I-294/I-80 RECONSTRUCTION RE-CONSTRUCTION OF A 2-MILE SECTION OF THE TOLL WAY THAT STARTED FROM MARKHAM YARD BRIDGE AND EXTENDED EASTERLY TO DANVILLE ROAD. ABOVE PHOTOS: MAINLINE BRIDGE OVER THE THORNTON QUARRY OPERATED BY MATERIAL SERVICE CORP LOCATED IN THORNTON, ILLINOIS.
INTERSTATE 355 SOUTH EXTENSION THE I-355 SOUTH EXTENSION CONSTRUCTION FROM I-55 to I-80 LOCATED IN WILL AND COOK COUNTY, ILLINOIS. THE PHOTO AT THE RIGHT IS THE 1.2-MILE LONG BRIDGE OVER THE DES PLAINES RIVER (I & M CANAL) WHICH IS A PORTION OF THE 12.5 MILES TOLLWAY PROJECT.
ILLINOIS ROUTE 34 RECONSTRUCTION AND WIDENING OF A 2-MILE SECTION OF THE ROADWAY STARTED FROM LEW STREET AND EXDENDING TO ELDAMAINE STREET IN PLANO, ILLINOIS.
I-57/IL-50 INTERCHANGE RECONSTRUCTION – IN BRADLEY, ILLINOIS LEFT PHOTO: BRIDGE OVER ILLINOIS ROUTE 50. RIGHT PHOTO: BRIDGE OVER ILLINOIS CENTRAL RAIL ROAD
FPDCC IMPROVEMENTS LEFT PHOTO: CONSTRUCTION OF PHYSICAL EXERCISE STAIR AT THE SWALLOW CLIFF RIGHT PHOTO: CONSTRUCTION OF FISHING PLATFORM AND INSTALLATION OF RIPRAP ALONG THE BANK OF MAPLE LAKE. BOTH PHOTOS ARE LOCATED IN PALOS HILLS, ILLINOIS