6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.

Slides:



Advertisements
Similar presentations
2 Fire Fighter Qualifications and Safety Skill Drills.
Advertisements

A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
Subpart R Steel Erection
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Rigging Equipment for Material Handling Your Safety is the #1 Priority
Cranes Safety M. Zaman Bhatti Manager HSE, National Refinery Limited
OSHA Office of Training & Education
OSHAX.org - The Unofficial Guide To the OSHA
Condensation Piping and Installation Drain Pans
Dr. Sophia Hassiotis.  Laboratory set up  Personal Protective equipment  Directions for mixing  Slump test  Cylinder casting  Cleaning up your station.
Overhead Crane Safety.
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
Senior Design: Validation of Design December 15, 2008.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
Rigging Requirements Part L “Cranes” and Part F-1 “NOT CRANES” Construction Safety Standard WAC Brad Solheim Department of Labor & Industries Crane.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
Steel Erection These handouts and documents with attachments are not final, complete, or definitive instruments. This information is for guidance purposes.
Ground Safety Review – Phase II September 8-10, 2008 Phil Mott
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
SAFETY PLAY OF THE WEEK Ergonomics in the Work Place.
NCSX Modular Coil Turning Fixture FDR. Background Modular Coil winding forms are cast structures which provide the foundation on which the coils are constructed.
CMS ZDC Remote Handling Status LTEX Meeting - Sept. 13, 2012 The Crane Testing and Development has moved from SX5 to ISR: Crane #2 has been fully assembled,
Floor Jacks and Stands Harkness Career Center. Floor Jacks Parts Identification.
ACADs (08-006) Covered Keywords Rigging, hoist, crane. Description Supporting Material b.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
ZDC inside TAN – Crane position over TAN slot – lifting beam lowered to ZDC ZDC Sarco TAN.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
ICARUS Collaboration Meeting Dec A. Scaramelli.
Single phase ProtoDUNE detector installation Plans and Constraints Jack Fowler Duke University 23-Feb-2016.
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
Single Phase ProtoDUNE TPC QA/QC Plans The SP TPC Team Jan. 13, 2016.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
SAFE DIE HANDLING FOR STAMPING PRODUCTION OPERATIONS UAW-GM SAFE DIE HANDLING FOR STAMPING PRODUCTION OPERATIONS Copyright © UAW-GM Health & Safety.
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
DECAM LN2 PUMP REMOVAL - CHECKLIST
VIEW SERIES with Sliding Door
Planning for Proto-DUNE PD Installation and Cabling at CERN
Automotive Engines Theory and Servicing
Baby-MIND Modules & Services
ProtoDUNE – DSS Installation, Alignment and QA
Schedule CM SPS G.Vandoni.
SBN Far Detector Installation & Integration
Escalator Installation
SOAR AZIMUTH DRIVE The SOAR azimuth drive systems has 4 motor+gearbox units, two pairs with backlash tuning. (600 kg box) Each subsystem is bolted to.
INSTALLATION SEQUENCE
Endcap shielding senarios:
Jack and Hoist Safety.
Warm Vessel South Wall Installation, Sub-assembly Option
Safe Rigging Practices
C50 Cavity pair Assembly Changes
Camera to Top End Assembly Integration Travis Lange Camera I&T M. E
Mounting a BalanceBox®650 to a brick wall
Cryomodule Assembly Plan
Synthetic Chain Wire Rope
Automotive Engines Theory and Servicing
Presentation transcript:

6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed

6-Mar-2016 Dan Wenman | Installation at CERN 2 Shipment of APAs The plan is to ship air ship the APA’s as they are completed and tested ($10k and10 days) APA’s will be double wrapped and shock mounted in the crates. 35ton being crated

6-Mar-2016 Dan Wenman | FC Installation 3 Option A for rotating APAs vertical Steps: Crate is lying on long edge and large “front”, top edge, and end covers are removed. Lift adaptors are added. In a coordinated move two cranes lift and rotate the APA frame. Ideally the frame is delivered to the beam that runs through the clean room Adapter could have an opening to allow for “threading” over the support beam C.G Is below the lift points. Requires: Crate on edge that allows for removal of the top sides and ends. Design of a suitable lift adapters that do not overstress the APA Proper safety factors for lift frames CERN safety test and approval ~10x6m floor space aligned with crane beam, crane, crane operator, small foot print man-lift

6-Mar-2016 Dan Wenman | FC Installation 4 Option B for rotating APAs vertical Two identical fixtures exist. One was built for Atlas and one for CMS Fixture is rated for 400kg and has been tested at 150% and approved by CERN for 400kg. Fine adjustment of the center of gravity to the rotational axis and adjustment of counter balance to control pitch allow for smooth operation. Estimated fully assembled APA weight with CE is 410kg. CE will not be installed when lifting. Requires: Approval from fixture “owner” Design of a suitable I-frame that does not overstress the APA Proper safety factors for APA and I-frame weight CERN safety test and approval ~10mx6m floor space, crane, crane operator, small foot print manlift to 3m, trained lift operator, trained fixture operator

6-Mar-2016 Dan Wenman | FC Installation 5 Edge lift and storage option

6-Mar-2016 Dan Wenman | FC Installation 6 Wire tension testing Tension test some quantity of random wires to compare to original wire tensions? Need to define what it means to pass or fail and what to do if tension test fails. Requires: A technician and tension testing equipment (presumably two tension systems exists, but they may be occupied) Test system mounting hardware that can safely test on a vertical APA Access to the entire wire plane while in the vertical position

6-Mar-2016 Dan Wenman | FC Installation 7 ToolsStatus Crane Rigging straps and shackles Wire tension tester and mounting system Mounting system needs to be designed Option A APA lifting adapters Needs to be designed and needs CERN Safety approval Option B Muon chamber lifterNeeds CERN approval I-Frame adapters for lifter Needs to be designed and needs CERN Safety approval Small foot print manliftNeeds to be specified

6-Mar-2016 Dan Wenman | FC Installation 8 Other testing Visually inspect for broken wires or other damage. Continuity testing? Requires a technician, a DMV, “comfortable” access to the wire and CRB boards. Cold testing after integrating with the CE.? Note: Chamber test data needs to be readily available and wire nomenclature easily understood to facilitate locating test data and recording data.

6-Mar-2016 Dan Wenman | FC Installation 9 Back up slides to follow.

6-Mar-2016 Dan Wenman | FC Installation 10 APA handling H spreader can be used to lift from a horizontal crate

6-Mar-2016 Dan Wenman | FC Installation 11 APA can be rested on four or more feet on jack stands while the interface frame is attached APA cart APA cart after delivery from the crate APA prepared for lifting with lifting and rotating fixture