EURISOL DS Task 11.2 Universidad de Santiago de Compostela, Spain Eurisol DS: task 11 meeting March‘05
Subtask description Preparation of an experiment to investigate residual nuclei production in the reaction 132 Sn+Be at different energies and data taking of the experiment Analyze data, provide production cross sections and validate and improve model calculations on fragmentation of neutron-rich projectiles Eurisol DS: task 11 meeting March‘05
Implementation plan for the first twelve months Preparation of the experiment proposal and submission to the GSI PAC. Construction of specific detectors required for this experiment new readout for ADCs to increase the acquisition rate Eurisol DS: task 11 meeting March‘05 Detailed planification of the experiment Beam time preparation: detector setup and DAQ Data taking with 136 Xe and 238 U beams
Reminder of the experiment Production of extremely neutron-rich isotopes (two-step schemes: fission + cold fragmentation) n,p U 132 Sn + Be X Ground state properties of extremely neutron-rich isotopes Total interaction cross sections: rms matter distributions Proton knock-out: rms charge distributions, binding energies Proton and neutron pickup: charge versus mass distribution Eurisol DS: task 11 meeting March‘05
Experimental details S2-S4: Sn + Be X S0-S2: 238 U(950 A MeV)+Pb Sn Z/Z ~ B / ~ ToF ~ 150 ps L ~ 18 m A/A ~ Z/Z ~ B / ~ ToF ~ 150 ps L ~ 36 m A/A ~ Eurisol DS: task 11 meeting March‘05
Experimental details 238 U(1 A GeV)+d 1XX Sn 5 different settings centered on: 124 Sn, 126 Sn, 128 Sn, 130 Sn, 132 Sn Eurisol DS: task 11 meeting March‘05
Beam time request Projectile1 st FRS section2 nd FRS sectionBeam time 238 U(950 MeV) FRSCalibrations1 day 238 U(950 MeV) 124 Sn 124 Sn (int. + 1p) 123 Sn (pickup) 3 hours 7 hours 238 U(950 MeV) 126 Sn 126 Sn (int. + 1p) 125 Sn (pickup) 3 hours 7 hours 238 U(950 MeV) 128 Sn 128 Sn (int. + 1p) 127 Sn (pickup) 3 hours 7 hours 238 U(950 MeV) 130 Sn 130 Sn (int. + 1p) 129 Sn (pickup) 3 hours 7 hours 238 U(950 MeV) 132 Sn 132 Sn (int. + 1p) 131 Sn (pickup) 134 Sn (2p,3p,4p) 3 hours 7 hours 4 days Total requested time: main beam time ( 238 U) 7 days (21 shifts) parasitic beam ( 136 Xe) 5 days Eurisol DS: task 11 meeting March‘05
Present status of the work Eurisol DS: task 11 meeting March‘05 A new plastic scintillator detector is being built at GSI to be used as ToF start at S1 The experiment proposal was submitted and approved by the GSI PAC (18 shifts 136 Xe-parasitic and 18 shifts 238 U ) There are two options for the tracking at S2 (GEM or TPCs). We should decide on one of those Somebody should work on the new readout of ADCs We propose a special meeting to coordinate the preparations (participants outside EURISOL: CENBG, Finland) We will try to get the beam in the first block of 2006
Resources distribution Eurisol DS: task 11 meeting March‘05 EU contract resources: 2005: 6 man-month (student): 12 K€ + meetings 2 K€ 2006: 12 man-month (student): 24 K€ + meetings 2 K€ 2007: 12 man-month (student): 24 K€ + meetings 2 K€ 2008: 6 man-month (student): 12 K€ + meetings 2 K€ Other resources: 2005: traveling (preparation of beam time): 6 K€ 2006: traveling (beam time): 8 K€ : traveling (data evaluation): 6 K€