “Transport”
ХVII Meeting of the Monitoring Committee of Operational programme “Transport” November 2014 г. Pravets.
the Republic of Moldova
MINISTRY OF TRANSPORT OF THE REPUBLIC OF LATVIA Cohesion Fund Monitoring Committee 11 April 2008.
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA Progress of Riga and Pieriga Mobility Plan (RRMP) Andulis Židkovs Deputy State Secretary,
Different aspects of Latvian Railway Sector
Compania Naţională de Căi Ferate National Railway Company “CFR” S.A. Bucharest, October 6 th, 2015 Building the new railway economy Challenges & Opportunities.
The National Strategy of Slovak Republic
LJUBLJANA, November 2006 Goverment of the Republic of Slovenia Ministrstry of Transport PREPARATIONS AND CONSTRUCTION TIMING OF MAIN RAILWAY LINES IN DIRECTIONS.
The National Strategy of Slovak Republic Ing. Iveta Kubasáková, PhD.- Ing. Ivana Šimková University of Zilina, Faculty of Operation and Economics of Transport.
Sectoral Operational Programme on Transport Coordination of Programmes and Projects Directorate 2 October, 2006 Ministry of Transport.
Slovenia, its geo-strategic position and main infrastructure investments Peter Gašperšič Ph.D. Minister Brussels, March 3, 2016.
VI Session of the Monitoring Committee of
Ms. Nerejda Hoxha, SEETO Transport Planning Manager
SEETO Investment Report 2016
The SEESARI initiative – “From vision to action“
By Mr. Michalis P. Adamantiadis, Regional Adviser
The current situation of intermodal transport in Serbia
RING OF CHISINAU AS PART OF TENT - NETWORK
»Invest in Montenegro. Invest in the Region «
Ministry of Capital Investments Republic of Serbia
Aleksandar Nikcevic, Principal Banker
PUBLIC ENTERPRISE ROADS OF SERBIA.
Railway Infrastructure Projects
Presentation transcript:

State of play of Corridor X Technical Secretariat Pan-European Transport Corridor X REPUBLIC OF GREECE MINISTRY OF INFRASTRUCTURE, TRANSPORT AND NETWORKS INTERNATIONAL AFFAIRS DIVISION Aristotle University of Thessaloniki Egnatia Str., Thessaloniki, Greece, tel , fax , Website: 11 th Meeting of the Steering Committee for Pan-European Corridor X Belgrade, 22 January 2010

Total length: 2.299,6km 74% of the road network consists of motorways  Main Axis: 1.451,4km [87,4% motorways]  Branch A: 163,4km [73,7% motorways]  Branch B: 352,9km [70,3% motorways]  Branch C: 191,8km [7,5% motorways]  Branch D: 140,1km In 2009:  Completion of 20,5km sector on the Main Axis in South Serbia, between Levosoje and Presevo.  Completion of two 10km sectors on Corridor X Branch B in North Serbia, on the section Novi Sad and Horgos.  Expected completion of the entire motorway on the Main Axis in Slovenia between Bic and Obrezje (75,5km).  Financing secured for Grabovnica (Leskovac) – Levosoje (74,1), Nis (Prosek) - Dimitrovgrad (83,4km). By 2015: 90,3% of the network will be motorways State of play of Road Corridor X

Total length: 2.528,2km 89,3% electrified 63% single track alignment – 37% double track alignment  Main Axis: 1742,3km (55% single track alignment – Fully electrified)  Branch A: 154,3km (70% double track alignment – Fully electrified)  Branch B: 305,6km (96% single track alignment – Fully electrified)  Branch C: 161,0km (95% single track alignment – 65% diesel)  Branch D: 165,0km (100% single track alignment – Fully diesel) Limited investments for the improvement of the railway infrastructure by Not doubling of tracks, except from some sections in Austria. Priority in rehabilitation and upgrading projects On-going rehabilitation of lines in Croatia and Serbia State of play of Rail Corridor X

Road Corridor  Transformation of existing highway to motorway standards underway on the Main Axis 77km By 2013 Cost 180mo€ (55% financing by EC) Studies are on-going (partly financed by ERDF)  Highway construction underway on Branch D 14,6km Cost 32,2mo€ Studies completed Project construction in procurement phase Progress of Corridor X in Greece

Rail Corridor  Electrification and line modernization completed on the Main Axis in 2006  Construction on going of the new line Polykastro – Eidomeni, in four phases Cost 95mo€ 1 st phase: works completed in March 2009 (substructure for double track, new bridge over Axios River 755m, superstructure for single track, etc.) 2 nd phase: works on-going, to be completed in March rd phase: superstructure and electrification works 4 th phase: signaling, phyto-technical and signaling works and construction of new stations in Polykastron and Mikro Dasos and renovation of border station Eidomeni Completion of entire project by December 2012  Branch D modernization completed in 2006 Progress of Corridor X in Greece